State Significant Development
Assessment
Romani Battery Energy Storage System
Edward River
Current Status: More Information Required
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Want to stay updated on this project?
The construction, operation and decommissioning of a battery energy storage system with a capacity of approximately 200MW/800MWh, and ancillary infrastructure.
Attachments & Resources
Notice of Exhibition (1)
Early Consultation (1)
Request for SEARs (1)
SEARs (2)
EIS (21)
Response to Submissions (7)
Agency Advice (33)
Amendments (3)
Additional Information (1)
Submissions
Showing 61 - 68 of 68 submissions
National Rational Energy Network Inc
Object
National Rational Energy Network Inc
Object
Coolah
,
New South Wales
Message
The foreign developer states that this project has the potential to power more than 26,000 homes. Yet there are no details on the following:
*for how long these 26,000 homes will be powered from this battery
*can these homes rely on this BESS to supply them with power or is it dependent on the weather being just right (not too hot, not too cloudy, not too windy, no wind droughts)
*whether any of these 26,000 homes already have their own rooftop solar and possibly their own domestic battery.
*will diesel generators be supplying power to the batteries
*will diesel generators be used to ensure the batteries are always kept cool
*where is the land fill for the obsolete batteries
*what chemicals will leach from the landfill
*at end of life (10 years) will the project have been flipped to another foreign developer who will not be found for the clean up?
Was it AI that gave them the magic number of 26,000 homes?
This project will be a fire risk, a source of contamination to the environment and contribute to the industrialisation of the landscape. Will the energy consumer have cheap reliable power? or is this simply about the project owner being able to game the energy market and profit from government schemes funded by taxpayers?
This is not about saving the environment this project and its associated project will destroy the environment.
*for how long these 26,000 homes will be powered from this battery
*can these homes rely on this BESS to supply them with power or is it dependent on the weather being just right (not too hot, not too cloudy, not too windy, no wind droughts)
*whether any of these 26,000 homes already have their own rooftop solar and possibly their own domestic battery.
*will diesel generators be supplying power to the batteries
*will diesel generators be used to ensure the batteries are always kept cool
*where is the land fill for the obsolete batteries
*what chemicals will leach from the landfill
*at end of life (10 years) will the project have been flipped to another foreign developer who will not be found for the clean up?
Was it AI that gave them the magic number of 26,000 homes?
This project will be a fire risk, a source of contamination to the environment and contribute to the industrialisation of the landscape. Will the energy consumer have cheap reliable power? or is this simply about the project owner being able to game the energy market and profit from government schemes funded by taxpayers?
This is not about saving the environment this project and its associated project will destroy the environment.
Name Withheld
Object
Name Withheld
Object
Swan Hill
,
Victoria
Message
Taxpayers are being unjustly forced to underwrite these horrendous, private megaprojects like Romani BESS - covering subsidies, transmission expansions, and long-term guaranteed payments—while bearing the poisonous environmental liabilities when Romani BESS burns, the company fails or walks away abandoning this toxic disaster for locals to deal with.
Name Withheld
Object
Name Withheld
Object
Swan Hill
,
Victoria
Message
RUIN-A-BULL ENERGY like ROMANI BESS is a disaster with no benefits whatsoever to the Riverina or Australia.
We’re sick to death of this poisonous torture of our lives & livelihoods by crooks & greedy vested interests who prioritise Communist China NOT Australia.
We’re sick to death of this poisonous torture of our lives & livelihoods by crooks & greedy vested interests who prioritise Communist China NOT Australia.
Name Withheld
Object
Name Withheld
Object
Swan Hill
,
Victoria
Message
Romani BESS is an outrageous Swindle - designed to be controlled by our most hostile enemy & sabotage the Grid, to rip off consumers by manipulating the market, pushing out local competitors, inflating electricity prices, and warping generation planning across entire regions.
Name Withheld
Object
Name Withheld
Object
Swan Hill
,
Victoria
Message
Reliance of Romani BESS on overseas engineering, software and remote management systems exposes national infrastructure to geopolitical vulnerabilities, including coercion , withheld components, supply-chain disruptions, oversight gaps and sabotage.
Name Withheld
Object
Name Withheld
Object
MOULAMEIN
,
New South Wales
Message
There are Safety-Mechanism Bypass Concerns
Poorly tested control systems and cybersecurity weaknesses will allow remote disabling or deactivation of protection mechanisms, increasing operational and fire risk when not rigorously safeguarded or when sabotaged.
Poorly tested control systems and cybersecurity weaknesses will allow remote disabling or deactivation of protection mechanisms, increasing operational and fire risk when not rigorously safeguarded or when sabotaged.
Name Withheld
Object
Name Withheld
Object
Tyntynder South
,
Victoria
Message
Toxic components, foams, sealants, and firefighting agents used around industrial BESS projects like Romani will leave residues containing PFAS, PFOS, heavy metals, Hydrofluoric Acid and other persistent chemicals, which violate Australian drinking-water standards and state/territory PFAS controls.
Name Withheld
Object
Name Withheld
Object
LAKE ALBERT
,
New South Wales
Message
Whilst the first job of every Government is to protect its citizens, the NSW Government’s totally fudged - RenewaBULL Electricity Infrastructure Roadmap & Federal ‘Future Made in Australia’ agenda are the antithesis of this as it is NOT based on:
Electrical Engineering Facts
Scientific Rigour
Integrity or
Ethics.
ROMANI BESS will NEVER provide:
Grid Stability
Energy Security or Reliability as RENEWABULL ENERGY DEPENDS ON THE WEATHER, IS NEVER AVAILABLE ON DEMAND, DOESN’T WORK MOST OF THE TIME & DOES NOT PROVIDE VITAL SYNCHRONOUS INERTIA - SO ESSENTIAL TO STABILISE THE GRID.
Neither will it provide:
Food Security
Economic Prosperity
Productivity
Genuine Protection of Biodiversity or National Security
Where is the Reputable, Independent, Expert Electrical Engineering Advice to prove the claims of this plan as the dodgy CSIRO’s widely debunked GENCOST Report is basis of the ROTTEN REGULATOR’S ISP that IS:
•NOT Independent
•Not Fit For Purpose
•An Unmitigated Disaster
•Fatally Compromised
•DEAD & BURIED!
ECONOMIC LICENCE HAS BEEN FORGED
**”The idea that adding more & more renewable energy to the grid pushes power prices down has been comprehensively dismissed”
IT’S ALL PAIN & NO GAIN FOR AUSTRALIA AS ENERGY POVERTY RENEWABULLS ARE THE ASBESTOS OF THE FUTURE!
Where is the Determination of the irreversible TOXIC Contamination - the Public Health & Safety Risks of poisoning our land & Water forever - including Hazardous BESS Chemicals, Bis-FASI PFAS, industrialised Solar’s Heavy Metals, & PFOS, Toxic Bisphenol A & ASBESTOS from Wind SWINDLE FACTORIES?
Reputable, independent DETERMINATION OF RenewaBULL ENERGY POVERTY & RENEWABULLS ARE THE ASBESTOS OF THE FUTURE requires an IMMEDIATE MORATORIUM, REPUTABLE, INDEPENDENT, PEER REVIEWED SCIENTIFIC DETERMINATION & A ROYAL COMMISSION.
Three things are clear about the diabolical NSW Electricity (‘Renewable’) Infrastructure Roadmap :
👉🏻Many landscapes will never be the same;
👉🏻Our life-sustaining soil & water will be contaminated;
👉🏻Electricity will become far more expensive and much less reliable;
👉🏻None of this will alter the climate and
👉🏻Australia’s Electricity Grid will be under the Control of our most Hostile Enemy - the Chinese Communist Party.
As Patricia Adams so aptly states in China's Energy Dream -
“Carbon dioxide reduction only makes sense for those China wishes to harm & supplant."
https://www.thegwpf.org/content/uploads/2021/12/Adams-Chinas-Energy-Dream.pdf
With 46.56% owned controlled ElectraNet/TransGrid’s sabotaging Project Energy Connect & Solar/Wind & Battery components predominantly reliant on unethical Slave Labour supply chain, PFAS Contaminating components from China - that can be remotely disabled & made to overheat & catch Fire🔥- there are NO benefits whatsoever from Samsung C&T’s UNETHICAL, NATIONAL SECURITY SABOTAGING China Reliant BESS Disaster that will be sourced from OUR MOST HOSTILE ENEMY - THE CHINESE COMMUNIST PARTY.
It’s glaringly obvious that:
👉🏻’Renewables’ are a Trojan Horse for Socialism masquerading as Environmentalism”
👉🏻Weather dependent stuff – CANNOT deliver power on demand – but guarantees BLACKOUTS - Economic Misery, Environmental Destruction and Community Disruption.
According to the most credible Electrical Engineering Experts this BESS plan & the fudged NSW RenewaBull Electricity Infrastructure Roadmap - orchestrated by the dodgy Climate Change Authority Chair - who was previously the Coalition’s NSW Energy Minister & Treasurer - along with his fellow carpetbagging Fake Green Gravy Train ideologues ie. his Energy Policy Director & Executive Director Energy Office of Energy and Climate Change - can only be described as SHAMBOLIC POLICY MAKING, DANGEROUS TO GRID OPERATION & TOTALLY MAD!
THIS IS AN INCESTUOUS, FAKE GREEN SWAMP OF PREDATORS & PARASITES - PEDALLING THEIR MARKET MANIPULATING, CCP PRIORITISING, GLOBAL ELECTRIFICATION - ASEAN POWER GRID AGENDA - AGAINST THE BEST INTERESTS OF AUSTRALIA & THE GREATER GOOD.
WHERE IS THE NSW GOVERNMENT'S LEGISLATED POLICY TO POISON THE PEOPLE - by POISONING OUR LIFE SUSTAINING SOIL & WATER WITH TOXIC RenewaBULLs - THE ASBESTOS OF THE FUTURE - because that's exactly what they are doing & they know it!
Where is their LEGISLATED TARGET to DELIBERATELY TURN OUR LIMITED, IRREPLACEABLE AGRICULTURAL LAND INTO TOXIC CONTAMINATED WASTELAND DURING OPERATION from this life threatening, EXTREMELY FIRE HAZARDOUS TOXIC LITHIUM ION ROMANI BATTERY, INDUSTRIALISED SOLAR & WIND SWINDLE FACTORY PURVEYORS OF POISON - INCLUDING PFAS FOREVER CHEMICALS..
The Gov & IPCN know full well that this is the inevitable, irreversible outcome yet all we see is the dodgy Developers conspiring with the Government planners to now add OR ANOTHER LAND-USE as AGREED between the Landowner & Applicant or Regulator & OBJECTING COUNCILS cursed with the BURDEN of these RISKY MORAL HAZARD EXPERIMENTS - where FAILURE IS A DESIGN FEATURE - is NOT A PRACTISE this CRUEL, TORTUROUS, DECEITFUL Government can continue to condone with their stitched-up Approvals.
**’Forever chemicals’ used in Lithium Ion Batteries Threaten Environment, Research Finds | Lithium-ion batteries | The Guardian 14/7/24
https://www.theguardian.com/technology/article/2024/jul/14/forever-chemicals-lithium-ion-batteries-environment
**Safety of Grid Scale Lithium-ion Battery Energy Storage Systems
“The scale of Li-ion BESS energy storage envisioned at “mega scale” energy farms is unprecedented and requires urgent review. The explosion potential and the lack of engineering standards to prevent thermal runaway may put control of “battery fires” beyond the knowledge, experience and capabilities of local Fire and Rescue Services.
BESS present special hazards to fire-fighters….”
https://www.researchgate.net/publication/352158070_Safety_of_Grid_Scale_Lithium-ion_Battery_Energy_Storage_Systems
**Grid Scale Batteries & Fire Risk
https://static1.squarespace.com/static/656f411497ae14084ad8d03a/t/66fd2383b56dbc6906390297/1727865736681/Fannon-Batteries.pdf
**Disaster at Moss Landing: The Risk of Battery Storage - YouTube - 16/1/25
https://www.youtube.com/watch?v=xuTaZFQA18E
**https://wattsupwiththat.com/2025/02/20/massive-green-battery-plant-catches-on-fire-again-weeks-after-major-toxic-blaze/
**https://localnewsmatters.org/2025/02/13/environmental-tests-reveal-elevated-levels-of-toxic-metals-since-moss-landing-battery-fire/
**https://www.sfgate.com/news/bayarea/article/environmental-tests-reveal-battery-metals-around-20163514.php
**https://www.cbsnews.com/sanfrancisco/news/elevated-levels-heavy-metals-elkhorn-slough-lithium-battery-facility-fire/
**Battery recycling plant explodes - twice. (What it means for you.) | Auto Expert John Cadogan - YouTube
https://www.youtube.com/watch?v=0-nzOJ01Fkc
**Lithium-Ion Battery Fire Risks & Extinguisher Limitations
1.CSIRO ActivFire® Advisory Note AN‑004
CSIRO explicitly states it "has not and will not certify … that any fire extinguisher can effectively extinguish a Li‑Ion battery fire."
Verification Services
**”There is a general lack of guidance and provisions in building codes, standards, and legislation in relation to safety to address the potential risks from these emerging technologies. Part of the problem is that we do not yet know enough about their probability of failure, their mechanisms of failure and potential consequences of failure.”
https://www.fire.nsw.gov.au/page.php?id=9402
Electrical Engineering Facts
Scientific Rigour
Integrity or
Ethics.
ROMANI BESS will NEVER provide:
Grid Stability
Energy Security or Reliability as RENEWABULL ENERGY DEPENDS ON THE WEATHER, IS NEVER AVAILABLE ON DEMAND, DOESN’T WORK MOST OF THE TIME & DOES NOT PROVIDE VITAL SYNCHRONOUS INERTIA - SO ESSENTIAL TO STABILISE THE GRID.
Neither will it provide:
Food Security
Economic Prosperity
Productivity
Genuine Protection of Biodiversity or National Security
Where is the Reputable, Independent, Expert Electrical Engineering Advice to prove the claims of this plan as the dodgy CSIRO’s widely debunked GENCOST Report is basis of the ROTTEN REGULATOR’S ISP that IS:
•NOT Independent
•Not Fit For Purpose
•An Unmitigated Disaster
•Fatally Compromised
•DEAD & BURIED!
ECONOMIC LICENCE HAS BEEN FORGED
**”The idea that adding more & more renewable energy to the grid pushes power prices down has been comprehensively dismissed”
IT’S ALL PAIN & NO GAIN FOR AUSTRALIA AS ENERGY POVERTY RENEWABULLS ARE THE ASBESTOS OF THE FUTURE!
Where is the Determination of the irreversible TOXIC Contamination - the Public Health & Safety Risks of poisoning our land & Water forever - including Hazardous BESS Chemicals, Bis-FASI PFAS, industrialised Solar’s Heavy Metals, & PFOS, Toxic Bisphenol A & ASBESTOS from Wind SWINDLE FACTORIES?
Reputable, independent DETERMINATION OF RenewaBULL ENERGY POVERTY & RENEWABULLS ARE THE ASBESTOS OF THE FUTURE requires an IMMEDIATE MORATORIUM, REPUTABLE, INDEPENDENT, PEER REVIEWED SCIENTIFIC DETERMINATION & A ROYAL COMMISSION.
Three things are clear about the diabolical NSW Electricity (‘Renewable’) Infrastructure Roadmap :
👉🏻Many landscapes will never be the same;
👉🏻Our life-sustaining soil & water will be contaminated;
👉🏻Electricity will become far more expensive and much less reliable;
👉🏻None of this will alter the climate and
👉🏻Australia’s Electricity Grid will be under the Control of our most Hostile Enemy - the Chinese Communist Party.
As Patricia Adams so aptly states in China's Energy Dream -
“Carbon dioxide reduction only makes sense for those China wishes to harm & supplant."
https://www.thegwpf.org/content/uploads/2021/12/Adams-Chinas-Energy-Dream.pdf
With 46.56% owned controlled ElectraNet/TransGrid’s sabotaging Project Energy Connect & Solar/Wind & Battery components predominantly reliant on unethical Slave Labour supply chain, PFAS Contaminating components from China - that can be remotely disabled & made to overheat & catch Fire🔥- there are NO benefits whatsoever from Samsung C&T’s UNETHICAL, NATIONAL SECURITY SABOTAGING China Reliant BESS Disaster that will be sourced from OUR MOST HOSTILE ENEMY - THE CHINESE COMMUNIST PARTY.
It’s glaringly obvious that:
👉🏻’Renewables’ are a Trojan Horse for Socialism masquerading as Environmentalism”
👉🏻Weather dependent stuff – CANNOT deliver power on demand – but guarantees BLACKOUTS - Economic Misery, Environmental Destruction and Community Disruption.
According to the most credible Electrical Engineering Experts this BESS plan & the fudged NSW RenewaBull Electricity Infrastructure Roadmap - orchestrated by the dodgy Climate Change Authority Chair - who was previously the Coalition’s NSW Energy Minister & Treasurer - along with his fellow carpetbagging Fake Green Gravy Train ideologues ie. his Energy Policy Director & Executive Director Energy Office of Energy and Climate Change - can only be described as SHAMBOLIC POLICY MAKING, DANGEROUS TO GRID OPERATION & TOTALLY MAD!
THIS IS AN INCESTUOUS, FAKE GREEN SWAMP OF PREDATORS & PARASITES - PEDALLING THEIR MARKET MANIPULATING, CCP PRIORITISING, GLOBAL ELECTRIFICATION - ASEAN POWER GRID AGENDA - AGAINST THE BEST INTERESTS OF AUSTRALIA & THE GREATER GOOD.
WHERE IS THE NSW GOVERNMENT'S LEGISLATED POLICY TO POISON THE PEOPLE - by POISONING OUR LIFE SUSTAINING SOIL & WATER WITH TOXIC RenewaBULLs - THE ASBESTOS OF THE FUTURE - because that's exactly what they are doing & they know it!
Where is their LEGISLATED TARGET to DELIBERATELY TURN OUR LIMITED, IRREPLACEABLE AGRICULTURAL LAND INTO TOXIC CONTAMINATED WASTELAND DURING OPERATION from this life threatening, EXTREMELY FIRE HAZARDOUS TOXIC LITHIUM ION ROMANI BATTERY, INDUSTRIALISED SOLAR & WIND SWINDLE FACTORY PURVEYORS OF POISON - INCLUDING PFAS FOREVER CHEMICALS..
The Gov & IPCN know full well that this is the inevitable, irreversible outcome yet all we see is the dodgy Developers conspiring with the Government planners to now add OR ANOTHER LAND-USE as AGREED between the Landowner & Applicant or Regulator & OBJECTING COUNCILS cursed with the BURDEN of these RISKY MORAL HAZARD EXPERIMENTS - where FAILURE IS A DESIGN FEATURE - is NOT A PRACTISE this CRUEL, TORTUROUS, DECEITFUL Government can continue to condone with their stitched-up Approvals.
**’Forever chemicals’ used in Lithium Ion Batteries Threaten Environment, Research Finds | Lithium-ion batteries | The Guardian 14/7/24
https://www.theguardian.com/technology/article/2024/jul/14/forever-chemicals-lithium-ion-batteries-environment
**Safety of Grid Scale Lithium-ion Battery Energy Storage Systems
“The scale of Li-ion BESS energy storage envisioned at “mega scale” energy farms is unprecedented and requires urgent review. The explosion potential and the lack of engineering standards to prevent thermal runaway may put control of “battery fires” beyond the knowledge, experience and capabilities of local Fire and Rescue Services.
BESS present special hazards to fire-fighters….”
https://www.researchgate.net/publication/352158070_Safety_of_Grid_Scale_Lithium-ion_Battery_Energy_Storage_Systems
**Grid Scale Batteries & Fire Risk
https://static1.squarespace.com/static/656f411497ae14084ad8d03a/t/66fd2383b56dbc6906390297/1727865736681/Fannon-Batteries.pdf
**Disaster at Moss Landing: The Risk of Battery Storage - YouTube - 16/1/25
https://www.youtube.com/watch?v=xuTaZFQA18E
**https://wattsupwiththat.com/2025/02/20/massive-green-battery-plant-catches-on-fire-again-weeks-after-major-toxic-blaze/
**https://localnewsmatters.org/2025/02/13/environmental-tests-reveal-elevated-levels-of-toxic-metals-since-moss-landing-battery-fire/
**https://www.sfgate.com/news/bayarea/article/environmental-tests-reveal-battery-metals-around-20163514.php
**https://www.cbsnews.com/sanfrancisco/news/elevated-levels-heavy-metals-elkhorn-slough-lithium-battery-facility-fire/
**Battery recycling plant explodes - twice. (What it means for you.) | Auto Expert John Cadogan - YouTube
https://www.youtube.com/watch?v=0-nzOJ01Fkc
**Lithium-Ion Battery Fire Risks & Extinguisher Limitations
1.CSIRO ActivFire® Advisory Note AN‑004
CSIRO explicitly states it "has not and will not certify … that any fire extinguisher can effectively extinguish a Li‑Ion battery fire."
Verification Services
**”There is a general lack of guidance and provisions in building codes, standards, and legislation in relation to safety to address the potential risks from these emerging technologies. Part of the problem is that we do not yet know enough about their probability of failure, their mechanisms of failure and potential consequences of failure.”
https://www.fire.nsw.gov.au/page.php?id=9402
Pagination
Project Details
Application Number
SSD-67105475
Assessment Type
State Significant Development
Development Type
Electricity Generation – Other
Local Government Areas
Edward River