State DA
Determination
MP07_0026 07_0026 Residential Community (Concept Plan)
Ballina
Determination Documents (166)
Artist's Perspectives
1.pdf
Artist's Perspectives
5.pdf
Report Illustrations
6.1 SEPP 71 Masterplan.pdf
4. Response to Submissions
Appendix A - C1 Concept Plan.pdf
4. Response to Submissions
Appendix A - C9 Building Heights.pdf
4. Response to Submissions
Appendix B - P3 Landscape Plan.pdf
4. Response to Submissions
Appendix B - P7 Erosion and Sediment Control Plan.pdf
4. Response to Submissions
Appendix B - Site Plan.pdf
4. Response to Submissions
Appendix H - Road Long Sections.pdf
4. Response to Submissions
Appendix M - Development Consent 1999_248.pdf
4. Response to Submissions
Appendix M - Drawings Part 5.pdf
4. Response to Submissions
Appendix M - Drawings Part 9.pdf
1. Application and Declaration
Application Form.pdf
Concept Plan Illustrations
C2 Green Networks.pdf
Appendix F Design Guidelines
Design Guidelines Part 1.pdf
Volume 1
Environmental Assessment Report.pdf
Appendix B Ecological Assessment
Figure 1.3 Site Analysis.pdf
Appendix M Bushfire Assessment
Figure 3.2 Topography.pdf
Appendix B Ecological Assessment
Figure 4.2 Significant Features.pdf
Appendix C Hairy Joint Grass Management Strategy
HJG Management Strategy Appendix A.pdf
4. Response to Submissions
Illustration 1.6 Wetland Survey Plan.pdf
4. Response to Submissions
Illustration 1.7 Open Space Comparison.pdf
4. Response to Submissions
Illustration 2.2 Stage 1 Asset Protection Zones.pdf
Project Application Illustrations
Planting Schedule 5.pdf
Appendix I Project Engineering Report
Section 4 Figure 4.3.pdf
Appendix I Project Engineering Report
Section 4 Figure 4.4.pdf
Appendix I Project Engineering Report
Section 4 Figure 4.5.pdf
Appendix H Concept Plan Engineering Report
Sections 1-3.pdf
Report Illustrations
The Site.pdf
Appendix K Visual Assessment
Visual Assessment Report.pdf
Artist's Perspectives
4.pdf
Appendix H Concept Plan Engineering Report
Appendix 1.pdf
Appendix H Concept Plan Engineering Report
Appendix 5 Part 1.pdf
Appendix H Concept Plan Engineering Report
Appendix 5 Part 4.pdf
4. Response to Submissions
Appendix A - C11 Conservation Zone.pdf
4. Response to Submissions
Appendix A - C3 Indicative Neighbourhood Centre.pdf
4. Response to Submissions
Appendix A - C5 Development Staging.pdf
4. Response to Submissions
Appendix A - C6 Movement Network.pdf
4. Response to Submissions
Appendix B - P4 Stormwater Plan.pdf
4. Response to Submissions
Appendix C - Statement of Commitments.pdf
4. Response to Submissions
Appendix D - Threatened Species Assessment.pdf
Volume 2
Appendix D Enquiry By Design Outcomes.pdf
4. Response to Submissions
Appendix E - Updated Noise Report.pdf
4. Response to Submissions
Appendix G - Servicing Plans.pdf
Volume 2
Appendix G Indicative Road Sections.pdf
Volume 2
Appendix J Heritage Report.pdf
4. Response to Submissions
Appendix K - Intersection Analysis.pdf
4. Response to Submissions
Appendix M - Drawings Part 1.pdf
4. Response to Submissions
Appendix M - Drawings Part 10.pdf
4. Response to Submissions
Appendix M - Drawings Part 2.pdf
4. Response to Submissions
Appendix M - Drawings Part 6.pdf
4. Response to Submissions
Appendix M - Drawings Part 7.pdf
Appendix M Bushfire Assessment
Bushfire Assessment Report.pdf
Concept Plan Illustrations
C1 Concept Plan.pdf
Concept Plan Illustrations
C10 Setback Plan.pdf
Concept Plan Illustrations
C4 Indicative Retirement Village.pdf
Concept Plan Illustrations
C5 Development Staging.pdf
Concept Plan Illustrations
C6 Movement Network.pdf
Concept Plan Illustrations
C7 Stormwater Concept Plan.pdf
Concept Plan Illustrations
C8 Lot Typologies.pdf
5. Determination
Concept Plan.pdf
Volume 2
Cover Page and Table of Contents.pdf
Appendix F Design Guidelines
Design Guidelines Part 2.pdf
Appendix A DGRs
DGRs Part A.pdf
Appendix B Ecological Assessment
Figure 2.1 Concept Plan.pdf
Appendix M Bushfire Assessment
Figure 2.3 Significant Features.pdf
4. Response to Submissions
Illustration 1.1 Illustrative Master Plan.pdf
4. Response to Submissions
Illustration 1.9 Deposited Plan.pdf
4. Response to Submissions
Illustration 2.5 Concept Plan Catchment Areas.pdf
Project Application Illustrations
P1 Project Application.pdf
Project Application Illustrations
P3 Stage 1 Landscape Plan.pdf
Project Application Illustrations
P4 Stormwater Management Plan.pdf
1. Application and Declaration
Preliminary Assessment.pdf
Appendix I Project Engineering Report
Section 1.pdf
Appendix I Project Engineering Report
Section 3.pdf
Appendix I Project Engineering Report
Section 4 Figure 4.7.pdf
Appendix I Project Engineering Report
Section 4.pdf
Project Application Illustrations
Site Plan.pdf
Concept Plan Illustrations
2_Site Plan.pdf
Appendix K Visual Assessment
Visual Assessment Sections.pdf
Report Illustrations
2.4 Slope Analysis.pdf
Artist's Perspectives
2.pdf
Report Illustrations
6.2 Zoning.pdf
Report Illustrations
6.3 Acid Sulphate.pdf
Artist's Perspectives
6.pdf
Artist's Perspectives
7.pdf
Appendix H Concept Plan Engineering Report
Appendices 3-4.pdf
Appendix H Concept Plan Engineering Report
Appendix 5 Part 2.pdf
4. Response to Submissions
Appendix A - C2 Green Networks Plan.pdf
4. Response to Submissions
Appendix A - C8 Lot Typologies.pdf
4. Response to Submissions
Appendix A - Site Plan.pdf
4. Response to Submissions
Appendix B - P1 Project Application.pdf
4. Response to Submissions
Appendix B - P8 Erosion and Sediment Control Details.pdf
Volume 2
Appendix L Mosquito Risk Assessment.pdf
4. Response to Submissions
Appendix M - Drawings Part 3.pdf
5. Determination
Concept Plan Approval.pdf
Volume 1
Cover page and Table of Contents .pdf
Appendix A DGRs
DGRs Part B.pdf
2. Director-General's Requirements
Director General's Requirements Part 2.pdf
5. Determination
Director-General's Environmental Assessment Report.pdf
Appendix M Bushfire Assessment
Figure 2.1 Site Locality Plan.pdf
Appendix M Bushfire Assessment
Figure 2.2 Zoning.pdf
Appendix M Bushfire Assessment
Figure 2.4 Concept Plan.pdf
Appendix M Bushfire Assessment
Figure 2.5 Development Staging.pdf
4. Response to Submissions
Illustration 1.2 Neighbourhood Centre Main Street Comparison.pdf
4. Response to Submissions
Illustration 1.5 Recorded Locations of Hairy Joint Grass.pdf
4. Response to Submissions
Illustration 1.8 Regional Fauna Corridor Plan.pdf
4. Response to Submissions
Illustration 2.3 Stage 1 Asset Protection Zones for Subdivision.pdf
4. Response to Submissions
Illustration 2.6 Concept Stormwater Channel Sections.pdf
Project Application Illustrations
P6 Design Contours.pdf
Project Application Illustrations
Planting Schedule 4.pdf
4. Response to Submissions
Preferred Project Report.pdf
5. Determination
Project Application Plan.pdf
5. Determination
Project Approval.pdf
Appendix I Project Engineering Report
Section 2.pdf
Appendix I Project Engineering Report
Section 5.pdf
Report Illustrations
2.2 Site Context.pdf
Report Illustrations
2.3 Site Analysis.pdf
Artist's Perspectives
3.pdf
Report Illustrations
8.1 Ecological Items.pdf
Report Illustrations
8.3 Hairy Joint Grass.pdf
Appendix H Concept Plan Engineering Report
Appendix 2.pdf
Appendix H Concept Plan Engineering Report
Appendix 5 Part 3.pdf
Appendix H Concept Plan Engineering Report
Appendix 5 Part 5.pdf
4. Response to Submissions
Appendix A - C10 Setbacks.pdf
4. Response to Submissions
Appendix A - C4 Indicative Retirement Community.pdf
4. Response to Submissions
Appendix A - C7 Stormwater Concept Plan.pdf
4. Response to Submissions
Appendix B - P2 Subdivision Plan.pdf
4. Response to Submissions
Appendix B - P5 Bulk Earthworks.pdf
4. Response to Submissions
Appendix B - P6 Final Design Contours.pdf
4. Response to Submissions
Appendix B - Plant Schedules.pdf
Volume 2
Appendix E Urban Design Report.pdf
4. Response to Submissions
Appendix F - 2003 Cultural Heritage Report.pdf
4. Response to Submissions
Appendix I - Development Consent 2004_1113.pdf
4. Response to Submissions
Appendix J - SEPP 71 Master Plan Approval.pdf
4. Response to Submissions
Appendix L - Urban Design Guidelines.pdf
4. Response to Submissions
Appendix M - Drawings Part 4.pdf
4. Response to Submissions
Appendix M - Drawings Part 8.pdf
Volume 2
Appendix N Noise Assessment.pdf
Concept Plan Illustrations
C3 Indicative Neighbourhood Centre.pdf
Concept Plan Illustrations
C9 Building Heights.pdf
4. Response to Submissions
Conceptual Rehabilitation Plan.pdf
2. Director-General's Requirements
Director General's Requirements Part 1.pdf
Appendix B Ecological Assessment
Ecological Assessment Appendices.pdf
Appendix B Ecological Assessment
Ecological Assessment Report.pdf
Appendix M Bushfire Assessment
Figure 1.1 Bushfire Prone Land.pdf
Appendix B Ecological Assessment
Figure 1.1 Study Area.pdf
Appendix B Ecological Assessment
Figure 1.2 Subject Site.pdf
Appendix M Bushfire Assessment
Figure 3.1 Vegetation Communities.pdf
Appendix B Ecological Assessment
Figure 4.1 Vegetation Communities.pdf
Appendix C Hairy Joint Grass Management Strategy
HJG Management Strategy Report.pdf
4. Response to Submissions
Illustration 2.4 SEPP 71 Master Plan Buffers.pdf
Project Application Illustrations
P2 Stage 1 Subdivision Plan.pdf
Project Application Illustrations
P5 Bulk Earthworks.pdf
Project Application Illustrations
P7 Erosion and Sediment Control Plan.pdf
Project Application Illustrations
P8 Erosion and Sediment Control Details.pdf
Project Application Illustrations
Planting Schedule 1.pdf
Project Application Illustrations
Planting Schedule 2.pdf
Project Application Illustrations
Planting Schedule 3.pdf
Project Application Illustrations
Planting Schedule 6.pdf
Appendix I Project Engineering Report
Section 4 Figure 4.1.pdf
Appendix I Project Engineering Report
Section 4 Figure 4.2.pdf
Appendix I Project Engineering Report
Section 4 Figure 4.6.pdf
Appendix H Concept Plan Engineering Report
Sections 4-8.pdf
Appendix H Concept Plan Engineering Report
Sections 9-10.pdf
Report Illustrations
Site Locality Plan.jpg
Project Details
Consent Authority's ID number
MP07_0026
Address
Pacific Pines Estate (Montwood Drive) Lennox Head
c/o Newton Denny Chappelle
PO Box 1138
2180
,
Lismore
New South Wales
Australia
Type of Application
Part3A
Exhibition Start-End Date
-
Determination Authority
Minister
Decision
Approved
Determination date
Consent Authority
Consent authority name
Minister