Expansion of an existing resource recovery facility to process up to 550,000 tonnes per annum of construction and demolition waste, extend the operating hours and physical works on the site to improve efficiencies.
Attachments & Resources
Notice of Exhibition (1)
Request for SEARs (1)
SEARs (2)
EIS (97)
Response to Submissions (18)
Agency Advice (21)
Additional Information (10)
Determination (3)
Approved Documents
There are no post approval documents available
Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
There are no enforcements for this project.
Note: Only enforcements undertaken by the Department from March 2020 will be shown above.
Submissions
Fire and Rescue NSW
Comment
Fire and Rescue NSW
Message
FRNSW have reviewed the documentation provided and submit the following general comments and recommendations for consideration:
• It is understood that a SEPP 33 assessment has been undertaken as part of the development of the Environmental Impact Statement (EIS) and the site has been deemed non-hazardous or offensive.
• It is recommended that advice and considerations contained within FRNSW’s Fire Safety Guideline – Fire safety in waste facilities be addressed. Advice and recommendations contained within the guideline have been developed to enable FRNSW to adequately manage an incident at such facilities.
• It is recommended that advice and considerations contained within FRNSW’s Fire Safety Guideline – Emergency Vehicle Access be addressed. This is required such that FRNSW are able to safely access all parts of the site where an incident may occur.
• It is recommended that provisions be made for the containment of contaminated fire water run-off based on the worst credible fire scenario for the site. Any system(s) provided is to be automatic in nature and should not rely upon on-site staff or emergency services personnel to access or activate provided systems or valves in the event of fire.
• It is recommended that if the development proposes to incorporate a fire engineered solution (FES), whether a building design having a performance solution in accordance with the National Construction Code (NCC) or other infrastructure where building codes are not applicable, FRNSW should be engaged in the fire engineering brief (FEB) consultation process at the preliminary design phase, post approval of the development application. FRNSW also recommend that clauses E1.10 and E2.3 be addressed where a FES is required.
• It is recommended that a Condition of Consent be included that would require the fire and life safety measures for the development to be reassessed for adequacy in the event that either; significant changes are made to the site configuration, processing capacity is increased from 550,000 tpa, or there are changes to either the accepted waste streams or a significant increase in streams that are combustible in nature.
• It is recommended that the an emergency plan for the waste facility in accordance with AS 3745–2010 Planning for emergencies in facilities be prepared for the development. An external consultant should be engaged to provide specialist advice and services in relation fire safety planning and developing an emergency plan.
If you have any queries regarding the above please contact the Fire Safety Infrastructure Liaison Unit, referencing FRNSW file number BFS20/2709. Please ensure that all correspondence in relation to this matter is submitted electronically to [email protected].
Endeavour Energy
Comment
Endeavour Energy
Message
Attachments
Heritage NSW – HERITAGE COUNCIL OF NSW
Comment
Heritage NSW – HERITAGE COUNCIL OF NSW
Message
Attachments
WaterNSW
Comment
WaterNSW
Message
Crown Lands
Comment
Crown Lands
Message
Upon investigation there is no Crown land directly incorporated into the proposal. Prospect Creek is partially Crown land traversing the area, care should be taken, and any future works should incorporate measures for environmental protection of the creek.