Skip to main content

State Significant Development

Determination

Macquarie University - Arts Precinct

City of Ryde

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Modifications

Determination

Archive

Request for SEARs (7)

SEARS (1)

EIS (55)

Response to Submissions (9)

Determination (3)

Approved Documents

There are no post approval documents available

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

There are no inspections for this project.

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Submissions

Filters
Showing 1 - 7 of 7 submissions
Sydney Water
Comment
Parramatta , New South Wales
Message
Thank you for notifying Sydney Water of the proposed development listed above. We have reviewed the proposal and can provide the following comments for your consideration.
Due to the proximity of the proposed development to Sydney Water assets, we recommend that Council imposing the following conditions of consent:
Building Plan Approval
The approved plans must be submitted to the Sydney Water Tap in™ online service to determine whether the development will affect any Sydney Water sewer or water main, stormwater drains and/or easement, and if further requirements need to be met.
The Sydney Water Tap in™ online self-service replaces our Quick Check Agents as of 30 November 2015.
The Tap in™ service provides 24/7 access to a range of services, including:
* building plan approvals
* connection and disconnection approvals
* diagrams
* trade waste approvals
* pressure information
* water meter installations
* pressure boosting and pump approvals
* changes to an existing service or asset, e.g. relocating or moving an asset.

Sydney Water's Tap in™ online service is available at:
https://www.sydneywater.com.au/SW/plumbing-building-developing/building/sydney-water-tap-in/index.htm
Section 73 Certificate
A Section 73 Compliance Certificate under the Sydney Water Act 1994 must be obtained from Sydney Water.
It is recommended that applicants apply early for the certificate, as there may be water and sewer pipes to be built and this can take some time. This can also impact on other services and building, driveway or landscape design.
Application must be made through an authorised Water Servicing Coordinator. For help either visit www.sydneywater.com.au > Plumbing, building and developing > Developing > Land development or telephone 13 20 92.
If you require any further information, please contact Lulu Huang of Growth Planning and Development on [email protected].

Kind Regards,
Growth Planning & Development Team
Roads and Maritime Services
Comment
Parramatta , New South Wales
Message
see attached
Attachments
NSW Environment Protection Authority
Comment
Parramatta , New South Wales
Message
see attached
Attachments
Transport for NSW
Comment
Mascot , New South Wales
Message
see attached
Attachments
Sydney Trains
Comment
- , New South Wales
Message
see attached
Attachments
Ausgrid
Comment
Sydney , New South Wales
Message
see attached
Attachments
City of Ryde
Comment
North Ryde , New South Wales
Message
see attached
Attachments

Pagination

Project Details

Application Number
SSD-8388
Assessment Type
State Significant Development
Development Type
Educational establishments
Local Government Areas
City of Ryde
Decision
Approved
Determination Date
Decider
ED
Last Modified By
SSD-8388-MOD-1
Last Modified On
27/09/2018

Contact Planner

Name
Rebecca Sommer