Determined

Section 96(2) for design changes to an approved Performing Arts Centre at an existiing educational establishgment

(Former) Sydney West Joint Regional Planning Panel

The Section 96(2) application has been lodged to modify an approved Performing Arts Centre at an existing educational establishment. The original Development Application was approved by the Sydney West Joint Regional Planning Panel on 3 May 2016. The approved Performing Arts Centre comprises a performance space with a seating capacity for 220 students, along with music rooms, change rooms, amenities and an open landscaped forecourt. Construction work on this development has not commenced.

The proposed modification involves the deletion of a large retaining wall on the southern side of the building that was to support the forecourt slab. The forecourt slab is now proposed to be suspended on columns and reduced in width, with alterations to the existing filled batter. These changes are proposed to reduce the construction costs associated with the large retaining wall. Other modifications proposed include alterations to landscaping and an increase in height of the development by 100mm to improve drainage. There is no change proposed to the capacity of the Performing Arts Centre or the internal layout of the building.

Other (9)

Other
Panel decision.pdf
Other
Approved Landscape Plans.pdf
Other
Approved Plans.pdf
Other
Notice of Determination.pdf
Other
Landscape Plans.pdf
Other
Floor Plans.pdf
Other
Architectural Plans.pdf
Other
Council report.pdf
Other
Locality Plan.pdf

Project Details

DA number
DA/1234/2015/A
Planning panel reference number
PPS-2016SYW143
Capital investment value
$11,700,000
Project Address
Lot 1 Dp 1042630, No. 449C Pennant Hills Road, Pennant Hills
Lodgement date
Referral date
Local government
The Council Of The Shire Of Hornsby
Type of matter
DA
Determination outcome
Approved
Determination Date