The Department of Planning, Housing and Infrastructure (the Department) has finalised the Macquarie Park Stage 1 Rezoning simultaneously with the Macquarie Park TOD Rezoning. Finalising these two stages allows us to bring the Macquarie Park Place Strategy to life faster by accelerating delivery of new homes and creating new pedestrian, road and cycling connections, open spaces, and jobs.
The proposal was available for public feedback from 9 November to 10 December 2023. The feedback received during the exhibition periods for both Stage 1 and Stage 2 was considered in the final rezoning.
Finalisation documents
To view the finalisation documents for both Stage 1 and Stage 2, please visit the Macquarie Park TOD Rezoning Proposal page on the NSW Planning Portal.
Exhibited Draft Documents
Exhibited Draft Documents
- Explanation of Intended Effect
- Urban Design Framework
- Design Guide
- Public Domain Master Plan
- Infrastructure Delivery Plan
- Economic Impact Assessment
- Affordable Housing Contributions Scheme
- HPC Brochure MPIP Infrastructure Contributions
- Detailed Precinct Transport Study
- Sustainability Framework and Climate Adaptation Plan
- Connecting with Country Framework
- Public Art and Culture Study
- Civil, Flooding and Stormwater Study
- Utilities Report
- Preliminary Site Investigation