MP09_0216 MP09_0216 - Concept Plan - Mixed Use Residential, Commercial/Retail Developement, Meadowbank & Ryde

Ryde

Determination Documents (209)

1. Application and Declaration
10068-1 Political Donations Disclosure Statement 21-12-09.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Additional information_indicative floor plans.pdf
3. Environmental Assessment (EA)
Annexure - 02 - Civil Plans - 146 BOWDEN ST - Part 1.pdf
3. Environmental Assessment (EA)
Annexure - 08 - Part 1 - Visual Impact Assessment.pdf
3. Environmental Assessment (EA)
Annexure - 08 - Part 2 - Visual Impact Assessment.pdf
3. Environmental Assessment (EA)
Annexure - 13 - Landscape report - Part 2.pdf
3. Environmental Assessment (EA)
Annexure - 16 - Stormwater existing cond. - Part 1 - Flooding REPORT.pdf
3. Environmental Assessment (EA)
Annexure - 23 - Arboricultural Impact Assessment.pdf
3. Environmental Assessment (EA)
Annexure - 25 - BCA Statement.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 01_DGRs.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 02_DP&I Issues Letter.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_OPEN SPACE ALLOCATION MAP.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_PEDESTRIAN CYCLEWAYS MAP.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_ROTHESAY AVE ELEVATION.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_STAGE 3 BUILDING ENVELOPES.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_STAGE 4 BUILDING ENVELOPES.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_STAGE 8 BUILDING ENVELOPES.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_VEHICULAR ACCESS AND STREETS PLAN.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 06_agency submissions response.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 06_public submissions response.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 07_MEA Masterplan Compliance.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 10_Landscape Report.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 11_ESD letter.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 15_100yr_Depth_Case1 Updated 4Nov11.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 15_Flooding Assessment 12Dec11.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 20_Stormwater Plans.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 20_Utilities Report.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 21_Access Design Letter.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 22_letter.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 22_Traffic Model Report.pdf
6. Revised PPR_ August 2012
Annexure_20 Stormwater Letter 27Jun12.pdf
6. Revised PPR_ August 2012
Annexure_27 Response to Latest Council and Authorities comments.pdf
6. Revised PPR_ August 2012
Annexure_4 Consultation Outcomes Report and Letter.pdf
6. Revised PPR_ August 2012
Annexure_8 Indicative Concept Plan Storeys Plan.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Concept Plan Preferred Project Report Part 4.pdf
7. Submissions to PPR
Council Submission to PPR_ Issues.pdf
7. Submissions to PPR
Council's Meadowbank Emplyment Area Traffic Needs Assessment Part 1 of 3.pdf
7. Submissions to PPR
Council's Meadowbank Emplyment Area Traffic Needs Assessment Part 2 of 3.pdf
1. Application and Declaration
Declaration_Letter to Proponent.pdf
9a. Post Determination
Letter to Proponent Discharge of Condition B1.pdf
3. Environmental Assessment (EA)
MP09_0216 MP09_0219 EA Part B(2).pdf
4. Submissions to EA
MP09_0216_Scanned Public Submissions no.1-20.pdf
4. Submissions to EA
MP09_0216_Scanned Public Submissions no.171-175.pdf
4. Submissions to EA
MP09_0216_Scanned Public Submissions no.176.pdf
4. Submissions to EA
MP09_0216_Submission No.164 - City of Ryde Council.pdf
4. Submissions to EA
MP09_0216_Submissions No.165-170 - Agencies.pdf
7. Submissions to PPR
NSW Office of Water 27.03.12.pdf
7. Submissions to PPR
Roads and Maritime Services 23.11.12.pdf
7. Submissions to PPR
Sydney Water.pdf
9a. Post Determination
WSUD Report Reissue.pdf
6. Revised PPR_ August 2012
00_Concept Plan PPR REPORT.pdf
1. Application and Declaration
10068-1 Owners Consent and Land Descriptions.pdf
1. Application and Declaration
10068-1 part3a_application_form 21-12-09.pdf
9a. Post Determination
Amended Concept Plans_ Shepherds Bay.pdf
3. Environmental Assessment (EA)
Annexure - 02 - Civil Plans - SHEPHERDS BAY.pdf
3. Environmental Assessment (EA)
Annexure - 02 - Stormwater Concept Plans.pdf
3. Environmental Assessment (EA)
Annexure - 04 - Quantity surveyor's report - Capital Investment Value.pdf
3. Environmental Assessment (EA)
Annexure - 11 - Traffic Report - Part 2.pdf
3. Environmental Assessment (EA)
Annexure - 12 - Report Sun and Ventilation - Part 1.pdf
3. Environmental Assessment (EA)
Annexure - 13 - Landscape report - Part 1.pdf
3. Environmental Assessment (EA)
Annexure - 15 - BASIX Certificates.pdf
3. Environmental Assessment (EA)
Annexure - 17 - Stormwater, Integrated Water Management Plan.pdf
3. Environmental Assessment (EA)
Annexure - 22 - Landuse Survey - Part 1.pdf
3. Environmental Assessment (EA)
Annexure - 27 - Waste Management Plan.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_BELMORE ST ELEVATION.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_BUILDING SETBACKS PLAN.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_STAGE 1 BUILDING ENVELOPES.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_STAGE 10 BUILDING ENVELOPES.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_STAGE 5 BUILDING ENVELOPES.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_STAGE 6 BUILDING ENVELOPES.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_STAGE 7 BUILDING ENVELOPES.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_STAGING PLAN.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 05_CIV Report.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 13_Geotech and Groundwater.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 20_Stormwater letter.pdf
6. Revised PPR_ August 2012
Annexure_1 Director General's Requirements.pdf
6. Revised PPR_ August 2012
Annexure_10 Revised Landscape Report 12.07.27.pdf
6. Revised PPR_ August 2012
Annexure_11 ESD Report.pdf
6. Revised PPR_ August 2012
Annexure_12 Flora and Fauna Assessment.pdf
6. Revised PPR_ August 2012
Annexure_14 Utility Services Supplementary Letter.pdf
6. Revised PPR_ August 2012
Annexure_16 Civil Services - 146 BOWDEN ST - Part 2.pdf
6. Revised PPR_ August 2012
Annexure_17 Contamination.pdf
6. Revised PPR_ August 2012
Annexure_18 Heritage 260612.pdf
6. Revised PPR_ August 2012
Annexure_19 Statements of Commitment 260712.pdf
6. Revised PPR_ August 2012
Annexure_2 Council Submission to PPR_Attachment 1.pdf
6. Revised PPR_ August 2012
Annexure_21 Access Report.pdf
6. Revised PPR_ August 2012
Annexure_22 Additional traffic modelling and TMAP details.pdf
6. Revised PPR_ August 2012
Annexure_24 Additional information request PPR responses 260726.pdf
6. Revised PPR_ August 2012
Annexure_26 Constitution Road redesign plans Option1 With 146 B.pdf
6. Revised PPR_ August 2012
Annexure_26 Constitution Road redesign plans_Sheet (1).pdf
6. Revised PPR_ August 2012
Annexure_7 Summary of MEA Masterplan Compliance.pdf
9. Determination
Concept Approval Instrument.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Concept Plan Preferred Project Report Part 2.pdf
7. Submissions to PPR
Council's Meadowbank Emplyment Area Traffic Needs Assessment Part 3 of 3.pdf
7. Submissions to PPR
Council's submission to revised PPR.pdf
9a. Post Determination
Landscape Report Public Domain Plan Revisiion F.pdf
3. Environmental Assessment (EA)
MP09_0216 MP09_0219 EA Exec Sum and Part A.pdf
3. Environmental Assessment (EA)
MP09_0216 MP09_0219 EA Part B(3).pdf
3. Environmental Assessment (EA)
MP09_0216 MP09_0219 EA Part D and Part E.pdf
3. Environmental Assessment (EA)
MP09_0216 MP09_0219 EA Part F.pdf
4. Submissions to EA
MP09_0216_Public Submissions no.41-60.pdf
4. Submissions to EA
MP09_0216_Scanned Public Submissions no.101-120.pdf
4. Submissions to EA
MP09_0216_Scanned Public Submissions no.141-164.pdf
4. Submissions to EA
MP09_0216_Scanned Public Submissions no.21-40.pdf
4. Submissions to EA
MP09_0216_Scanned Public Submissions no.81-100.pdf
7. Submissions to PPR
Office of Environment & Heritage.pdf
4. Submissions to EA
submission 271 NSW Office of Water .pdf
1. Application and Declaration
10068-1 DoP Covering letter 21-12-09.pdf
1. Application and Declaration
10068-1 Medowbank Prelim EA_18 12 09.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Additional information_indicative envelopes for isolated site.pdf
3. Environmental Assessment (EA)
Annexure - 02 - BASIX - Stamped Plans.pdf
3. Environmental Assessment (EA)
Annexure - 02 - Civil Plans - 146 BOWDEN ST - Part 2.pdf
3. Environmental Assessment (EA)
Annexure - 02 - Stage 1 DA.pdf
3. Environmental Assessment (EA)
Annexure - 06 - Summary of Ryde DCP - G.pdf
3. Environmental Assessment (EA)
Annexure - 07 - Crime Risk Assessment.pdf
3. Environmental Assessment (EA)
Annexure - 08 - Part 3 - Visual Assessment - PhotoMontages.pdf
3. Environmental Assessment (EA)
Annexure - 09 - SEPP 65 Assessment.pdf
3. Environmental Assessment (EA)
Annexure - 11 - Traffic Report - Part 1.pdf
3. Environmental Assessment (EA)
Annexure - 12 - Report Sun and Ventilation - Part 2 - Appendices.pdf
3. Environmental Assessment (EA)
Annexure - 14 - ESD Guidelines Report.pdf
3. Environmental Assessment (EA)
Annexure - 16 - Stormwater existing cond. - Part 3 - Flooding FIGs.pdf
3. Environmental Assessment (EA)
Annexure - 18 - Ecological Report.pdf
3. Environmental Assessment (EA)
Annexure - 19 - Preliminary Geotechnical & Groundwater REPORT - Part 1.pdf
3. Environmental Assessment (EA)
Annexure - 21 - Preliminary Screening Contamination - Report - Part 2.pdf
3. Environmental Assessment (EA)
Annexure - 22 - Landuse Survey - Part 2.pdf
3. Environmental Assessment (EA)
Annexure - 24 - Interpretation Strategy - Part 2.pdf
3. Environmental Assessment (EA)
Annexure - 26 - Accessibility Report.pdf
3. Environmental Assessment (EA)
Annexure - 28 - Acoustic Report.pdf
3. Environmental Assessment (EA)
Annexure - Concept Plan Draft Statement of Commitments 140111.pdf
3. Environmental Assessment (EA)
Annexure - Stage 1 Draft Statement of Commitments 140111.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_HEIGHT PLAN.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_PEDESTRIAN THROUGH SITE LINK PARK.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_PREFERRED PROJECT MASTER PLAN__.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_SIGNIFICANT VIEWS MAP.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_STAGE 2 BUILDING ENVELOPES.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_STAGE 9 BUILDING ENVELOPES.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 04_Consultation Outcomes.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 08_DCP General compliance.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 15_100yr_Depth_Case1A Updated 4Nov11.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 15_Flooding Assessment Figs 1_12.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 18_Heritage letter.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 20_Stormwater Plan.PDF
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 23_Ownership table and consents.pdf
6. Revised PPR_ August 2012
Annexure_16 Civil Services- SHEPHERDS BAY_.pdf
6. Revised PPR_ August 2012
Annexure_2 Council Submission to PPR Cover Letter.pdf
6. Revised PPR_ August 2012
Annexure_2 Department email.pdf
6. Revised PPR_ August 2012
Annexure_2 Department Information Request 220312.pdf
6. Revised PPR_ August 2012
Annexure_3 Revised Concept Plan.pdf
6. Revised PPR_ August 2012
Annexure_5 CIV Report 020712.pdf
6. Revised PPR_ August 2012
Annexure_6 Summary Public Authority Submissions.pdf
6. Revised PPR_ August 2012
Annexure_9 SEPP 65 Assessment & Design Verification of Concept Plan.pdf
8. Recommendation to the Planning Assessment Commission
Appendix E_ Independent Traffic Assessment.pdf
8. Recommendation to the Planning Assessment Commission
Appendix F_ Independent Stormwater Flood Assessment.pdf
8. Recommendation to the Planning Assessment Commission
Appendix G_ Recommended Concept Plan Approval.pdf
8. Recommendation to the Planning Assessment Commission
Appendix G_ Recommended Stage 1 Project Approval.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Concept Plan Preferred Project Report Part 1.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Concept Plan Preferred Project Report Part 3.pdf
7. Submissions to PPR
Council Submission to PPR_ Attachment 1.pdf
8. Recommendation to the Planning Assessment Commission
Director General's Assessment Report.pdf
1. Application and Declaration
DoP 3-11-09.pdf
3. Environmental Assessment (EA)
MP09_0216 MP09_0219 EA Part B(0).pdf
3. Environmental Assessment (EA)
MP09_0216 MP09_0219 EA Part B(1).pdf
3. Environmental Assessment (EA)
MP09_0216 MP09_0219 EA Part B(4).pdf
3. Environmental Assessment (EA)
MP09_0216 MP09_0219 EA Part C(2).pdf
4. Submissions to EA
MP09_0216_Scanned Public Submissions no.121-140.pdf
9. Determination
PAC Report.pdf
7. Submissions to PPR
Transport for NSW_ revised PPR.pdf
3. Environmental Assessment (EA)
Annexure - 01 - Director General's Requirements.pdf
3. Environmental Assessment (EA)
Annexure - 02 - Existing Survey Plan.pdf
3. Environmental Assessment (EA)
Annexure - 03 - Consultation Strategy.pdf
3. Environmental Assessment (EA)
Annexure - 05 - Summary of Master plan controls.pdf
3. Environmental Assessment (EA)
Annexure - 10 - Market Assessment.pdf
3. Environmental Assessment (EA)
Annexure - 16 - Stormwater existing cond. - Part 2 - Flooding FIGs.pdf
3. Environmental Assessment (EA)
Annexure - 19 - Preliminary Geotechnical & Groundwater REPORT - Part 2.pdf
3. Environmental Assessment (EA)
Annexure - 19 - Preliminary Geotechnical & Groundwater REPORT - Part 3.pdf
3. Environmental Assessment (EA)
Annexure - 20 - Utilities Report.pdf
3. Environmental Assessment (EA)
Annexure - 21 - Preliminary Screening Contamination - Report - Part 1.pdf
3. Environmental Assessment (EA)
Annexure - 24 - Interpretation Strategy - Part 1.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 02_Council response letter.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_FACADE MATERIALS AND COLOURS.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 03_LAND OWNERSHIP PLAN.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 09_SEPP 65 Compliance.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 12_Additional species impact report.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 15_ Flooding Assessment.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 15_Flooding Assessment Figs 13_28.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 16_Civil Services.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 17_Contamination letter.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Annexure 19_Draft Statement of Commitments.pdf
6. Revised PPR_ August 2012
Annexure_13 Supplementary Geotechnical and Groundwater Letter.pdf
6. Revised PPR_ August 2012
Annexure_15 Revised Flood Modelling .pdf
6. Revised PPR_ August 2012
Annexure_16 Civil Services - 146 BOWDEN ST - Part 1.pdf
6. Revised PPR_ August 2012
Annexure_2 Council Submission to PPR Issues.pdf
6. Revised PPR_ August 2012
Annexure_2 Department key issues.pdf
6. Revised PPR_ August 2012
Annexure_23 Ownerships and proof of consents to lo 21 06 12.pdf
6. Revised PPR_ August 2012
Annexure_25 Community Facility and Open place study.pdf
6. Revised PPR_ August 2012
Annexure_26 Constitution Road redesign plans Option1 Long Section.pdf
6. Revised PPR_ August 2012
Annexure_26 Constitution Road redesign plans_Sheet (2) (1).pdf
6. Revised PPR_ August 2012
Annexure_26 Constitution Road redesign plans_Sheet (3) (1).pdf
6. Revised PPR_ August 2012
Annexure_6 Summary community submissions.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Concept Plan Preferred Project Report Part 5.pdf
5. Response to Submissions _ Preferred Project Report (PPR)
Concept Plan Preferred Project Report Part 6 .pdf
7. Submissions to PPR
Council Submission to PPR_ Cover Letter.pdf
1. Application and Declaration
Declaration_Opinion.pdf
2. Director-General's Requirements
DGRs issued 20.05.10 - Letter to Proponent.pdf
2. Director-General's Requirements
DGRs issued 20.05.10.pdf
3. Environmental Assessment (EA)
MP09_0216 MP09_0219 EA Part C(1).pdf
3. Environmental Assessment (EA)
MP09_0216 MP09_0219 EA Part G, H and ConcEA Part G, Part H and Conclusion.pdf
4. Submissions to EA
MP09_0216_Scanned Public Submissions no.61-80.pdf
7. Submissions to PPR
Transport for NSW and Roads and Maritime Services.pdf

Project Details

Consent Authority's ID number
MP09_0216
Address
Meadowbank Employment Area Bowden, Belmore, Church & Waterview Streets; Nancarrow & Rothesay Avenues; Constitution Road and Hamilton Crescent West, Well Street, The Loop Road 2114 & 2112 , Meadowbank/Ryde New South Wales Australia
Type of Application
Part3A
Exhibition Start-End Date
-
Determination Authority
PAC
Decision
Approved
Determination date

Consent Authority

Consent authority name
PAC