State Significant Development
Tomago Battery Energy Storage System
Port Stephens
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Development of a 500 MW / 2000 MWh battery energy storage system and associated infrastructure including grid connection.
Attachments & Resources
Notice of Exhibition (1)
Request for SEARs (1)
SEARs (1)
EIS (11)
Response to Submissions (2)
Agency Advice (37)
Additional Information (9)
Determination (3)
Approved Documents
There are no post approval documents available
Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
There are no enforcements for this project.
Inspections
There are no inspections for this project.
Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.
Submissions
PORT STEPHENS COUNCIL
Support
PORT STEPHENS COUNCIL
Name Withheld
Object
Name Withheld
Message
MY FAMILY & I DO NOT CONSENT TO THIS CONTAMINATING, ECOCIDAL, ENERGY POVERTY SWINDLE that’s part of the FAKE GREEN SOLAR/WIND GRIFT & PONZI SCHEME/SCAM THAT’S CRUELLY TORTURING EVERYDAY AUSTRALIANS WITH GOVERNMENT INFLICTED COST OF LIVING CRISIS!
WE NEED TO TAKE A CHAINSAW TO THE EVIL BUREAUCRACY RESPONSIBLE FOR THIS DELUSIONAL, DESTRUCTIVE, ANTI-AUSTRALIAN AGENDA - OFFERING US THE WORLD & PAYING US WITH TRASH!!
References:
TWO NEW PRECEDENTS HAVE BEEN SET by Oxley Bridge Rd Uranquinty Solar Determination 24th Nov 2022 - NEW MODERN SLAVERY CONDITION & AMENDED STORMWATER MANAGEMENT PLAN (re CONTAMINATION.)
**Professor Ian Plimer's 3 minute presentation regarding Solar Panel Contamination Risks.
PPSSTH-149 - DA22/0122 - 1268 Oxley Bridge Road Uranquinty 2652
https://www.planningportal.nsw.gov.au/planning-panel/electricity-generating-works-solar-farm-8
**Hail Storm Photos & Industrialised Solar Contamination Risk to Our Reliably Productive Food Bowl at Bomen, Wagga Wagga Photo are included via this link also - the Hail Stones & some of the Fractured Solar Panels from the damaging 31st Oct 2020 event that left masses of broken Solar panels in situ for a shocking 10 - 11 months without Due Care - with some panels still remaining fractured & leaching contaminating heavy metals years later!
1. NEW MODERN SLAVERY CONDITION- requiring proof prior to construction that NO Slave Labour supply chain components be used in construction.
**New Condition Inserted C4A - Dealing With Modern Slavery.
Commonwealth Modern Slavery Act 2018
*NSW Local Council Act 1993
428 Annual Report
438 ZE Duty to Ensure Goods & Services Are Not Procured From Modern Slavery.
This applies to all NSW Government Bodies - including Councils - for those who Host, Procure or have a Power Purchase Agreement with Solar/Wind Energy Generation/BESS whose construction has used Modern Slavery Supply Chain Sourced Components
eg. City of Sydney, the Opera House, Kiama, Shoalhaven, Shellharbour Councils & Westpac, etc. have an unethical PPA with Spark Infrastructure’s Xinjiang Jinko Solar based Bomen Solar - unethically Hosted by Wagga City Council.
REROC has an unethical PPA with Iberdrola - with Xinjiang JA Solar based Avonlie Solar - unethically Hosted by Narrandera Shire.
2. AMENDED STORM WATER MANAGEMENT PLAN CONDITION re-CONTAMINATION – QUALIFIED TESTING/REPORTING, CONTAMINATION RESPONSE PROCEDURE, etc.
**Amended Condition C8.
Prior to Commencement of Any Works - Storm Water Management Plan.
On Site & Discharge From the Site.
Testing Points & Regular Water Samples, Suitably Qualified Person.
Written Response Procedures if CONTAMINATION is Found - required PRIOR to CONSTRUCTION.
Availability of Results.
……………………………..
Dr James Cockayne
NSW Anti-slavery Commissioner
M: +61 0455 255 453
[email protected]
Carolyn Kitto ‘Be Slavery Free’
Ph: 0438 040 959
[email protected]
Ramila Chanisheff
Australian Uyghur Tangritagh Women's Association - AUTWA
University of S.A
Ph: 0461 402 531 706
[email protected]
---------------------------------
Slave Labour Supply Chains
Missing Information Thwarts Ethical Sourcing
Murphy and Crawford’s report, Over-Exposed: Uyghur Region Exposure Assessment for Solar Industry Sourcing
**The graphs indicating companies & solar panels connected to Xinjiang are in the following 2 links:-
https://desdemonadespair.net/2021/05/forced-labor-from-chinas-uighur-muslims-behind-global-supply-of-solar-panels.html
**Xinjiang Solar Panels - Uyghur Slave Labour/Concentration Camps/Genocide - 'In Broad Daylight' - Professor Laura Murphy
https://www.shu.ac.uk/-/media/home/research/helena-kennedy-centre/projects/pdfs/evidence-base/in-broad-daylight.pdf
**The Office of the United Nations High Commissioner For Human Rights
https://www.ohchr.org/sites/default/files/documents/countries/2022-08-31/22-08-31-final-assesment.pdf
**Australia ratifies International Forced Labour Protocol | Australian Minister for Foreign Affairs Minister for Women Marise Payne
https://www.foreignminister.gov.au/minister/marise-payne/media-release/australia-ratifies-international-forced-labour-protocol
**Implementation of the Magnitsky Act is another avenue to ensure this shamefully unethical industry is not exploited in Australia.
**BLOOD BATTERIES - THE DARK SIDE OF ELECTRIC VEHICLES - Gravitas Plus YouTube
https://m.youtube.com/watch?v=RFHvq-8np1o
**THE DISTURBING REALITY OF COBALT MINING FOR RECHARGEABLE BATTERIES.
“CLEAN COBALT IS A FICTION – THERE IS NO CLEAN COBALT - IT'S ALL MARKETING!”
People need to get educated so they are agitated about it enough to do something to change this.
https://www.news.com.au/finance/business/mining/harvard-professor-explains-heartwrenching-source-of-electric-vehicle-iphone-batteries/news-story/db881f47c76db89581409c092a740c4c
Joe Rogan exposes sad truth about cobalt used in electric vehicle, iPhone batteries |news.com.au — Australia’s leading news site.
Cobalt is in all iPhones, tablets & crucially EV's - it maximises charge & stability.
Before anyone knew what was happening the Chinese Government & Chinese companies took control of almost all of the big mines in the Congo, with the local population displaced & the Congolese people under duress - digging in subhuman, gut wrenching conditions - using all raw human force - clanking the cobalt out of the ground!
Throughout the whole history of slavery, never has there been more suffering that generated more profit than was linked to more lives of people around the world than what is happening today in the Congo - mining cobalt in appalling, heart wrenching & dangerous conditions.
…………………
**Sediment Run-Off Contaminating Land/Water - Court Case -
“Created, Operated, and Maintained a Nuisance”
Solar farm runoff pollutes property, couple awarded $135 million - CFACT
https://www.cfact.org/2023/06/06/solar-farm-runoff-pollutes-property-couple-awarded-135-million/
By Bonner Cohen, Ph. D. |June 6th, 2023
25th Oct 2023 update …A federal judge has dramatically reduced a jury’s $135 million award to a Georgia couple (https://www.ajc.com/news/couple-awarded-135m-after-solar-project-turns-their-lake-to-mud-hole/BZ6BYXQREJCDROQV6ZASUW5WOI/) whose property was fouled by muddy runoff from a solar project next door down to $5 million, after objections from the plaintiffs in the case.
In an order issued Monday in the Middle District of Georgia, Judge Clay D. Land wrote that the punitive damages awarded to the couple were worth many magnitudes more than the property that was damaged, and therefore were excessive.
**The Starting Step for the Production Of Pure Silicon....SiO2 + C -> Si + CO2 ....IS the Heart of the Solar Panel!
**Every step in the production of Solar PV power systems requires an input of fossil fuels - as the carbon reductants needed for smelting silicon from ore, to provide manufacturing process heat and power, for the intercontinental transport of materials, and for on-site deployment.
https://www.azbackroads.com/around-the-west/rangefire-massive-amounts-of-coal-and-wood-must-be-burned-to-create-solar-panels/
**200 Million Tonnes of Toxic Solar Panels Destined For Landfills Near You
stopthesethings.com
**SARET Research - Fire and Rescue NSW have NO IDEA How to Deal With RISKY RenewaBULL Experiments - YET This TOXIC MORAL HAZARD is Deliberately Forced on us by the Dodgy, Deceitful DPE & Complicit IPCN!
https://www.fire.nsw.gov.au/page.php?id=9402
“There is a general lack of guidance and provisions in building codes, standards, and legislation in relation to safety to address the potential risks from these emerging technologies. Part of the problem is that we do not yet know enough about their probability of failure, their mechanisms of failure and potential consequences of failure.”
**The 'Sunk Cost' Trickery That Makes Renewables Seem Cheaper Than They Are - 23rd July 2023.
https://www.fresheconomicthinking.com/p/the-sunk-cost-trickery-that-makes?utm_medium=web
AIDAN MORRISON
How CSIRO justifies the exclusions: “Sunk Cost”
But wait, this deception is so brazen and transparent…….
All of these tens of billions of dollars of projects are explicitly excluded from the cost of integrating renewables.
**The $10 billion cabal of renewable subsidies killing coal - Alan Moran - 24th July 2023
https://www.regulationeconomics.com/_files/ugd/b6987c_a76d14823d6342a298b70841f99b7f71.pdf
Sally Edwards
Object
Sally Edwards
Message
Attachments
Climate and Energy Realists Queensland
Object
Climate and Energy Realists Queensland
Message
Hunter Environment Lobby Inc
Support
Hunter Environment Lobby Inc
Message
Attachments
A Cairns
Object
A Cairns
Message
Newcastle Power Station (NPS) is proposed for the same parcel of land that the Tomago BESS is planned on.”
Ok. Why will you create a Toxic Environment , Worse than Liddel ? I need you in Jail, my government, Australian, and NSW, and SA, and Bourke Council Harm and Loss Entity to the Food Bowl of Australia I Eat from. I Eat Food, ORGANIC Only, Made in Australia, by the Land, I need, and I Do Need, Free of Chemicals by 2022, NB, 2022. Lockdown didn’t go on long enough to Get People Aware of Corruption in government, world, Australia, a Harm and Loss Entity, supporting The Worst Future So Far, NB So Far, in a Dry Continent, our government are completely Unaware of. Shame on you in my government, I say. Shame on you for Increasing the Toxic Future you have No idea is Toxic, do you ? If you did you would Cease and Desist BESS Immediately, Immediately, Immediately, but you have Not, and Therefore I Demand you Go To Jail, Directly To Jail.
EcoNetwork Port Stephens Inc.
Support
EcoNetwork Port Stephens Inc.
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
The environment will be irreversibly damaged.
The developer will profit.
Industry and consumers will be left with unreliable and unaffordable electricity.
Name Withheld
Object
Name Withheld
Message
Batteries use lead, lithium and cobalt, all of which are hazardous materials. This is of much concern to residents and the community as ordinary fire suppression measures cannot extinguish a Lithium chemical reaction fire. A fire that occurred in the 350MW/450MWh BESS during testing on 30 July 2021 in Geelong, Victoria shows how dangerous it can be for nearby residents. When one of the 13 tonne battery packs caught fire, it burned for three days and resulted in the evacuation of residents because of the toxic fumes generated.
I urge DPE to listen to those most heavily impacted by this project and to consider the cumulative impact on the district by multiple developments. This project should be rejected.
Name Withheld
Object
Name Withheld
Message
Save Our Surroundings (SOS)
Object
Save Our Surroundings (SOS)
Message
1. Lack of research into the life-cycle of BESS
2. Resource intensive requirements
3. Involves slavery in mining and production
4. Environmentally damaging
5. Fire starting risks increased
6. Fire-fighting dangers increased
7. Local fire risks considerably increased
8. Expensive
9. Short life-span
10. Variable operation
11. Very little Australian content
12. Increased energy and sovereign risks
13. Roads and road travel are impacted
14. Electricity charging and air-conditioning requirements are high
15. Classed as hazardous goods
16. No certainty at end of the short life of a BESS
17. Increased dependency on intermittent electricity generation
18. Poor viability
19. Increase retail electricity prices.
Please refer to the attachment for details
Attachments
Name Withheld
Object
Name Withheld
Message
Despite decades of rolling out wind and solar plants in many countries the CO2 emissions still rise every year. Wind and solar projects, including this proposed stand alone BESS project, just make no difference. This BESS will increase atmospheric CO2 and increase our NEM electricity system costs to me and other end consumers. I object to any project that costs me heaps for no benefit at all. Don't approve this useless project!
Name Withheld
Object
Name Withheld
Message
Ian McDonald
Object
Ian McDonald
Message
What is critical to any modern economy is reliable, affordable baseload electricity generated by anthracite (black coal), natural gas and nuclear. Not geopolitacally sensitive and environmentally unfriendly batteries made in factories controlled by the CCP, thus threatening our National Security.