Pedestrian Bridge - Macarthur Gardens North

Campbelltown

The new pedestrian bridge replaces the existing ramp access over Bow Bowing Creek and retains the connection from the north side of the Macarthur Station concourse. The bridge is required to support Landcom's vision for Macarthur Gardens North to create a connected, walkable community that is close to public transport, shops and educational facilities.

Some of the objectives considered, include:
* A suitably designed and accessible bridge for existing and anticipated future needs of the local community;
* Integration with the station arrival park / plaza;
* Community safety and surveillance features that comply with functional and operational requirements;
* Minimising impacts to the existing environment and during bridge construction.

The bridge will be 3.0m wide (internal) and provide a connection to the new street network, via stairs and a boardwalk within the Station Arrival Park, inclusive of a 1:20 grade that accommodates mobility-impaired users.

Review of Environmental Factors (REF) (1)

The approved project is described in the REF, as modified by any associated decision statement (see supporting documents).
Review of Environmental Factors
GLN 11765 MGN Pedestrian Bridge REF V5-Signed_AW
Date : Thu, 26/03/2026 - 16:15

Plans (1)

Architectural Plans
MGN Macarthur Footbridge Concept Design Arch 240910
Date : Thu, 26/03/2026 - 16:15

Supporting Documents (14)

Biodiversity Assessment Report
LAND17 MACARTHUR GARDENS BAR 18 MARCH 2026
Date : Thu, 26/03/2026 - 16:15
Bushfire report
LAND17INT - Macarthur Gardens - FINAL Bushfire letter v318122025
Date : Thu, 26/03/2026 - 16:15
Cost estimate report
36014 MGN Pedestrian Bridge EDC Estimate Report
Date : Thu, 26/03/2026 - 16:15
Decision Statement
20260319 MGN - Determination Checklist Decision Statement (FINAL)_AW
Date : Thu, 26/03/2026 - 16:15
Flood risk management report
Council Flood comments - MGN Macarthur Footbridge Concept Design 240913
Date : Thu, 26/03/2026 - 16:15
Flood risk management report
109562.013 - MGN Pedestrian Bridge Flood Impact Assessment
Date : Thu, 26/03/2026 - 16:15
Geotechnical report
34255.31.R.001.Rev0
Date : Thu, 26/03/2026 - 16:15
Heritage impact statement
AHIP C0004819 - Macarthur Gardens North - Landcom
Date : Thu, 26/03/2026 - 16:15
Traffic report
SCT_00540_MGN Pedestrian Bridge_REP_Ped Assessment Report_v4.0
Date : Thu, 26/03/2026 - 16:15
Vegetation Management Plan
LAND17_MACARTHUR GARDENS_VMP_UPDATE_SEPT2024
Date : Thu, 26/03/2026 - 16:15
Other
25113 Planning Certificate MGN
Date : Thu, 26/03/2026 - 16:15
Other
240030 Macarthur Gardens North bridge - Schematic [B]
Date : Thu, 26/03/2026 - 16:15
Other
240030 JHA-HV-RPT-01 [Rev B] - Earthing Report
Date : Thu, 26/03/2026 - 16:15
Other
34255.35.R.002.Rev0
Date : Thu, 26/03/2026 - 16:15

Activity Details

Reference number
P5-2026-83
Proponent(s)
Landcom
Address
Goldsmith Avenue
Campbelltown
Legislation
TISEPP (State Environmental Planning Policy (Transport & Infrastructure) 2021)
Activity Type
Parks and other public reserves
Decision
Approved
Determination date