Proposed amendments to the VLAMP and Mining SEPP


The Environment Protection Authority’s (EPA) has revised its policies for noise and air quality impacts. This has resulted in: changes to air quality assessment criteria for fine particles (PM10) from 30 µg/m3 to 25 µg/m3; the introduction of new regulation of very fine particles (PM2.5) at 25 µg/m3 (24 hour) and 8 µg/m3 (annual); and changes to the noise assessment criteria to slightly modify assessment noise levels (however no changes to cumulative noise levels were made). These changes have triggered a review of the Voluntary Land Acquisition and Mitigation Policy (VLAMP) to ensure the thresholds for the grant of voluntary acquisition and mitigation rights are consistent with the EPA’s policies. These rights may be granted by the consent authority when a State significant resources project is determined. As part of the review, the VLAMP has also been updated to provide clearer and more thorough explanations of policy, including policy related to: negotiated agreements; acquisition and mitigation operational processes; the valuation of land that is to be acquired; and the regulation of impacts on land subject to acquisition rights. As a function of the changes it is proposed to amend the State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) 2007 (the Mining SEPP). It is proposed that, following the completion of the VLAMP review: Clause 12AB of the Mining SEPP will be revised to update the non-discretionary standards with the EPA’s revised policies for air and noise. The non-discretionary standards mean that a consent authority cannot require more onerous air and noise standards than the revised assessment criteria; and Clause 12A of the Mining SEPP will be revised to refer to the revised VLAMP. This clause requires the consent authority to give consideration to the VLAMP before determining an application. The proposed amendments to the VLAMP and Mining SEPP are currently on exhibition until 16 February 2018. You can view the relevant documents below and have your say online.

Attachments (3)

faq proposed changes to vlamp and mining sepp 11 2017.pdf
draft revised voluntary land acquisition mitigation policy 11 2017.pdf
explanation of intended effects mining sepp vlamp proposed changes 11 2017.pdf

Submissions (8)

240661_p108.pdf
242881_VLAMP BPN Submission Jan 2018.pdf
244881_AMRC Submission VLAMP Final Feb 2018.pdf
244978_CA VLAMP sub 15022018.pdf
245029_Voluntary Land Aquisition and Mitigation Policy.pdf
245274_OzEnv VLAMP SEPP Submission 16 Feb 2018.pdf
245466_180216_NSWMC Submission_Draft VLAMP_FINAL.pdf
245547_180216_ Draft VLAMP and Mining SEPP_ EDO NSW submission.pdf

Timeline

  • On Exhibition

    The consultation is open for public comment.

  • Under Consideration

    We'll be reviewing what you told us.

  • Made and Finalised

    The final outcomes of this consultation will be documented here.

Consultation period

From:
To:

More information