Skip to main content

State Significant Development

Exhibition

Mixed Use Development at 16-20 Old Castle Hill Road, Castle Hill

The Hills Shire

Current Status: More Information Required

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Construction of a mixed use development of:
• 371 dwellings (including 42 affordable dwellings for 15yrs)
• One retail tenancy
• Six basement levels
Concurrent rezoning to include FSR to 12.31:1

Attachments & Resources

Notice of Exhibition (2)

Request for SEARs (2)

SEARs (3)

EIS (49)

Response to Submissions (19)

Agency Advice (7)

Additional Information (2)

Submissions

Filters
Showing 1 - 20 of 32 submissions
Name Withheld
Object
Castle Hill , New South Wales
Message
The size of the proposed building will considerably impact the natural light my apartment receives and will likely require me to install additional lighting to be able to use my lounge room during the day. The proposed height is unreasonably too tall, and will significantly ruin the current view and aesthetic of Castle Hill (noting the next closest building height is not even 20 floors). I welcome additional housing at a more reasonable height.
Name Withheld
Object
CASTLE HILL , New South Wales
Message
My objection relates to traffic congestion in the area surrounding this project, on Old Castle Hill Road, McMullen Avenue, Old Northern Road and Pennant Street. The area is badly congested already, and that is before the completion of three large high-rise apartment blocks currently under construction (on the corner of Pennant Street and Old Castle Hill Road) as well as other projects proposed for further north on Old Castle Hill Road. Once occupied they will add to the gridlock. The roads surrounding this 40 storey project would be unable to cope with increased trade vehicles during construction and tradespeople would have to be designated an off-site carpark and be shuttled to and from the site. Once the project is built and occupied, ingress and egress to and from the basement carpark is likely to be extremely difficult due to general road congestion in the surrounding streets, and access to Old Castle Hill Road for all residents of Garthowen Crescent will be significantly worse than it already is.
John Matthews
Object
Castle Hill , New South Wales
Message
please also refer to my objections to SSD-86460458

My objections to this application include both the construction of the 40 storey building and the rezoning required for it to be approved. They also cover both the construction phase and the long-term impacts of the development.

The application covers the mandatory compliance reports as far as I can see, and relies heavily on claimed consistency with NSW government housing policies, including the desire for more affordable housing. However, whilst acknowledging the impacts on local residents during the early works and construction phases and ongoing, claimed mitigants are unlikely to resolve several key concerns.

During construction I have significant concerns based on the experience of Garthowen residents
during the construction of 18 and 13 storey unit blocks at 6-12 and 16-20 Garthowen. This included noise, dust, illegal parking, out of hours work, blocked driveways and rubbish left in front of properties for two years. I have no reason to believe that the behaviour of construction staff and truck drivers would be any different during the 16-20 Old Castle Hill Rd project.

The problem is exacerbated by the pending commencement of 3 high rise unit blocks and a 19 storey hotel fronting Garthowen Crescent as approved in DA 366/2025/JP. I notice that these developments are conveniently ignored in the 16-20 Old Castle Hill Rd application. There is a comment about co-ordination with other developments that overlap, but it is difficult to see real co-operation between multiple, self interested developers and builders.

My objections are included in and consistent with the many objections covered in the Social Impact assessment prepared by Sarah Georg Consulting. I assume that assessment has been reviewed by the Department of Planning so will not reiterate them all.

However, I will comment specifically on the issue of traffic congestion. The entry to the proposed development will be in Garthowen, almost directly opposite the proposed entry to the new 19 storey hotel. That will create congestion both during and after construction. As described in the application, Garthowen is "a narrow local street", not suited to heavy traffic. The attached Traffic Report uses modelling that produces impressive looking but totally unrealistic outcomes. For example, it notes that by 2039 the average exit time from Garthowen into Old Castle Hill Rd will be 1-5 seconds. It already can take over 5 minutes.

One of the mitigants during construction is the employment of professional traffic managers. The competency of the staff employed in theses roles can vary greatly and they need to be independently overseen. At the very least, there should be a maximum delay period of around 5 minutes applied with appropriate penalties for non compliance.

Following completion of the project, the most significant ongoing issue will be traffic congestion. At present Garthowen Crescent struggles at times to handle the traffic from the residents of 266 units plus a few stand alone houses.Completion of the 40 storey building and the 3 unit blocks and hotel under DA366/2025/JP would increase this to the residents of 849 units plus stand alone houses. With an almost blind corner mid way along Garthowen, this would be both highly disruptive and dangerous for both drivers and pedestrians. It might be too late ato change DA 366/2025/JP but 16-20 Old Castle Hill Rd could be either stopped or scaled back to current zoning levels.

I understand the need for more housing in Sydney and for affordable housing, but this application for a 40 storey building is way over the top and an abuse of the planning process

John Matthews
Name Withheld
Object
CASTLE HILL , New South Wales
Message
My previous submission which mainly covered objection relating to traffic still stands, but I wish to add my objection to the re-zoning proposal which more than doubles the current floor space ratio from a maximum of 6:1 to 12.31:1
A 40 storey building will have a detrimental impact on views, shading and amenity for neighbouring properties and seems to be entirely inappropriate for this particular site, and I even wonder if the water/sewerage system will be able to cope.
Name Withheld
Object
Castle Hill , New South Wales
Message
I am the owner of land located in close proximity to the site at 16–20 Old Castle Hill Road, Castle Hill. I write in response to the public exhibition of State Significant Development Application SSD-85238209 and the associated proposal to amend The Hills Local Environmental Plan 2009 to permit a Floor Space Ratio (FSR) of up to 12.31:1.
This submission formally objects to the proposed mixed-use development and concurrent rezoning for the reasons outlined below.

1. Lack of Strategic Merit for the Proposed Rezoning
The proposal seeks a substantial amendment to planning controls under The Hills Local Environmental Plan 2009 to facilitate development well beyond the existing FSR permitted for the site. Such a rezoning should demonstrate clear strategic merit and alignment with the broader strategic planning framework, including:
The Greater Sydney Region Plan
The North District Plan
The Hills Local Strategic Planning Statement
The current proposal does not provide adequate justification as a strategically coordinated change to land use. Rather, it appears to be a site-specific intensification that exceeds the density anticipated in the strategic framework. This raises material planning concerns regarding overdevelopment, precedent-setting, and inconsistency with the broader urban planning objectives for Castle Hill.

2. Metro Station Precinct / FSR Incompatibility
Although the site is located within the Castle Hill Metro station precinct, the proposed FSR of 12.31:1 significantly exceeds the density envisaged in both The Hills LEP 2009 and the North District Plan for this precinct. Metro precinct planning anticipates staged and coordinated growth, balancing high-density development near transport nodes with lower-rise surrounding areas. Concentrating such extraordinary density on a single site is inconsistent with these requirements and increases the risk of:
Inadequate infrastructure provision (transport, utilities, open space)
Unmanageable traffic impacts on Old Castle Hill Road and surrounding streets
Significant overshadowing, light spill, and amenity loss for neighbouring properties
This is a material consideration the Department must assess when determining whether the rezoning and development are justified.

3. Overdevelopment and Amenity Impacts
The proposed 40-storey tower is substantially taller than surrounding low-rise development and lacks an appropriate transitional scale to neighbouring properties. The resulting bulk and height will:
Visually dominate adjacent streets and residences
Overshadow neighbouring dwellings and private open spaces
Increase light spill and noise impacts
Compromise residential amenity and the character of the local neighbourhood
The Hills LEP 2009 explicitly requires development to be compatible with the surrounding urban context, and this proposal does not demonstrate adequate measures to mitigate its overbearing impact.

4. Traffic, Infrastructure, and Community Impacts
The introduction of 371 dwellings, with only 42 proposed as affordable housing for 15 years, will generate significant additional traffic, placing further pressure on Old Castle Hill Road and surrounding streets. Infrastructure capacity (including public transport, utilities, and community facilities) appears insufficient to support the proposed intensity of development without adverse effects on neighbouring residents.

5. Environmental and Construction Impacts
The concurrent Early Works application involves demolition, bulk excavation, and tree removal, resulting in:
Loss of local vegetation and urban tree canopy
Disruption to local wildlife and biodiversity
Noise, vibration, and dust impacts for an extended construction period
These early works further exacerbate the cumulative impacts of the development and reduce environmental amenity in the area.

6. Limited Public Benefit
While the development includes 42 affordable dwellings for a 15-year period, this represents a relatively modest public benefit when weighed against the scale and intensity of the development. For a proposal requesting a significant departure from planning controls, a more substantial and enduring contribution to the community would be expected.

Conclusion
For the reasons outlined above, the proposed development and associated rezoning:
Lack strategic merit and are inconsistent with the broader planning framework
Exceed FSR guidance for the Castle Hill Metro precinct, undermining staged and coordinated growth
Represent overdevelopment relative to the surrounding low-rise neighbourhood
Impose unacceptable traffic, infrastructure, environmental, and amenity impacts
Deliver limited public benefit relative to the scale of the project
Accordingly, I respectfully request that the NSW Department of Planning, Housing and Infrastructure give careful consideration to these matters and refuse the rezoning and the associated development in its current form.
For these reasons, I formally object to State Significant Development Application SSD-85238209.
Name Withheld
Object
CASTLE HILL , New South Wales
Message
I wish to formally express my concerns regarding the proposed mixed-use residential development at 16-20 Old Castle Hill Rd. While I recognise the importance of housing supply and transit oriented development near the Castle Hill Metro Station, the proposed scale and design raise significant concerns regarding overshadowing, privacy, urban form, traffic impacts and consistency with the overall Hills Shire planning framework.

1) Excessive Height and Overdevelopment
The proposed 40-storey building represents a significant increase in scale relative to the surrounding built (and planned) environment. Notably, a previous submission for the site proposed approximately 26 storeys was already considered high density at the time. Nearby residential developments generally do not exceed ~24 storeys, including the recently constructed apartments at 8-18 Garthowen Crescent and the planned works at 1/28 Garthowen Crescent. The proposed increase to 40 storeys represents a substantial departure from the established and emerging scale of developments in the precinct. This raises concerns under Section 5.4D of the Hills Development Control Plan that requires towers to "include slender designs so as not to be overwhelming in bulk and scale".

2) Overshadowing and Loss of Solar Access
Height and bulk of proposed works will likely generate significant overshadowing impacts on surrounding residential and public property. Under Objective 4A1 of the Apartment Design Guide development should be designed to minimise overshadowing impacts on neighbouring properties and maintain adequate solar access. The ADG also states that "living rooms and private open spaces should receive a minimum of 2 hours of direct sunlight between 9am and 3pm in mid-winter". Given the location and extreme height of the proposed tower, there is a strong likelihood that this is a realistic concern for neighbouring property. This also relatives to Section 5.2D of the Hills DCP which seeks to "ensure adequate separation between buildings on different sites to alleviate amenity impacts including privacy, daylight access, acoustic control and natural ventilation."

3)) Privacy and Overlooking Impacts
Due to height and proximity of proposed tower, there are concerns regarding direct overlooking and loss of visual privacy which impede on Objective 3F-1 of the ADG. Proposed tower height and proximity may result in direct sightlines into neighbouring balconies and living areas, overlooking of bedrooms and private open spaces and reduced residential amenity for existing and future residents. These impacts may be particularly pronounced for neighbouring apartment buildings where balconies and living spaces face toward the proposed tower.

4) Inadequate Tower Separation and View Corridors
Given proposed location and height, it is important that sufficient setbacks and separation distances are maintained. This pertains mostly to Section 5.4D of the Hills DCP.

5) Traffic and Infrastructure Impacts
The proposal must also be considered within the broader context of significant development occurring throughout the Castle Hill precinct. With approximately 330 apartments the development will generate a substantial increase of stress in vehicle movements, service/delivery traffic and local parking demand. Given the infamous traffic concerns that already exist around Castle Towers and the right turn into Old Caslte Hill Road from McMullen Avenue without the development of 1/28 Garthowen Crescent, I strongly question the sustainability of current further development (to this scale) without significant plans from council to develop traffic management plans (outside of the already planned roundabout). Given the cumulative impact of nearby developments (the new apartments on Old Castle Hill Road are also not yet occupied) a comprehensive traffic and infrastructure impact assessment should be undertaken to ensure that the road network can accommodate the additional demand. Examples of overdevelopment across Carlingford and Epping (e.g. Cliff Rd, Maida Rd) have seen a deterioration of value, charm and convenience.

6) Construction and Excavation Impacts
While more related to the Early Works of 16-20 Old Castle Hill Road, development for multiple levels of basement parking while adjacent to McMullen Avenue is an additional concern.

7) Inconsistency with the "Garden Shire" Character
A key objective of the Hills planning framework is to preserve the "Garden Shire" character of the area. This work undermines the character by reducing visual openness, diminishing green space between buildings and creating a dense urban mass. While increased density near transport hubs is expected, development should still maintain appropriate building proportions, spacing and landscaping.

8) Saleability
Given the pipelines of developing and planned apartments in the area, the impetus for further large scale works is highly questionable as we do not yet understand the stress and impacts of new works as they become occupied. The ability for these new apartments to be built (and overall appetite) is an additional concern and the success of recent and upcoming buildings should be closely monitored.

For the above reasons. I respectfully request that the proposal not proceed in its current form and that significant revisions be required to better address local planning objectives.
Name Withheld
Object
CASTLE HILL , New South Wales
Message
FORMAL SUBMISSION – OBJECTION
Proposed Mixed Use Development and Rezoning
Site: 16–20 Old Castle Hill Road, Castle Hill NSW
Application: SSD 85238209
Consent Authority: NSW Department of Planning, Housing and Infrastructure
1. Introduction
I lodge this submission to formally object to the proposed mixed use development at 16–20 Old Castle Hill Road, Castle Hill.
The proposal seeks approval for:
• Approximately 371 residential dwellings, including 42 affordable dwellings for a period of 15 years
• A 40 storey residential tower
• Six basement levels
• A proposed FSR of 12.31:1 as part of a concurrent rezoning
While increased housing supply and transit oriented development are legitimate planning objectives, the proposal represents a substantial overdevelopment of the site and is inconsistent with key statutory, strategic, and urban design requirements.
2. Section 4.15 – Environmental Planning and Assessment Act 1979
Under Section 4.15, the consent authority must consider:
• Environmental planning instruments
• The likely impacts of development
• Suitability of the site
• The public interest
The proposal raises serious concerns across each of these considerations.
3. Strategic Planning Inconsistency
The proposal is inconsistent with the following strategic planning frameworks:
• Greater Sydney Region Plan – A Metropolis of Three Cities
• Central City District Plan
• The Hills Future 2036 Local Strategic Planning Statement (LSPS)
Although Castle Hill is identified as a Strategic Centre, these frameworks require density to be coordinated with infrastructure capacity and appropriate built-form transitions.
A 40 storey tower significantly exceeds the scale typically envisaged for suburban strategic centres and risks undermining orderly and coherent planning outcomes.
4. Excessive FSR and Overdevelopment
The proposed FSR of 12.31:1 is extremely high relative to the site context.
Concerns include:
• Excessive bulk and scale
• Reduced tower separation
• Poor environmental performance
• Cumulative overcrowding within the precinct
Land and Environment Court (LEC) principles consistently hold that development must not result in an unacceptable level of site overdevelopment, even if technically permissible.
5. Apartment Design Guide and SEPP (Housing) 2021 Compliance
The proposal raises significant concerns under the Apartment Design Guide (ADG) as required by SEPP (Housing) 2021, including:
• Building separation and privacy: potential overlooking and loss of visual amenity
• Solar access: many apartments may not receive the ADG minimum 2 hours direct sunlight in winter; surrounding properties and public spaces will also be overshadowed
• Deep soil zones and landscaping: constrained by six basement levels and high site coverage, undermining environmental performance and urban greenery
6. Traffic and Infrastructure Impacts
Approximately 371 additional dwellings will place significant strain on existing infrastructure:
• Road congestion: Old Castle Hill Road, Old Northern Road, and Castle Towers precinct
• Public transport: Castle Hill Metro station may not accommodate the additional demand
• Schools, community services, and public open space are already under pressure
The proposal fails to demonstrate adequate infrastructure capacity to accommodate this scale of development.
Strategic planning policies emphasise that infrastructure must lead development, not respond to it.
7. Insufficient Community Benefit
The proposal provides 42 affordable dwellings for only 15 years, which is disproportionate given the significant height and density uplift sought.
For a project of this scale, the following would normally be expected:
• Permanent affordable housing
• Public open space or plazas
• Major public domain improvements
The current proposal provides insufficient public benefit to justify the scale of development.
8. Urban Design, Amenity, and Construction Impacts
• The 40 storey tower would dominate the Castle Hill skyline, creating abrupt visual transitions and poor urban design integration
• Overshadowing and loss of amenity to surrounding properties are likely
• Six basement levels raise concerns regarding:
o Noise and vibration
o Construction traffic
o Groundwater management
o Structural impacts on neighbouring properties
9. Failure to Demonstrate Strategic Merit
The proposal effectively seeks a site-specific rezoning driven by a single development outcome, rather than being justified by a broader precinct strategy.
Strategic merit requires that a proposal:
• Aligns with regional and district planning frameworks
• Supports orderly, efficient, and coordinated development
• Maintains the integrity of planning controls
The proposal does not demonstrate strategic merit and may undermine the integrity of the planning framework.
10. Risk of Undesirable Planning Precedent
Approving a development of this scale could establish a planning precedent for similar extreme height and density proposals in Castle Hill.
Consequences include:
• Incremental erosion of established planning controls
• Cumulative overdevelopment of the precinct
• Increased pressure on infrastructure and amenity
11. Cumulative Impact
The Department must consider cumulative impacts within the Castle Hill Strategic Centre:
• Traffic congestion
• Reduced solar access and overshadowing across the precinct
• Strain on public domain quality
• Potential “tower-in-the-park” outcomes inconsistent with coordinated urban design
12. Land and Environment Court (LEC) Precedents
The following LEC decisions reinforce the issues identified:
1. Project Venture Developments v Pittwater Council [2005] NSWLEC – Development must not result in unacceptable site overdevelopment
2. Tenacity Consulting v Warringah Council [2004] NSWLEC – Development must respond to context and be compatible with surrounding built form
3. Roseth SC Pty Ltd v North Sydney Council [1999] NSWLEC – Development must protect amenity of neighbouring properties and public spaces
13. Public Interest
Planning decisions must balance housing delivery with amenity, infrastructure, urban design quality, and sustainability.
The proposal does not satisfy the public interest, given the scale, inadequate infrastructure planning, and insufficient community benefits.
14. Conclusion and Requests
The proposal represents an excessive and unjustified intensification of the site. It is inconsistent with:
• Environmental Planning and Assessment Act 1979
• Strategic planning frameworks
• Apartment Design Guide (ADG) and SEPP (Housing) 2021
• Established LEC principles
I respectfully request that the NSW Department of Planning refuse the application in its current form.
Should the Department consider approval, substantial redesign is required, including:
1. Significant reduction in building height
2. Significant reduction in FSR
3. Demonstration of adequate infrastructure capacity for the proposed scale
4. Provision of stronger and permanent community benefits, including affordable housing and public open space
Additionally, I request that this submission be formally considered in the Department’s Assessment Report, ensuring that each concern is addressed prior to any determination.
Name Withheld
Object
CASTLE HILL , New South Wales
Message
To the Planning Officer,

I am writing as a resident of the Grand Reve complex to formally lodge my strong objection to the proposed 40-story high-rise development in our immediate vicinity. My family and I are deeply concerned about the unsustainable densification of this precinct. Our objection is based on the following grounds:

1. Cumulative Impact and Fairness to Existing Residents
In November 2025, the Department approved four high-rise towers including commercial hotel space on Garthowen Crescent. Despite strong community opposition, that project proceeded. As residents of Grand Reve (completed in 2025), we purchased our properties under the understanding of a specific local character.

It is profoundly unfair that while our building was capped at a lower height (under 20 stories), the Department is now considering 40-story towers in the same immediate area. We were not provided with transparent long-term master-planning advice prior to our settlement. Approving further massive towers now will exacerbate the "canyon effect," noise pollution, and traffic gridlock that we are already bracing for.

2. Infrastructure Saturation and Traffic Failure
The current proposal for another 40-story tower will lead to a total failure of the local road network.

Congestion: Garthowen Crescent and Old Castle Hill Road cannot support the exponential increase in vehicle movements.

Inadequate Planning: We have yet to see a traffic management or urban infrastructure plan that convincingly demonstrates how these thousands of new residents will move safely and efficiently through the area.

Amenity: The noise and dust from continuous construction are already reaching intolerable levels.

3. Economic Viability and Better Land Use
Based on financial and market analysis of current developments at 51-53 Old Castle Hill Road, there is significant doubt as to whether the market can absorb this volume of high-density stock. Piling excessive high-rise developments into this small pocket is a high-risk urban strategy.

We support controlled, sensible development. If the government seeks to meet housing targets, a transition to medium-density (Townhouses or low-rise apartments) would be far more appropriate. This approach maximizes land utility while preserving the "sense of space," sunlight, and neighborhood character that makes Castle Hill a desirable place to live.

4. Neglect of Resident Welfare and Local Maintenance
Current residents are already suffering from neglected local maintenance, including overgrown vegetation, debris, and excessive construction noise. Despite multiple complaints lodged with The Hills Shire Council, we feel our voices as ratepayers are being ignored in favor of developer interests.

The government has a duty of care to protect the interests and well-being of existing homeowners. We do not feel that our quality of life is being weighed fairly against the pursuit of high-density yields.

Conclusion
For our family and many of our neighbors, this proposal represents a tipping point toward a lower quality of life. We are resolutely opposed to further high-rise approvals in this precinct. We urge the Department to reject this 40-story proposal and reconsider a lower-density master plan that respects the existing community.

Sincerely
John Quah
Object
Castle Hill , New South Wales
Message
The objection is purely on the basis of the size of the proposed building being built. When I purchased my unit in 2018, it was proposed to me with views of the city CBD. With this development, I will lose the view which will depreciate the value of my unit.
Regretfully, the value of my unit already has declined due to the Developer going into Administration just before the settlement of the purchase in 2021.
With the proposed building and its location, the value of my property would further depreciate and will have a significant financial impact on me and my family.
Name Withheld
Object
Castle Hill , New South Wales
Message
Castle Hill has overly been developed with a number of high-rise buildings completed or close to completion. The proposed 40-storey buildings will be an eye sore of the Castle Hill area. It will block the nearby low-rise buildings or houses from the current tree view, sunlight and natural scenery. With so many apartments proposed in this project, it will bring too many people living in a focus area impacting the public space, traffic, environment (noise / dust / blocking of sun ray) to the nearby residential area. This impacts particularly on the residents at Garthowen Crescent where the residents enjoying nice tree view, sunset, clean air and quiet traffic. The 40-storey building is going to block the view, sunset and bringing more congestion to the area, in particular those living at Garthowen Crescent. There will also be an increase in traffic accidents in particular the junction near Garthowen Crescent, Old Castle Hill Road and McMullen Ave. The additional influx of residents will put high pressure on parking space during shopping at the Castle Tower. Moreover, there is no relevant increase in schooling, medical service providers, natural reserves and relevant infrastructure to meet the demand for the abrupt growing population. This project will also bring down the value of the residential buildings located nearby. Castle Hill, while remaining leavy in the past few years, changes abruptly to become another concrete forest. This project will only bring down the environmental value of Castle Hill. The government should resolve the issue of increasing population by cutting migration quota, not by building more high-rise.
Daniel Mendes
Support
Chatswood , New South Wales
Message
I support the project
Endeavour Energy
Comment
Parramatta , New South Wales
Message
Please refer to the attached documents.
Attachments
Name Withheld
Object
Castle hill , New South Wales
Message
Too much traffic and too many apartments in this small area
Name Withheld
Object
Castle Hill , New South Wales
Message
Too many apartments with traffic congestion
Alan Williamson
Comment
Castle Hill , New South Wales
Message
The height of the proposed development, 40 storeys stepping down to 29 storeys, is unacceptable for this part of Castle Hill. It is out of character with the existing built environment which has a mix of apartments not exceeding 20 storeys, town houses and houses. The Hills Shire Council's Castle Hill Precinct Plan allowed for a 20 storey apartment building on that cite. Lower scale design could achieve the aims of providing additional housing near a Metro. Potential wind noise needs to be considered also in the building's design as it has become a problem for residents living in the Reve Development and the neighbourhood. The living amenity of existing residents needs to be given proper consideration in this development proposal.
The development in its current form is likely to add to the already high traffic traffic congestion on the surrounding roads not designed for such a development. Road widening is suggested, without any evidence, as a solution. The planning and time line for this needs to be cited. Also, the traffic impact data cited is 2021. More up to date data should be cited as traffic congestion and access to Garthowen Crescent for residents, existing and proposed, needs to be considered particularly as driveway access to the development will be from that street, conflicting with driveway access to a proposed hotel development opposite.
The Metro is already at peak capacity in morning and afternoon peak times. A development of this scale together with the Skyview development when it is completed will aconsiderably add to problems of the Metro at peak times.
The development will put considerable pressure on existing public open space. Arthur Whitiling Park and Eric Felton Reserve are cited in the application but neither can meet the need for the required communal open space, particularly the latter, which is at a busy intersection and adjacent to the five towers, 964 apartments, Skyview development. Some of the underutilized land on the building site in the planning proposal could be used for communal public open space.
In summary, a maximum height of 20 storeys and commensurate reduction in apartment numbers might be acceptable in this part of Castle Hill and not impact as seriously as that currently proposed on the roads, traffic, the living amenity of existing residents and the visual appeal of developments around the Metro in this part of Castle Hill.
Alan Williamson
Thelma Jamieson
Object
CASTLE HILL , New South Wales
Message
Attachments
Patricia Sullivan
Object
CASTLE HILL , New South Wales
Message
I formally object to the proposed development on the following grounds:

Failure to Acknowledge Approved Developments
The proposal does not reference the recent approval of four high-rise towers at the intersection of Garthowen Crescent and Old Castle Hill Road. These towers, ranging from 23 to 24 storeys, include a hotel on the corner opposite the proposed site. Proper planning assessment must consider cumulative impacts of all approved developments in the area.

Traffic and Safety Implications
All approved towers will access Garthowen Crescent via individual driveways. This small suburban crescent is not designed to accommodate the resulting volume of vehicular traffic. The concentration of multiple driveway entries will:

Significantly increase congestion, particularly during peak hours

Compromise pedestrian and cyclist safety

Reduce emergency vehicle access and overall street amenity

The current proposal fails to consider these cumulative traffic impacts, creating a substantial risk to local road safety.

Impact on Local Amenity and Character
The combination of the approved towers and the proposed development would alter the suburban character of Garthowen Crescent, overshadowing existing residences and increasing noise, traffic, and visual intrusion. Proper assessment of the impact on local amenity is essential.

Conclusion
I request that the planning authority:

Fully acknowledge the approved towers and incorporate their cumulative effects into the assessment

Conduct a detailed traffic and safety impact study for Garthowen Crescent

Consider the adverse impacts on local amenity, safety, and character before approving any further development

The proposed development, as currently submitted, is inconsistent with responsible planning principles and the safe, sustainable management of the local area.
Drew Frost
Object
Castle Hill , New South Wales
Message
I am a resident living immediately adjacent to the proposed development site at 16–20 Old Castle Hill Road. My apartment is located on Level 10 in the building directly east of the site, directly neighbouring the proposed development. Due to the immediate proximity of my residence to the project boundary, I have significant concerns regarding the impacts of the proposed early works and the broader development on neighbouring residents.

My primary concern relates to privacy and overlooking. A development of this scale located directly next to existing residential buildings raises serious issues regarding direct sightlines into neighbouring apartments and private living spaces. Without adequate building setbacks, separation distances and screening measures, the proposal has the potential to significantly reduce the privacy of existing residents. This is particularly concerning for upper-level apartments such as mine that are positioned at a similar height to the proposed development.

I am also concerned about the visual bulk and scale of the development when viewed from neighbouring residential buildings. A development comprising hundreds of apartments with multiple basement levels represents a substantial increase in built form immediately adjacent to existing residential buildings. The scale of the proposal appears excessive relative to surrounding development and risks creating an overbearing presence for neighbouring residents.

The proposed six levels of basement excavation raises serious concerns regarding construction impacts, including noise, vibration, dust and heavy vehicle movements over an extended period of time. Deep excavation works are typically one of the most disruptive phases of construction and may last many months. As my residence is located immediately next to the site, I am concerned about the potential impacts of prolonged excavation activity on nearby buildings and residents.

Importantly, I work from home full-time, which means that I will be directly exposed to construction noise and disturbance throughout the entire work week. Continuous construction noise during permitted working hours (7am–6pm weekdays) has the potential to significantly impact my ability to work effectively from my home. The proposal therefore raises substantial concerns regarding the loss of residential amenity for neighbouring residents who rely on their homes as work environments.

I am also concerned about construction traffic and safety, particularly the movement of large trucks associated with excavation and removal of soil from the site. Given the scale of excavation proposed for six basement levels, this is likely to result in significant truck movements that may affect local traffic conditions and safety for residents.

Given the scale of the proposal and its immediate proximity to existing residential buildings, I request that the Department carefully assess the impacts on neighbouring residents. In particular, I request that strong conditions be imposed to address privacy impacts, building separation distances, construction management, noise mitigation, vibration monitoring and construction traffic management.

As a directly neighbouring resident, I ask that the Department give careful consideration to the significant amenity impacts that this development may impose on existing residents living immediately adjacent to the site.
Sandra Smith
Object
Sarah Ferguson
Object
Castle Hill , New South Wales
Message
Please see attached letter.

Kind regards,
Attachments

Pagination

Project Details

Application Number
SSD-85238209
Assessment Type
State Significant Development
Development Type
HDA Housing
Local Government Areas
The Hills Shire
Exhibition Start-End Date
-

Contact Planner

Name
Sian Holmes