Wollongong
Stage 2 - Clearing of debris, channel deepening from culvert to 3rd order stream to 0.5m x 0.5m x 30m (approx.), vegetation clearing consisting of removal of two Homalanthus nutuns (Bleeding Hearts) trees that are showing signs of deer damage, removal of two Willow trees, and pruning of a Elaecarpus reticulatus (Blueberry Ash) to raise canopy to allow for machinery access if required. Weed removal will also take place along the creek and into the 3rd order stream and revegetation works of
reshaped banks with native species (including Lomandra longifolia able to cope with machinery drive over) and additional revegetation of the creek bank on the opposite
side of the confluence of the two streams
Stormwater Line – Open Channel #1093380
Stormwater Line – Wingwall #1131674