Skip to main content
Back to Main Project

SSD Modifications

Determination

MOD 1 Modify podium envelope, increase GFA

City of Sydney

Current Status: Determination

Interact with the stages for their names

  1. Prepare Mod Report
  2. Exhibition
  3. Collate Submissions
  4. Response to Submissions
  5. Assessment
  6. Recommendation
  7. Determination

Proposed amendments to the podium envelope to facilitate better built form relationship with the adjacent buildings, permit projections beyond envelope, seek an additional 5,433 sqm of GFA, make changes to the approved Design Guidelines.

Attachments & Resources

Modification Application (11)

Response to Submissions (10)

Agency Advice (7)

Additional Information (3)

Recommendation (2)

Determination (4)

Consolidated Consent (1)

Submissions

Filters
Showing 1 - 12 of 12 submissions
ENVIRONMENT PROTECTION AUTHORITY
Comment
Sydney , New South Wales
Message
Based on the information provided, the OSD does not constitute a Scheduled Activity under Schedule 1 of the Protection of the Environment Operations Act 1997 (POEO Act). At this stage, the EPA does not consider that the proposal will require an Environment Protection Licence (EPL) under the POEO Act. The EPA understands that the proposal is not being undertake on behalf of a NSW public authority. The EPA is therefore not the appropriate regulatory authority for the environmental performance of the project.

Accordingly, the EPA has no comments regarding the proposal.

As an advisory note only, the future OSD will be located in close proximity to the operational rail network, for which EPA has a regulatory responsibility. Any future planning approvals permitting further development of the site should include acceptable vibration and ground-borne noise limits for spaces within the development drawn from the EPA’s Rail Infrastructure Noise Guideline (EPA, 2013) and Assessing Vibration: a technical guideline (DEC, 2006).
neil billington
Object
SHOALHAVEN HEADS , New South Wales
Message
I purchased a residential property, unit across the road in Park Regis Building with a VIEW of the city for retirement, you are now spoiling my dream. I will not have a view of the Hyde Park if this development goes ahead.
I will now have construction noise for the next three years irritating me and affecting my health.
I will now have shadowing from your building.
I will now have People looking into my windows from your building , and now loose my privacy.
Biodiversity and Conservation Division
Comment
PARRAMATTA , New South Wales
Message
Please find attached EES comments in response
Attachments
Name Withheld
Support
SYDNEY , New South Wales
Message
Good use of the airspace above a train station.
Interesting that GFA can be increased by over 10% while still comfortably fitting within the building envelope volume. I guess that is one of the rewards of having an efficient design.
John Austin
Object
SYDNEY , New South Wales
Message
I object to the bulk of the project as seen from Castlereagh Street, the building should be set back much further from the Castlereagh Street frontage. As it is currently designed it blocks the view of the cityscape and centerpoint tower in particular. This obstruction of the Castlereagh street view results in a blank wall where there was great depth of view. Most existing high rise buildings are set back from the Castlereagh street frontage which opens up a city view. It only takes one building such as this to destroy the cityscape created by the existing buildings, it is a very selfish and destructive design. No reasonable person should put their name in support of it.
CASA
Comment
Phillip , Australian Capital Territory
Message
Thank you for your emails of 16 July 2020 requesting comment from the Civil Aviation Safety Authority (CASA) on the Pitt Street North Over Station Development Modification (SSD-8875-Mod-1) and the Pitt Street North Over Station Development Stage 2 (SSD-10375).

CASA has reviewed the Aeronautical Impact Statement (AIS) for the Pitt Street North Over Station Development Stage 2 and has no issues with the assessment and no objections to the proposed building development. CASA assessed the building at a height of 188.6m above Australian Height Datum (AHD) under the Airspace Regulations 2007 on 6 February 2018. A copy of this assessment is attached for your information.

The Aeronautical Impact Assessment covers the tower cranes up to a height of 241m above AHD that will construct the building. In principal CASA has no objections to the tower cranes, however detailed recommendations for the tower will be made on receipt of an Invitation to Comment from Sydney Airport.

CASA has no specific comments on the Pitt Street North Over Station Modification Report.

I trust this information is of assistance.
Attachments
Heritage NSW – HERITAGE COUNCIL OF NSW
Comment
PARRAMATTA , New South Wales
Message
Please find attached letter from Heritage NSW.
Attachments
Department of Transport
Comment
Chippendale , New South Wales
Message
A copy of the TfNSW Response is attached.
Attachments
Water Group
Comment
,
Message
DPIE Water response is attached
Attachments
ROADS AND MARITIME SERVICES DIVISION
Comment
PARRAMATTA , New South Wales
Message
See attached.
Attachments
City of Sydney
Support
SYDNEY , New South Wales
Message
Hi James
See the City's response attached.
Regards,
Amy-Grace Douglas
Attachments
Sydney Water
Comment
Parramatta , New South Wales
Message
Please see our response attached
Attachments

Pagination

Project Details

Application Number
SSD-8875-Mod-1
Main Project
SSD-8875
Assessment Type
SSD Modifications
Development Type
Rail transport facilities
Local Government Areas
City of Sydney
Decision
Approved
Determination Date
Decider
Executive Director

Contact Planner

Name
James Groundwater