SSD Modifications
Sutherland Shire
Interact with the stages for their names
Increase footprint of basement level 2 and lower maximum depth of excavation from RL21.9 to RL19.2
Modification Application (2)
Agency Advice (1)
Determination (3)
Consolidated Consent (1)
Contact Planner