State Significant Development
Calala Battery Energy Storage System
Tamworth Regional
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Development of a 300 MW / 600 MWh battery storage system and associated infrastructure including grid connection.
Attachments & Resources
Notice of Exhibition (1)
Request for SEARs (11)
SEARs (1)
EIS (36)
Response to Submissions (16)
Agency Advice (38)
Amendments (11)
Additional Information (2)
Determination (3)
Approved Documents
Management Plans and Strategies (1)
Agreements (2)
Other Documents (3)
Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
There are no enforcements for this project.
Inspections
30/10/2024
Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.
Submissions
Name Withheld
Object
Name Withheld
Message
Despite decades of rolling out wind and solar plants in many countries the CO2 emissions still rise every year. Wind and solar projects, including this proposed stand alone BESS project, just make no difference. This BESS will increase atmospheric CO2 and increase our NEM electricity system costs to me and other end consumers. I object to any project that costs me heaps for no benefit at all. Don't approve this useless project!
Name Withheld
Object
Name Withheld
Message
Save Our Surroundings (SOS)
Object
Save Our Surroundings (SOS)
Message
1. Lack of research into the life-cycle of BESS
2. Resource intensive requirements
3. Involves slavery in mining and production
4. Environmentally damaging
5. Fire starting risks increased
6. Fire-fighting dangers increased
7. Local fire risks considerably increased
8. Expensive
9. Short life-span
10. Variable operation
11. Very little Australian content
12. Increased energy and sovereign risks
13. Roads and road travel are impacted
14. Electricity charging and air-conditioning requirements are high
15. Classed as hazardous goods
16. No certainty at end of the short life of a BESS
17. Increased dependency on intermittent electricity generation
18. Poor viability
19. Increase retail electricity prices.
Please refer to the attachment for details.