Skip to main content

Part 5 Activities

Determined

Paddlecraft Launching Facility

Shoalhaven

The proposed activity would comprise:
• installation of 3000 millimetre (mm) long by 1000mm deep by 600mm wide reinforced concrete strip footing on the Lake’s shore and associated excavation
• four 1000mm by 1500mm stepped fibre reinforced plastic (FRP) treads from the strip footing on the foreshore down into the lake
• ten piles driven into the bed of the lake to refusal or minimum two metre embedment
• installation of subsurface drainage and associated excavation
• placement of revetment underneath the facility comprising minimum 300mm diameter armour stone and geotextile filter.
The overall length of the structure would be 5.5 metres and generally 1.5 metres wide.

Review of Environmental Factors (REF) (1)

The approved project is described in the REF, as modified by any associated decision statement (see supporting documents).
Review of Environmental Factors
Review of Environmental Factors REF - Paddlecraft launching facility - Tabourie Lake - Short Street Lake Tabourie
Date : Tue, 18/04/2023 - 14:58

Activity Details

Reference number
P5-2023-34
Proponent(s)
Shoalhaven City Council
Address
Short Street
Lake Tabourie
Legislation
TISEPP (State Environmental Planning Policy (Transport & Infrastructure) 2021)
Activity Type
Port, wharf or boating facilities
Decision
Approved
Determination date