Part 5 Activities
Realignment of St George Fire Trail (AKA Murray Street Fire Trail), Vincentia
Shoalhaven
The proposed activity is the realignment of an approximate 80 metre section of St George Fire Trail, Vincentia from private land Lot 1 DP 1301691 to within an undeveloped Council road reserve.The realigned section would be constructed in accordance with the NSW Rural Fire Service’s NSW Fire Trail Standards for Category 1 firefighting appliances, including, but not limited to:
• a minimum trail width of 4 metres
• a cleared corridor of 4 metres vertical clearance and a horizontal clearance of 3 metres from the trafficable surface centreline
• crossfall of no more than 6 degrees
• use of all-weather pavement materials
Works would include vegetation clearing and earthworks to construct the fire trail to this standard and closing of the existing, realigned fire trail through the use of material sourced from the works (vegetation, soil and rocks).
Review of Environmental Factors (REF) (1)
Activity Details
Grey Place Vincentia 2540