SSD-8825-Mod-2
Mod 2 - Transmission Line and Subdivision
Administrative correction to the 'Schedule of Lands' in Appendix 1 of the conditions of consent, update overhead transmission line connection to underground transmission line and subdivision of lots for the substation.

SSD-9670-Mod-5
Modification 5 - Amendment to signage zones
Amendment to approved signage zones.

MP06_0139-Mod-8
MOD 8 - Materials Processing Centre 2
Amendments to the Materials Processing Centre 2 (previously known as the Pre-Sort Enclosure), including changes to the building footprint, tip floor operations and machinery. Also includes the relocation of weighbridges and car parking spaces.

SSD-8677-Mod-2
Fairvale High School Mod 2 - External colours and finishes
Modification to Condition A2 to allow for a change in the colour of the finish of the external aluminium window and door frames in the new Block K , Block J and Block A from natural
anodized aluminium to a muted silver grey.

SSD-9210
Saints Peter and Paul Assyrian Primary School
Construction of a new primary school for up to 630 students from Kindergarten to Year 6.

SSD-10375
Pitt Street North Over Station Development Stage 2
Design and construction of Pitt Street North Over Station Development

SSD-8875-Mod-1
MOD 1 Modify podium envelope, increase GFA
Proposed amendments to the podium envelope to facilitate better built form relationship with the adjacent buildings, permit projections beyond envelope, seek an additional 5,433 sqm of GFA, make changes to the approved Design Guidelines.

SSD-9472
Sikh Grammar School Rouse Hill
Construction of a new School for students from Kindergarten to Year 12

SSD-5535-Mod-3
Modification 3 Wahroonga Adventist School (SSD 5535) – Modification Request (MOD-3)
Request for additional time to construct a signalised intersection at Fox Valley Road and new access road to the school and increase in school enrolments