Marulan Gas-Fired Power Station 2

Goulburn Mulwaree

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Assessment
  6. Recommendation
  7. Determination

To develop either a peaking 250-350 MW open cycle gas-fired power station (Stage 1) or a intermediate/base load 400-450 MW combined cycle gas-fired power station (Stage 2) or develop the Stage 1 plant with later conversion to the Stage 2 plant.

Consolidated Approval

Consolidated Project Approval

Modifications

Withdrawn

Archive

Application (3)

DGRs (1)

EA (38)

Response to Submissions (11)

Determination (7)

Approved Documents

There are no post approval documents available

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

There are no inspections for this project.

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Project Details

Application Number
MP07_0176
Assessment Type
State Significant Infrastructure
Development Type
Electricity generation - Other
Local Government Areas
Goulburn Mulwaree
Decision
Approved
Determination Date
Decider
Minister
Last Modified By
MP07_0176-Mod-3
Last Modified On
16/10/2024

Contact Planner

Name
Dinuka McKenzie