State Significant Development
Oxley Solar Farm
Armidale Regional
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Development of a 215 MW solar farm with up to 50 MW of battery energy storage and associated infrastructure.
Attachments & Resources
Notice of Exhibition (1)
Request for SEARs (1)
SEARs (1)
EIS (11)
Response to Submissions (7)
Agency Advice (23)
Amendments (16)
Additional Information (6)
Recommendation (3)
Determination (2)
Approved Documents
There are no post approval documents available
Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
There are no enforcements for this project.
Inspections
There are no inspections for this project.
Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.
Submissions
DPI Fisheries
Comment
DPI Fisheries
Message
Attachments
ENVIRONMENT PROTECTION AUTHORITY
Comment
ENVIRONMENT PROTECTION AUTHORITY
Message
Attachments
DPI Agriculture
Comment
DPI Agriculture
Message
Attachments
TRANSPORT FOR NSW
Comment
TRANSPORT FOR NSW
Message
Northern Region and Outer Metropolitan team within TfNSW will be submitting the combined TfNSW Response. Please close out the [email protected] work assignment. Thank you for your consideration in this matter.
Robert Rutledge, Transport Planning Manager, TfNSW
Kevin Northey
Object
Kevin Northey
Message
Attachments
John Baker
Object
John Baker
Message
Dear Sir/Madam,
We refer to the above mentioned project:
Our property is located between 1 and 2 km to the East of the project location. Our property is located at 410 Silverton Road: approximately 530 acres. The project will be highly visible from many western facing aspects of our property. We believe the value of our property as well as it’s potential development options will be materially constrained if the project proceeds. For this reason, we are formally registering our objection.
Your sincerely,
John Baker
26 Mount Pleasant Drive
Singapore 298386
+65 9010 9067
WaterNSW
Comment
WaterNSW
Message
Regards Justine Clarke
Attachments
TransGrid
Comment
TransGrid
NSW Rural Fire Services
Comment
NSW Rural Fire Services
Jordan Hardaker
Object
Jordan Hardaker
Message
Attachments
Crown Lands
Comment
Crown Lands
Message
Page IX and page 4 it is stated under the proposal description for Lot 7003 and Lot 7004 DP 1060201 that ‘OSD would lease or purchase this land’. Lot 7003 and Lot 7004 DP 1060201 are Crown Reserves (number 566 gazetted 22 February 1878) for the purpose of Travelling Stock. As Crown Reserves administered by Crown Lands, being Travelling Stock Reserves (TSR), day to day management is under Northern Tablelands Local Lands Service (LLS) through the Local Lands Services Act 2013. Neither Crown Lands or LLS are in a position to ‘lease or sell’ Crown land gazetted as TSR.
The Local Lands Services Act 2013 enable land owners/managers to cross TSR to access properties and as such Oxley Solar Farm will retain the right to cross TSR for vehicle access under conditions from LLS. If powerlines (over or under) are proposed to cross the TSR, arrangements will need to be made with Crown Lands for an easement and/or licence.
No infrastructure outside of vehicle access and powerlines can be permitted at this stage on the TSR due to Native Title and Aboriginal Land Claims over this TSR. If any further infrastructure is proposed on the TSR, the proponent should discuss this with DPIE Crown Lands. It is noted in the EIS page 200 under ‘Crown land and paper roads’ that ‘Development would not occur within these areas of Crown land with the exception of intersection works along Waterfall Way’. This needs to be confirmed against page IX where Lot 7003 and Lot 7004 DP 1060201 is listed against ‘proposed solar farm infrastructure’.
The EIS correctly states that development on Crown roads (infrastructure or access roads) should not occur until Crown roads are closed and purchased by landholders or under licence (stated as lease in EIS) from Crown Lands. The Crown roads within the project area appear to be proposed for the solar farm access road, and infrastructure is proposed on Crown roads within Lot 6 DP 625427 and Lot 5 DP 253346. Crown Lands would prefer the remaining landholders to apply to close and purchase the Crown roads and the solar farm proponent to contact Crown Lands to arrange licences as required.
ROADS AND MARITIME SERVICES DIVISION
Comment
ROADS AND MARITIME SERVICES DIVISION
Message
Attachments
Heritage NSW – HERITAGE COUNCIL OF NSW
Comment
Heritage NSW – HERITAGE COUNCIL OF NSW
Message
Attachments
Amanda Van Taak
Object
Amanda Van Taak
Message
Attachments
Tammie Booth
Object
Tammie Booth
Message
Attachments
Graham Waters
Object
Graham Waters
Message
Graham.
Attachments
Bev Waters
Object
Bev Waters
Message
Please read my submission carefully.
Attachments
Jenna Walsh
Object
Jenna Walsh
Message
Please see my submission below.