To: NSW Department of Planning, Housing and Infrastructure.
I write to formally object to SSDA-96505456 for the proposed Seniors Living Apartment Development at 19–23 Rosalind Street, Cammeray.
I am an architect currently residing approximately 200 metres from the site. My objection is based on a professional understanding of architecture, urban design and planning principles and statutory guidelines, as well as my direct interest in the local built environment and community.
LACK OF CLARITY AND CONFIDENCE IN THE PROPOSAL
A primary concern is the lack of clarity and consistency within the submitted documentation. Elements of the proposal appear ambiguous or insufficiently resolved, which raises doubts regarding the accuracy of representations and the overall integrity of the design intent. For a development of this scale and significance, a higher level of transparency and precision is expected. These elements are referred to in this document below as well as in other documents objecting to this proposal.
STATUTORY FRAMEWORK
The application is primarily assessed under the State Environmental Planning Policy (Housing for Seniors or People with a Disability) 2004 (Seniors Housing SEPP), with design guidance from the Apartment Design Guide (ADG), and contextual consideration of the North Sydney Council Local Environmental Plan (LEP) and Development Control Plan (DCP).
While the SEPP permits variations to local controls, it does not override the requirement to achieve good design, minimise impacts, and respond to context (SEPP Clause 4 – Aims; Clause 5 – Location and design requirements).
INAPPROPRIATE SCALE AND CHARACTER
NS North Sydney DCP – Section 1.4.7 (Building Height and Scale) Requires development to be compatible with surrounding built form and minimise visual dominance.
NS North Sydney DCP – Section 1.4.8 (Streetscape Character) Requires new buildings to respond to the established character and scale of the street.
The proposed development, at 6 storeys (18.4m) plus a two-level basement, represents an urban scale that is inconsistent with the prevailing suburban character of Cammeray. The surrounding context is overwhelmingly 1–3 storeys, with only limited exceptions.
The proposal introduces excessive visual bulk and height, resulting in a development that is out of character with the established streetscape and broader locality. Although allowed by this SSD, this is inconsistent with architectural and urban design principles and the objectives of the North Sydney Council planning framework, including the LEP and DCP, which seek to ensure new development responds appropriately to its context.
AMENITY IMPACTS
ADG – Part 3F (Visual Privacy)
ADG – Building Separation Table (p. 36) Recommends separation distances up to 12–18m depending on height.
NS North Sydney DCP – Section 1.4.6 (Setbacks) Requires setbacks that maintain amenity and privacy
The development will result in significant adverse amenity impacts, including:
Overshadowing: Loss of sunlight to adjoining properties on both eastern and western sides, particularly during key daylight hours.
Loss of Privacy: Increased overlooking into neighbouring dwellings due to height and building mass.
Visual Dominance: Excessive bulk leading to a sense of enclosure and reduced residential amenity.
The scale of excavation required for a two-level basement will result in prolonged and intensive construction impacts.
These impacts appear inconsistent with the design quality principles outlined in the Apartment Design Guide.
QUESTIONABLE CONTRIBUTION TO HOUSING OUTCOMES
While the proposal is framed as Seniors Living, the unit mix (predominantly large 2- and 3-bedroom apartments) suggests a high-end product that does not meaningfully contribute to housing affordability or diversity.
There is concern that the development may result in lower overall occupancy yield compared to existing or alternative housing forms, thereby undermining broader housing supply objectives. This raises questions about the appropriate application of the provisions under the State Environmental Planning Policy (Housing for Seniors or People with a Disability) 2004.
ENVIRONMENTAL CONCERNS
The proposal indicates removal of existing trees and natural habitat; however, details regarding replacement planting and landscape outcomes are unclear and possibly deceptive.
Given the importance of urban tree canopy and biodiversity, particularly in suburban environments, the lack of detailed and credible landscaping information is a significant concern.
PRECEDENT AND PLANNING INTEGRITY
Approval of a development of this scale and nature risks establishing an undesirable precedent for similar proposals in the area. This is particularly concerning where:
The development departs from established local character and urban typology.
Planning controls and recognised design principles appear to be overridden through inappropriate use of State-level pathways.
The use of the State Significant Development process effectively removes determination from local authority, limiting the role of North Sydney Council and reducing local accountability.
INADEQUATE COMMUNITY CONSULTATION
The consultation process has been insufficient:
The public exhibition period of approximately two weeks is inadequate for a project of this scale and complexity.
There was no meaningful community consultation during the design development phase.
This undermines confidence in the planning process and does not align with best practice for community engagement.
CONSTRUCTION IMPACTS ON A RESIDENTIAL NEIGHBOURHOOD
The scale of construction activity, including excavation for a two-level basement, will have substantial impacts on a quiet, family-oriented suburban neighbourhood. These include:
Prolonged noise and vibration.
Increased heavy vehicle movements.
General disruption to local residents.
CONCLUSION
For an SSDA-scale proposal, the documentation should clearly demonstrate compliance with:
ADG design criteria, DCP controls (or justified variations)'SEPP objectives.
The current submission lacks sufficient clarity and rigour to enable full confidence in the assessment.
In summary, the proposed development is:
Excessive in scale and inconsistent with local character.
Likely to result in significant amenity and environmental impacts.
Questionable in its contribution to genuine housing need.
Lacking in clarity and transparency.
Supported by an inadequate consultation process.
For these reasons, I respectfully request that SSDA-96505456 be refused.
Yours sincerely,
Glen Hartman
I write to formally object to SSDA-96505456 for the proposed Seniors Living Apartment Development at 19–23 Rosalind Street, Cammeray.
I am an architect currently residing approximately 200 metres from the site. My objection is based on a professional understanding of architecture, urban design and planning principles and statutory guidelines, as well as my direct interest in the local built environment and community.
LACK OF CLARITY AND CONFIDENCE IN THE PROPOSAL
A primary concern is the lack of clarity and consistency within the submitted documentation. Elements of the proposal appear ambiguous or insufficiently resolved, which raises doubts regarding the accuracy of representations and the overall integrity of the design intent. For a development of this scale and significance, a higher level of transparency and precision is expected. These elements are referred to in this document below as well as in other documents objecting to this proposal.
STATUTORY FRAMEWORK
The application is primarily assessed under the State Environmental Planning Policy (Housing for Seniors or People with a Disability) 2004 (Seniors Housing SEPP), with design guidance from the Apartment Design Guide (ADG), and contextual consideration of the North Sydney Council Local Environmental Plan (LEP) and Development Control Plan (DCP).
While the SEPP permits variations to local controls, it does not override the requirement to achieve good design, minimise impacts, and respond to context (SEPP Clause 4 – Aims; Clause 5 – Location and design requirements).
INAPPROPRIATE SCALE AND CHARACTER
NS North Sydney DCP – Section 1.4.7 (Building Height and Scale) Requires development to be compatible with surrounding built form and minimise visual dominance.
NS North Sydney DCP – Section 1.4.8 (Streetscape Character) Requires new buildings to respond to the established character and scale of the street.
The proposed development, at 6 storeys (18.4m) plus a two-level basement, represents an urban scale that is inconsistent with the prevailing suburban character of Cammeray. The surrounding context is overwhelmingly 1–3 storeys, with only limited exceptions.
The proposal introduces excessive visual bulk and height, resulting in a development that is out of character with the established streetscape and broader locality. Although allowed by this SSD, this is inconsistent with architectural and urban design principles and the objectives of the North Sydney Council planning framework, including the LEP and DCP, which seek to ensure new development responds appropriately to its context.
AMENITY IMPACTS
ADG – Part 3F (Visual Privacy)
ADG – Building Separation Table (p. 36) Recommends separation distances up to 12–18m depending on height.
NS North Sydney DCP – Section 1.4.6 (Setbacks) Requires setbacks that maintain amenity and privacy
The development will result in significant adverse amenity impacts, including:
Overshadowing: Loss of sunlight to adjoining properties on both eastern and western sides, particularly during key daylight hours.
Loss of Privacy: Increased overlooking into neighbouring dwellings due to height and building mass.
Visual Dominance: Excessive bulk leading to a sense of enclosure and reduced residential amenity.
The scale of excavation required for a two-level basement will result in prolonged and intensive construction impacts.
These impacts appear inconsistent with the design quality principles outlined in the Apartment Design Guide.
QUESTIONABLE CONTRIBUTION TO HOUSING OUTCOMES
While the proposal is framed as Seniors Living, the unit mix (predominantly large 2- and 3-bedroom apartments) suggests a high-end product that does not meaningfully contribute to housing affordability or diversity.
There is concern that the development may result in lower overall occupancy yield compared to existing or alternative housing forms, thereby undermining broader housing supply objectives. This raises questions about the appropriate application of the provisions under the State Environmental Planning Policy (Housing for Seniors or People with a Disability) 2004.
ENVIRONMENTAL CONCERNS
The proposal indicates removal of existing trees and natural habitat; however, details regarding replacement planting and landscape outcomes are unclear and possibly deceptive.
Given the importance of urban tree canopy and biodiversity, particularly in suburban environments, the lack of detailed and credible landscaping information is a significant concern.
PRECEDENT AND PLANNING INTEGRITY
Approval of a development of this scale and nature risks establishing an undesirable precedent for similar proposals in the area. This is particularly concerning where:
The development departs from established local character and urban typology.
Planning controls and recognised design principles appear to be overridden through inappropriate use of State-level pathways.
The use of the State Significant Development process effectively removes determination from local authority, limiting the role of North Sydney Council and reducing local accountability.
INADEQUATE COMMUNITY CONSULTATION
The consultation process has been insufficient:
The public exhibition period of approximately two weeks is inadequate for a project of this scale and complexity.
There was no meaningful community consultation during the design development phase.
This undermines confidence in the planning process and does not align with best practice for community engagement.
CONSTRUCTION IMPACTS ON A RESIDENTIAL NEIGHBOURHOOD
The scale of construction activity, including excavation for a two-level basement, will have substantial impacts on a quiet, family-oriented suburban neighbourhood. These include:
Prolonged noise and vibration.
Increased heavy vehicle movements.
General disruption to local residents.
CONCLUSION
For an SSDA-scale proposal, the documentation should clearly demonstrate compliance with:
ADG design criteria, DCP controls (or justified variations)'SEPP objectives.
The current submission lacks sufficient clarity and rigour to enable full confidence in the assessment.
In summary, the proposed development is:
Excessive in scale and inconsistent with local character.
Likely to result in significant amenity and environmental impacts.
Questionable in its contribution to genuine housing need.
Lacking in clarity and transparency.
Supported by an inadequate consultation process.
For these reasons, I respectfully request that SSDA-96505456 be refused.
Yours sincerely,
Glen Hartman
Name Withheld
Object
Name Withheld
Object
Cammeray
,
New South Wales
Message
1 April 2026
Objection regarding the proposed Seniors Living Housing Development in Cammeray -
19-23 Rosalind Street, Cammeray: SSD-96505456
I object to the current proposal for the following reasons:
- Loss of affordable housing by replacing the existing 54 affordable residential flats for all age groups with fewer larger upmarket apartments for seniors which is contrary to the current housing crisis in particular for affordable housing.
- The current proposed development has an adverse impact on the local community and neighbours who currently live near or next to the proposed development resulting in lack of natural light due to the imposing height of 5 and 6 storey tower buildings and lack of privacy due to proximity to boundaries. There is no genuine consideration by this proposed development of the impact the development will have on the neighbours bounding the property. There is also the risk of structural damage to the adjoining properties due to the excavation required to build the proposed development and the closeness of the development to boundaries.
- The proposed development is out of character with our suburb and is cumbersome and imposing. Rosalind Street is a quiet suburban street in Cammeray - not a main thoroughfare where you would expect to see such a building of this proposed imposition and size. The immediate surrounding buildings are residential dwellings either single storey or double storey height and apartment blocks no higher than 4 storeys.
- Rosalind Street is a walking track for school children in the local area attending the local schools ie Cammeray Public School and ANZAC Public School. Such proposed development will have an impact on the safety of these children given multiple heavy vehicles required for the build.
- Loss of trees - our suburb of Cammeray has already been impacted hugely by the loss of hundreds of trees resulting from the Warringah Freeway Upgrade and Western Harbour Tunnel projects which once completed will have a detrimental impact on the air quality in the surrounding suburbs including Cammeray. The current buildings at 19-23 Rosalind Street are well spaced out and set amongst a varying range or trees in height and foliage which are well established and provide a safe habitat for the local fauna, greenery, shade and are aesthetically pleasing. The removal of these trees to be replaced by multi tower buildings and limited surrounding space due to overdevelopment is unacceptable and should not be allowed.
- Bypasses local council guidelines and controls on the pretext of being a seniors living development.
- The proposed development if approved sets a precedent for further similar developments within this residential suburb which are out of keeping with the existing tone of the suburb.
Please consider very carefully the approval of the current proposed development based on the above concerns. I do not believe this is a genuine development designed for seniors living and any such development if approved will have a detrimental impact on our close knit local community.
Objection regarding the proposed Seniors Living Housing Development in Cammeray -
19-23 Rosalind Street, Cammeray: SSD-96505456
I object to the current proposal for the following reasons:
- Loss of affordable housing by replacing the existing 54 affordable residential flats for all age groups with fewer larger upmarket apartments for seniors which is contrary to the current housing crisis in particular for affordable housing.
- The current proposed development has an adverse impact on the local community and neighbours who currently live near or next to the proposed development resulting in lack of natural light due to the imposing height of 5 and 6 storey tower buildings and lack of privacy due to proximity to boundaries. There is no genuine consideration by this proposed development of the impact the development will have on the neighbours bounding the property. There is also the risk of structural damage to the adjoining properties due to the excavation required to build the proposed development and the closeness of the development to boundaries.
- The proposed development is out of character with our suburb and is cumbersome and imposing. Rosalind Street is a quiet suburban street in Cammeray - not a main thoroughfare where you would expect to see such a building of this proposed imposition and size. The immediate surrounding buildings are residential dwellings either single storey or double storey height and apartment blocks no higher than 4 storeys.
- Rosalind Street is a walking track for school children in the local area attending the local schools ie Cammeray Public School and ANZAC Public School. Such proposed development will have an impact on the safety of these children given multiple heavy vehicles required for the build.
- Loss of trees - our suburb of Cammeray has already been impacted hugely by the loss of hundreds of trees resulting from the Warringah Freeway Upgrade and Western Harbour Tunnel projects which once completed will have a detrimental impact on the air quality in the surrounding suburbs including Cammeray. The current buildings at 19-23 Rosalind Street are well spaced out and set amongst a varying range or trees in height and foliage which are well established and provide a safe habitat for the local fauna, greenery, shade and are aesthetically pleasing. The removal of these trees to be replaced by multi tower buildings and limited surrounding space due to overdevelopment is unacceptable and should not be allowed.
- Bypasses local council guidelines and controls on the pretext of being a seniors living development.
- The proposed development if approved sets a precedent for further similar developments within this residential suburb which are out of keeping with the existing tone of the suburb.
Please consider very carefully the approval of the current proposed development based on the above concerns. I do not believe this is a genuine development designed for seniors living and any such development if approved will have a detrimental impact on our close knit local community.
Name Withheld
Object
Name Withheld
Object
Cammeray
,
New South Wales
Message
To whom it may concern,
I wish to lodge my objection to the Cammeray Seniors Living proposed development.
I am a local resident and I am concerned that this proposal is an overdevelopment of the site and is wholly inconsistent with the intent of the Housing SEPP and good planning outcomes for Cammeray.
My concerns include but are not limited to the following;
1. Inconsistent with the intent of seniors housing policy.
The Housing SEPP is intended to support appropriate housing for seniors and vulnerable people. The proposal does not reflect that purpose and indeed seems to prioritise development yield and greed over the environment, the neighbourhood compatability, good design and genuine community benefit.
2. Excessive scale and overdevelopment
The proposal appears far too large for the site in terms of bulk, height, floor space and excavation. It does not appear to represent a modest or compatible seniors housing outcome. Instead, it appears to be an overdevelopment that will dominate the site and surrounding area.
3. Deep soil and landscaping concerns
I am concerned that the proposal does not genuinely provide the landscape and deep soil outcomes suggested in the documentation. Areas shown as “landscaped” may not satisfy the proper definition of landscaped area if they are compromised by structures, hard surfaces or unsuitable conditions for meaningful planting and long-term tree growth.
The definition of landscaped area is:
“landscaped area means a part of a site used for growing plants, grasses and trees, but does not include any building, structure or hard paved area.”
On the material available, I question whether the claimed landscaped area actually meets that definition.
4. Tree loss, vegetation removal and habitat impacts
I am deeply concerned about the extent of tree removal and vegetation loss proposed. The removal of established trees will significantly reduce canopy, landscape character, habitat value and visual amenity. This is especially troubling in an area where mature trees contribute strongly to local character and environmental quality.
5. Non-Compliance with the Housing SEPP
I am deeply concerned that the proposal does not comply with key development standards in the Housing SEPP, including matters such as height, floor space ratio, landscaped area, deep soil and operational requirements.
I am also concerned that no proper Clause 4.6 variation appears to have been submitted for some of these non-compliances, despite the extent of the apparent departures from the standards.
6. Ambulance and emergency vehicle servicing concerns
For a development of this nature, proper access, servicing and ambulance and emergency vehicle arrangements are critical. I am not satisfied that these matters have been resolved in a clear, transparent and policy-compliant way, particularly given the importance of safe and practical access for older residents and emergency services.
7 Loss of character and amenity
The proposal will adversely affect the surrounding area through excessive bulk, visual dominance, excavation impacts, loss of greenery and likely impacts on privacy, outlook and neighbourhood character. Cammeray is valued for its established residential and landscape character, and this proposal does not sit comfortably within that context.
8. Questions around whether the EIS and supporting documents properly address the real impacts
In my opinion I don't believe that the documentation fully and transparently addresses the true impacts of the proposal, including the practical consequences of the site coverage, excavation, tree removal, landscaping limitations and planning non-compliances.
To conclude, I very strongly object to this poroposed development and request that it be declined.
As an absolute minimum, I ask that the Department require the applicant to properly address all non-compliances, clarify the true extent of the development impacts, and demonstrate full compliance with the relevant planning controls before any determination is made.
Thank you.
I wish to lodge my objection to the Cammeray Seniors Living proposed development.
I am a local resident and I am concerned that this proposal is an overdevelopment of the site and is wholly inconsistent with the intent of the Housing SEPP and good planning outcomes for Cammeray.
My concerns include but are not limited to the following;
1. Inconsistent with the intent of seniors housing policy.
The Housing SEPP is intended to support appropriate housing for seniors and vulnerable people. The proposal does not reflect that purpose and indeed seems to prioritise development yield and greed over the environment, the neighbourhood compatability, good design and genuine community benefit.
2. Excessive scale and overdevelopment
The proposal appears far too large for the site in terms of bulk, height, floor space and excavation. It does not appear to represent a modest or compatible seniors housing outcome. Instead, it appears to be an overdevelopment that will dominate the site and surrounding area.
3. Deep soil and landscaping concerns
I am concerned that the proposal does not genuinely provide the landscape and deep soil outcomes suggested in the documentation. Areas shown as “landscaped” may not satisfy the proper definition of landscaped area if they are compromised by structures, hard surfaces or unsuitable conditions for meaningful planting and long-term tree growth.
The definition of landscaped area is:
“landscaped area means a part of a site used for growing plants, grasses and trees, but does not include any building, structure or hard paved area.”
On the material available, I question whether the claimed landscaped area actually meets that definition.
4. Tree loss, vegetation removal and habitat impacts
I am deeply concerned about the extent of tree removal and vegetation loss proposed. The removal of established trees will significantly reduce canopy, landscape character, habitat value and visual amenity. This is especially troubling in an area where mature trees contribute strongly to local character and environmental quality.
5. Non-Compliance with the Housing SEPP
I am deeply concerned that the proposal does not comply with key development standards in the Housing SEPP, including matters such as height, floor space ratio, landscaped area, deep soil and operational requirements.
I am also concerned that no proper Clause 4.6 variation appears to have been submitted for some of these non-compliances, despite the extent of the apparent departures from the standards.
6. Ambulance and emergency vehicle servicing concerns
For a development of this nature, proper access, servicing and ambulance and emergency vehicle arrangements are critical. I am not satisfied that these matters have been resolved in a clear, transparent and policy-compliant way, particularly given the importance of safe and practical access for older residents and emergency services.
7 Loss of character and amenity
The proposal will adversely affect the surrounding area through excessive bulk, visual dominance, excavation impacts, loss of greenery and likely impacts on privacy, outlook and neighbourhood character. Cammeray is valued for its established residential and landscape character, and this proposal does not sit comfortably within that context.
8. Questions around whether the EIS and supporting documents properly address the real impacts
In my opinion I don't believe that the documentation fully and transparently addresses the true impacts of the proposal, including the practical consequences of the site coverage, excavation, tree removal, landscaping limitations and planning non-compliances.
To conclude, I very strongly object to this poroposed development and request that it be declined.
As an absolute minimum, I ask that the Department require the applicant to properly address all non-compliances, clarify the true extent of the development impacts, and demonstrate full compliance with the relevant planning controls before any determination is made.
Thank you.
Tobias Crittenden
Object
Tobias Crittenden
Object
Cammeray
,
New South Wales
Message
I am writing as the owner of Unit 3, 29A Rosalind Street, which is directly adjacent to the southern and eastern boundaries of the proposed development site. While I support appropriate and well-considered development within the area, I cannot support this application in its current form, as it represents a significant overdevelopment of a constrained site and fails to meet a number of key non-discretionary planning standards.
My objections are outlined as follows:
1. Excessive Building Height and Inadequate Clause 4.6 Justification
The proposal seeks a maximum building height of 18.36 metres, representing approximately a 55% exceedance of the 12-metre limit prescribed under the North Sydney Local Environmental Plan 2013. The applicant’s Clause 4.6 variation indicates that non-compliant elements comprise approximately 68% of the total roof footprint. This extent of variation cannot reasonably be characterised as minor or limited to lift overruns; rather, it effectively introduces an additional storey across the majority of the building.
The claimed 3.8-metre height bonus under the “Seniors Housing Bonus” provisions appears questionable. The proposal includes only two residential care beds for a development comprising 49 large apartments, reportedly located in the basement. This raises concerns as to whether the inclusion of these beds is merely tokenistic, potentially intended to trigger planning pathways not otherwise available. Furthermore, the proposed apartment sizes (ranging from approximately 105m² for two-bedroom units to 160m² for three-bedroom units) are substantially larger than typical seniors housing offerings, which generally range between 20m² and 40m².
2. Visual Bulk, Scale, and Topographical Impact
The site rises toward my rear boundary, and my property is situated at a lower level. As a result, an 18.36-metre building constructed directly adjacent to my courtyard will present an overbearing and dominant visual presence. This impact is exacerbated by the site’s topography, making the building appear even taller and more oppressive than if it were positioned closer to street level. In this context, it would be more appropriate for building height to reduce toward the rear boundary, thereby respecting the natural landform and the amenity of adjoining properties.
3. Loss of Solar Access
The Environmental Impact Statement confirms that my property will experience a reduction in solar access exceeding 20%. This outcome fails to maintain the minimum requirement of two hours of direct sunlight at the winter solstice, as prescribed by the Apartment Design Guide and the Housing SEPP. This represents a clear non-compliance with established planning controls.
4. Inadequate Setbacks and Privacy Impacts
Building B proposes side setbacks as narrow as 3 metres. For a development of approximately six storeys, typical building separation distances would be in the order of 9 to 12 metres. The proposed “privacy fins” are not a sufficient mitigation measure for such limited setbacks. The development will result in unreasonable overlooking into my courtyard and main bedroom, leading to a significant loss of privacy for my property.
5. Excavation, Noise, and Acoustic Impacts
The proposal requires the excavation and removal of approximately 24,739m² of sandstone to a depth of 10 metres. The predicted acoustic impact of this excavation is approximately 75 dB(A) at my property, exceeding acceptable management levels by 25 dB(A). This level of noise will have a substantial adverse impact on occupants, particularly those working from home and children engaged in study.
6. Structural and Vibration Risks
Given the proximity of Building B’s basement excavation to my courtyard and foundations, there is a significant risk of vibration-related impacts. I am concerned about the potential for structural damage to my property as a result of these works.
7. Ongoing Noise, Air Quality, and Amenity Impacts
Due to the minimal setbacks, my property will be exposed to ongoing noise impacts from Building B, including noise transmission from open windows, mechanical plant (such as air conditioning units), basement car park operations (including security gates), and communal open spaces between Buildings A and B. Additionally, the location of garbage storage areas will introduce further disturbance during waste collection. Vehicle emissions from the underground car park are also likely to affect air quality, raising potential health concerns for residents.
8. Cumulative Impacts and Inappropriate Design Response
The cumulative effect of the proposal’s variations—including excessive height, inadequate setbacks, loss of solar access, privacy intrusion, and noise and vibration impacts—demonstrates that the design is not an appropriate or reasonable response to the site’s constraints. Nor does it provide a balanced outcome for the surrounding community. Development of this nature should not come at the expense of the safety, amenity, and reasonable expectations of existing residents.
Conclusion
In light of the above concerns, I respectfully request that the Department refuse the application in its current form. I further request that the applicant be required to submit a revised proposal that complies with the applicable height controls (including the 15.8-metre height plane) and provides appropriate setbacks to protect the privacy, solar access, and amenity of my property and neighbouring properties at 29A Rosalind Street.
My objections are outlined as follows:
1. Excessive Building Height and Inadequate Clause 4.6 Justification
The proposal seeks a maximum building height of 18.36 metres, representing approximately a 55% exceedance of the 12-metre limit prescribed under the North Sydney Local Environmental Plan 2013. The applicant’s Clause 4.6 variation indicates that non-compliant elements comprise approximately 68% of the total roof footprint. This extent of variation cannot reasonably be characterised as minor or limited to lift overruns; rather, it effectively introduces an additional storey across the majority of the building.
The claimed 3.8-metre height bonus under the “Seniors Housing Bonus” provisions appears questionable. The proposal includes only two residential care beds for a development comprising 49 large apartments, reportedly located in the basement. This raises concerns as to whether the inclusion of these beds is merely tokenistic, potentially intended to trigger planning pathways not otherwise available. Furthermore, the proposed apartment sizes (ranging from approximately 105m² for two-bedroom units to 160m² for three-bedroom units) are substantially larger than typical seniors housing offerings, which generally range between 20m² and 40m².
2. Visual Bulk, Scale, and Topographical Impact
The site rises toward my rear boundary, and my property is situated at a lower level. As a result, an 18.36-metre building constructed directly adjacent to my courtyard will present an overbearing and dominant visual presence. This impact is exacerbated by the site’s topography, making the building appear even taller and more oppressive than if it were positioned closer to street level. In this context, it would be more appropriate for building height to reduce toward the rear boundary, thereby respecting the natural landform and the amenity of adjoining properties.
3. Loss of Solar Access
The Environmental Impact Statement confirms that my property will experience a reduction in solar access exceeding 20%. This outcome fails to maintain the minimum requirement of two hours of direct sunlight at the winter solstice, as prescribed by the Apartment Design Guide and the Housing SEPP. This represents a clear non-compliance with established planning controls.
4. Inadequate Setbacks and Privacy Impacts
Building B proposes side setbacks as narrow as 3 metres. For a development of approximately six storeys, typical building separation distances would be in the order of 9 to 12 metres. The proposed “privacy fins” are not a sufficient mitigation measure for such limited setbacks. The development will result in unreasonable overlooking into my courtyard and main bedroom, leading to a significant loss of privacy for my property.
5. Excavation, Noise, and Acoustic Impacts
The proposal requires the excavation and removal of approximately 24,739m² of sandstone to a depth of 10 metres. The predicted acoustic impact of this excavation is approximately 75 dB(A) at my property, exceeding acceptable management levels by 25 dB(A). This level of noise will have a substantial adverse impact on occupants, particularly those working from home and children engaged in study.
6. Structural and Vibration Risks
Given the proximity of Building B’s basement excavation to my courtyard and foundations, there is a significant risk of vibration-related impacts. I am concerned about the potential for structural damage to my property as a result of these works.
7. Ongoing Noise, Air Quality, and Amenity Impacts
Due to the minimal setbacks, my property will be exposed to ongoing noise impacts from Building B, including noise transmission from open windows, mechanical plant (such as air conditioning units), basement car park operations (including security gates), and communal open spaces between Buildings A and B. Additionally, the location of garbage storage areas will introduce further disturbance during waste collection. Vehicle emissions from the underground car park are also likely to affect air quality, raising potential health concerns for residents.
8. Cumulative Impacts and Inappropriate Design Response
The cumulative effect of the proposal’s variations—including excessive height, inadequate setbacks, loss of solar access, privacy intrusion, and noise and vibration impacts—demonstrates that the design is not an appropriate or reasonable response to the site’s constraints. Nor does it provide a balanced outcome for the surrounding community. Development of this nature should not come at the expense of the safety, amenity, and reasonable expectations of existing residents.
Conclusion
In light of the above concerns, I respectfully request that the Department refuse the application in its current form. I further request that the applicant be required to submit a revised proposal that complies with the applicable height controls (including the 15.8-metre height plane) and provides appropriate setbacks to protect the privacy, solar access, and amenity of my property and neighbouring properties at 29A Rosalind Street.
Peter Gooden
Object
Peter Gooden
Object
NORTH SYDNEY
,
New South Wales
Message
This is an objection to the Cammeray Seniors Living proposal for 19, 21, 23 Rosalind Street, Cammeray, SSD-96505456.
I am a resident of North Sydney and have lived here for ten years. I know the area very well.
Cammeray is not in the TOD or LMHR zones, yet the developers are seeking to impose two huge buildings, one of which is six to eight storeys high in this zone. It is totally inappropriate, as the nearest major transport hub is the Crows Nest Metro, which is 1.2 kilometers away.
It is fairly obvious that this is not designed as a care facility for seniors, with forty-nine of the units comprising three to four bedroom units and only two care beds, both located underground. Clearly, this is an attempt to get around the planning laws established by the state government to encourage senior strategic development to address the housing shortfall. This is a cynical attempt to present the development as a care facility for seniors, but in actual fact it is an upscale apartment development for rich downsizers.
The main objections I have are:
- The proposed development is just too big for the site and the area.
- The sheer bulk of the two towers, up to eight storeys high, is completely out of character with the quiet neighborhood of Cammeray.
- The surrounding area is very much a low-scale residential area.
- The development has non-compliant setbacks, which severely impact the neighbors.
- The depth of the excavation proposed is down to ten meters, which will have a negative impact on surrounding homes and could destabilize them. This is a real concern.
- The proposal calls for the removal of most of the established trees on the site, which is a massive blow to the neighborhood. We've already lost three thousand plus trees in the Warringah freeway, and the impact on birds, insects, wildlife, and animals is huge. Cammeray is a very leafy area.
- The driveway that services the development is completely inadequate for its purposes, as it will impact severely on the main route that young children take traveling from Crows Nest to Anzac Park Primary School.
- There is no access for large delivery trucks and other service vehicles. The occupants of 89 parking spaces plus service vehicles attending to this development will place an unsustainable load on Rosalind Street and be a danger to the school children that use this street every day.
- The development will definitely create overshadowing, loss of sunlight, and loss of privacy for many neighbors, particularly those to the rear of the higher second block and also the Federation Homes adjoining the site on Rosalind Street.
- The inclusion of the two care beds is clearly a farce and a mere tool to create the impression that they're complying with the SSD system.
I urge the DPHI to not accept these plans as they are put and make various amendments to the proposed development, including:
- Retention of trees
- Increased setbacks
- Reduced overshadowing
- Reduced height of the second building
- Increased number of care bed facilities to something genuine, at least around forty percent of the project
If the developer is not able to adjust the plans to meet these requirements, then the proposal should be rejected by DPHI.
Peter Gooden
North Sydney
1st April 2026
I am a resident of North Sydney and have lived here for ten years. I know the area very well.
Cammeray is not in the TOD or LMHR zones, yet the developers are seeking to impose two huge buildings, one of which is six to eight storeys high in this zone. It is totally inappropriate, as the nearest major transport hub is the Crows Nest Metro, which is 1.2 kilometers away.
It is fairly obvious that this is not designed as a care facility for seniors, with forty-nine of the units comprising three to four bedroom units and only two care beds, both located underground. Clearly, this is an attempt to get around the planning laws established by the state government to encourage senior strategic development to address the housing shortfall. This is a cynical attempt to present the development as a care facility for seniors, but in actual fact it is an upscale apartment development for rich downsizers.
The main objections I have are:
- The proposed development is just too big for the site and the area.
- The sheer bulk of the two towers, up to eight storeys high, is completely out of character with the quiet neighborhood of Cammeray.
- The surrounding area is very much a low-scale residential area.
- The development has non-compliant setbacks, which severely impact the neighbors.
- The depth of the excavation proposed is down to ten meters, which will have a negative impact on surrounding homes and could destabilize them. This is a real concern.
- The proposal calls for the removal of most of the established trees on the site, which is a massive blow to the neighborhood. We've already lost three thousand plus trees in the Warringah freeway, and the impact on birds, insects, wildlife, and animals is huge. Cammeray is a very leafy area.
- The driveway that services the development is completely inadequate for its purposes, as it will impact severely on the main route that young children take traveling from Crows Nest to Anzac Park Primary School.
- There is no access for large delivery trucks and other service vehicles. The occupants of 89 parking spaces plus service vehicles attending to this development will place an unsustainable load on Rosalind Street and be a danger to the school children that use this street every day.
- The development will definitely create overshadowing, loss of sunlight, and loss of privacy for many neighbors, particularly those to the rear of the higher second block and also the Federation Homes adjoining the site on Rosalind Street.
- The inclusion of the two care beds is clearly a farce and a mere tool to create the impression that they're complying with the SSD system.
I urge the DPHI to not accept these plans as they are put and make various amendments to the proposed development, including:
- Retention of trees
- Increased setbacks
- Reduced overshadowing
- Reduced height of the second building
- Increased number of care bed facilities to something genuine, at least around forty percent of the project
If the developer is not able to adjust the plans to meet these requirements, then the proposal should be rejected by DPHI.
Peter Gooden
North Sydney
1st April 2026
Andrew Taylor
Object
Andrew Taylor
Object
Burraneer
,
New South Wales
Message
To Whom It May Concern,
I write to formally object to the proposed development at 19–23 Rosalind Street, Cammeray (SSD-96505456). I am deeply concerned that the proposal, in its current form, represents an overdevelopment of the site and fails to adequately respond to its environmental context, established character, and the amenity of surrounding properties.
My objections are outlined below:
1. Excessive and Unnecessary Removal of Healthy Trees
The proposal involves the removal of a substantial number of mature, healthy trees that contribute significantly to the local canopy, biodiversity, and streetscape character. These trees provide important ecological and amenity benefits, including urban cooling, habitat provision, and visual screening between properties.
There appears to be insufficient justification for the extent of tree removal proposed, particularly where design alternatives could reasonably allow for retention. The loss of established vegetation is inconsistent with broader environmental objectives and will result in irreversible degradation of the local landscape character.
The proposed extent of tree removal is not only environmentally detrimental but also indicative of a design that fails to properly respond to key requirements under the NSW planning framework, including the Apartment Design Guide (ADG) and relevant local environmental planning controls.
a. Failure to Prioritise Tree Retention (ADG & State Policy Context)
The ADG clearly establishes that development should be designed to retain existing significant trees wherever possible, with site planning and building footprints responsive to natural features rather than displacing them.
Specifically, the ADG (Part 4 – Landscape Design) emphasises:
Retention of mature trees as a priority design driver
Integration of development with existing site vegetation
Minimisation of site disturbance
The current proposal appears to invert this principle—removing established trees to accommodate building massing—demonstrating a clear departure from best practice design intent.
This approach is also inconsistent with the objectives of the State Environmental Planning Policy (Housing) 2021, which promotes high-quality, sustainable residential development that responds to environmental context.
b. Non-Compliance with ADG Deep Soil Zone Requirements
A critical issue underpinning the extent of tree removal is the apparent inadequacy of deep soil provision.
Under the ADG (Part 4D – Deep Soil Zones), developments are required to provide sufficient deep soil areas to:
Support retention of existing trees
Enable planting of large canopy trees
Maintain long-term ecological function
For a development of this scale, the ADG typically requires:
A minimum percentage of the site as deep soil (commonly 7–10%+ depending on site size and context)
Deep soil zones of sufficient dimension and continuity to sustain mature vegetation
The proposed 3-metre setbacks severely constrain the ability to deliver meaningful deep soil zones, particularly along site boundaries where existing trees are most likely located. Narrow setbacks fragmented by basements, services, and hardstand areas do not function as true deep soil zones and cannot support large canopy growth.
As a result:
Existing trees are unable to be retained
Replacement planting will be limited to small or medium species
Long-term canopy outcomes are compromised
This represents a functional non-compliance with ADG objectives, even if numerical targets are nominally claimed.
c. Inconsistency with Local Environmental Planning Controls (North Sydney LEP/DCP)
The proposal is also inconsistent with the intent of the North Sydney Local Environmental Plan 2013 and North Sydney Development Control Plan 2013, which place strong emphasis on:
Preservation of landscape character
Protection of significant trees and vegetation
Provision of adequate landscaped area and deep soil zones
The DCP in particular requires:
Development to be designed around existing vegetation
Retention of trees that contribute to the streetscape and local amenity
Landscaping that achieves visual softening of built form
By proposing widespread removal of healthy trees and limiting opportunities for meaningful replacement, the development fails to satisfy these objectives.
d. Relationship Between Building Mass, Setbacks, and Tree Loss
The excessive building mass and minimal setbacks are directly linked to the extent of vegetation removal.
A more compliant and context-sensitive scheme would:
Increase setbacks to allow tree retention corridors
Reduce basement and building footprint encroachment into root zones
Provide contiguous deep soil areas capable of sustaining canopy trees
Instead, the current design maximises yield at the expense of landscape outcomes, resulting in a clear conflict between built form and environmental constraints.
e. Cumulative Strategic Impact – Undermining Urban Canopy Targets
The NSW Government has established clear strategic objectives to increase urban tree canopy cover across Greater Sydney, recognising its importance for:
Urban heat mitigation
Climate resilience
Biodiversity
Public health
The unnecessary removal of mature trees on this site—particularly in a suburb already experiencing cumulative canopy loss—directly undermines these objectives.
Given the long maturation period required for replacement trees (often decades), the proposal results in a net long-term loss of canopy, contrary to both state and local planning priorities.
Conclusion
In summary, the extent of tree removal is not an unavoidable consequence of site constraints, but rather the result of a design that fails to properly accommodate the environmental characteristics of the site. This represents a fundamental misalignment with the ADG, local planning controls, and broader strategic objectives for urban canopy preservation.
2. Excessive Building Mass and Scale
The overall bulk and scale of the development are excessive for the site and out of character with the surrounding built form. The proposal presents as visually dominant and fails to provide appropriate transitions to adjoining lower-scale residential properties.
This overbearing massing will result in adverse visual impacts, overshadowing, and a sense of enclosure for neighbouring dwellings, particularly those located to the south and east.
3. Inadequate Boundary Setbacks (3 Metres)
The proposed 3-metre setbacks are insufficient given the scale and height of the development. These minimal setbacks exacerbate the perception of bulk and reduce opportunities for landscaping, deep soil zones, and meaningful canopy retention.
In addition, the limited setbacks contribute to privacy impacts, overlooking, and reduced solar access to adjoining properties. Greater setbacks are necessary to achieve an appropriate interface with neighbouring residential lots and to mitigate the development’s impacts.
4. Non-Compliance with Apartment Design Guide (ADG)
The proposal includes multiple significant variations from the Apartment Design Guide (ADG), which collectively undermine the design quality and liveability outcomes expected of such developments.
These variations appear excessive and unjustified, rather than minor or site-constrained exceptions. The cumulative effect of these departures raises serious concerns about compliance with established planning principles and the precedent this may set.
5. Impacts on Neighbouring Properties (South and East)
The development will have pronounced adverse impacts on properties to the south and east, including:
Loss of privacy due to overlooking from upper levels
Increased overshadowing and reduced solar access
Visual dominance and reduced outlook
Noise and general amenity impacts associated with increased density
These impacts have not been adequately mitigated through design measures and represent an unreasonable imposition on neighbouring residents.
In respect to our property located on the Southern boundary at 6 Trafalgar St Crows Nest, from the arborists report, trees T40 and T41, both natives in excess of 12m in height and set well back from the proposed development site have been classified as having a sparse canopy and of being 'low value'. Please see attached photo of the two trees from the Southern side showing that the canopy is not sparse, and they are of significant value to our neighbouring property to create screening and privacy from future development.
6. Lack of Contextual Sensitivity
The proposal does not sufficiently respond to the established character of the area. Its scale, massing, and site coverage appear driven by maximising yield rather than achieving a balanced and context-sensitive design outcome.
A more considered approach is required—one that respects the site’s environmental attributes, retains significant vegetation, and provides appropriate transitions to surrounding development.
Conclusion
For the reasons outlined above, I strongly object to the proposal in its current form. I respectfully request that the consent authority either refuse the application or require substantial redesign to:
Retain a significantly greater proportion of existing healthy trees
Reduce building bulk and scale
Increase setbacks to improve amenity and landscape outcomes
Achieve genuine compliance with the Apartment Design Guide
Better protect the amenity of neighbouring properties
Thank you for considering this submission.
Yours sincerely,
Andrew Taylor
I write to formally object to the proposed development at 19–23 Rosalind Street, Cammeray (SSD-96505456). I am deeply concerned that the proposal, in its current form, represents an overdevelopment of the site and fails to adequately respond to its environmental context, established character, and the amenity of surrounding properties.
My objections are outlined below:
1. Excessive and Unnecessary Removal of Healthy Trees
The proposal involves the removal of a substantial number of mature, healthy trees that contribute significantly to the local canopy, biodiversity, and streetscape character. These trees provide important ecological and amenity benefits, including urban cooling, habitat provision, and visual screening between properties.
There appears to be insufficient justification for the extent of tree removal proposed, particularly where design alternatives could reasonably allow for retention. The loss of established vegetation is inconsistent with broader environmental objectives and will result in irreversible degradation of the local landscape character.
The proposed extent of tree removal is not only environmentally detrimental but also indicative of a design that fails to properly respond to key requirements under the NSW planning framework, including the Apartment Design Guide (ADG) and relevant local environmental planning controls.
a. Failure to Prioritise Tree Retention (ADG & State Policy Context)
The ADG clearly establishes that development should be designed to retain existing significant trees wherever possible, with site planning and building footprints responsive to natural features rather than displacing them.
Specifically, the ADG (Part 4 – Landscape Design) emphasises:
Retention of mature trees as a priority design driver
Integration of development with existing site vegetation
Minimisation of site disturbance
The current proposal appears to invert this principle—removing established trees to accommodate building massing—demonstrating a clear departure from best practice design intent.
This approach is also inconsistent with the objectives of the State Environmental Planning Policy (Housing) 2021, which promotes high-quality, sustainable residential development that responds to environmental context.
b. Non-Compliance with ADG Deep Soil Zone Requirements
A critical issue underpinning the extent of tree removal is the apparent inadequacy of deep soil provision.
Under the ADG (Part 4D – Deep Soil Zones), developments are required to provide sufficient deep soil areas to:
Support retention of existing trees
Enable planting of large canopy trees
Maintain long-term ecological function
For a development of this scale, the ADG typically requires:
A minimum percentage of the site as deep soil (commonly 7–10%+ depending on site size and context)
Deep soil zones of sufficient dimension and continuity to sustain mature vegetation
The proposed 3-metre setbacks severely constrain the ability to deliver meaningful deep soil zones, particularly along site boundaries where existing trees are most likely located. Narrow setbacks fragmented by basements, services, and hardstand areas do not function as true deep soil zones and cannot support large canopy growth.
As a result:
Existing trees are unable to be retained
Replacement planting will be limited to small or medium species
Long-term canopy outcomes are compromised
This represents a functional non-compliance with ADG objectives, even if numerical targets are nominally claimed.
c. Inconsistency with Local Environmental Planning Controls (North Sydney LEP/DCP)
The proposal is also inconsistent with the intent of the North Sydney Local Environmental Plan 2013 and North Sydney Development Control Plan 2013, which place strong emphasis on:
Preservation of landscape character
Protection of significant trees and vegetation
Provision of adequate landscaped area and deep soil zones
The DCP in particular requires:
Development to be designed around existing vegetation
Retention of trees that contribute to the streetscape and local amenity
Landscaping that achieves visual softening of built form
By proposing widespread removal of healthy trees and limiting opportunities for meaningful replacement, the development fails to satisfy these objectives.
d. Relationship Between Building Mass, Setbacks, and Tree Loss
The excessive building mass and minimal setbacks are directly linked to the extent of vegetation removal.
A more compliant and context-sensitive scheme would:
Increase setbacks to allow tree retention corridors
Reduce basement and building footprint encroachment into root zones
Provide contiguous deep soil areas capable of sustaining canopy trees
Instead, the current design maximises yield at the expense of landscape outcomes, resulting in a clear conflict between built form and environmental constraints.
e. Cumulative Strategic Impact – Undermining Urban Canopy Targets
The NSW Government has established clear strategic objectives to increase urban tree canopy cover across Greater Sydney, recognising its importance for:
Urban heat mitigation
Climate resilience
Biodiversity
Public health
The unnecessary removal of mature trees on this site—particularly in a suburb already experiencing cumulative canopy loss—directly undermines these objectives.
Given the long maturation period required for replacement trees (often decades), the proposal results in a net long-term loss of canopy, contrary to both state and local planning priorities.
Conclusion
In summary, the extent of tree removal is not an unavoidable consequence of site constraints, but rather the result of a design that fails to properly accommodate the environmental characteristics of the site. This represents a fundamental misalignment with the ADG, local planning controls, and broader strategic objectives for urban canopy preservation.
2. Excessive Building Mass and Scale
The overall bulk and scale of the development are excessive for the site and out of character with the surrounding built form. The proposal presents as visually dominant and fails to provide appropriate transitions to adjoining lower-scale residential properties.
This overbearing massing will result in adverse visual impacts, overshadowing, and a sense of enclosure for neighbouring dwellings, particularly those located to the south and east.
3. Inadequate Boundary Setbacks (3 Metres)
The proposed 3-metre setbacks are insufficient given the scale and height of the development. These minimal setbacks exacerbate the perception of bulk and reduce opportunities for landscaping, deep soil zones, and meaningful canopy retention.
In addition, the limited setbacks contribute to privacy impacts, overlooking, and reduced solar access to adjoining properties. Greater setbacks are necessary to achieve an appropriate interface with neighbouring residential lots and to mitigate the development’s impacts.
4. Non-Compliance with Apartment Design Guide (ADG)
The proposal includes multiple significant variations from the Apartment Design Guide (ADG), which collectively undermine the design quality and liveability outcomes expected of such developments.
These variations appear excessive and unjustified, rather than minor or site-constrained exceptions. The cumulative effect of these departures raises serious concerns about compliance with established planning principles and the precedent this may set.
5. Impacts on Neighbouring Properties (South and East)
The development will have pronounced adverse impacts on properties to the south and east, including:
Loss of privacy due to overlooking from upper levels
Increased overshadowing and reduced solar access
Visual dominance and reduced outlook
Noise and general amenity impacts associated with increased density
These impacts have not been adequately mitigated through design measures and represent an unreasonable imposition on neighbouring residents.
In respect to our property located on the Southern boundary at 6 Trafalgar St Crows Nest, from the arborists report, trees T40 and T41, both natives in excess of 12m in height and set well back from the proposed development site have been classified as having a sparse canopy and of being 'low value'. Please see attached photo of the two trees from the Southern side showing that the canopy is not sparse, and they are of significant value to our neighbouring property to create screening and privacy from future development.
6. Lack of Contextual Sensitivity
The proposal does not sufficiently respond to the established character of the area. Its scale, massing, and site coverage appear driven by maximising yield rather than achieving a balanced and context-sensitive design outcome.
A more considered approach is required—one that respects the site’s environmental attributes, retains significant vegetation, and provides appropriate transitions to surrounding development.
Conclusion
For the reasons outlined above, I strongly object to the proposal in its current form. I respectfully request that the consent authority either refuse the application or require substantial redesign to:
Retain a significantly greater proportion of existing healthy trees
Reduce building bulk and scale
Increase setbacks to improve amenity and landscape outcomes
Achieve genuine compliance with the Apartment Design Guide
Better protect the amenity of neighbouring properties
Thank you for considering this submission.
Yours sincerely,
Andrew Taylor
Attachments
Jane Watts
Object
Jane Watts
Object
MOSMAN
,
New South Wales
Message
I object to this application in the strongest terms.
This proposal is not seniors housing. It is a luxury residential development - two eight-storey towers - constructed by stacking every available mechanism under the Seniors Housing SEPP to override the planning controls that would otherwise apply. The 'care' component that unlocks this entire edifice consists of two beds placed in a basement. That is not dignified ageing in place. It is the identification of the minimum regulatory input required to extract the maximum planning bonus.
The consequences are severe and permanent: 54 genuinely affordable one- and two-bedroom apartments demolished and replaced with 48 luxury three- and four-bedroom ILUs that fewer people can afford; a building exceeding local height controls by more than 50% in a suburb with no strategic basis for towers of this scale; 24 established trees removed in a neighbourhood already stripped of more than 3,000 trees by the motorway; and North Sydney Council bypassed entirely.
The project cost submitted to access the SSD pathway was $31 million — one million dollars above the threshold. The EIS now claims $68 million. That figure doubled without explanation. The Panel should not accept that the SSD pathway was validly engaged without requiring the applicant to justify this discrepancy with current, accurate cost information.
The community has been given 14 days to respond to a voluminous and complex EIS. That is not meaningful participation. It is procedural compliance dressed as consultation.
Technical navigation of SEPP bonus mechanisms does not establish public interest. The public interest requires this Panel to look at what is actually being delivered: fewer dwellings, no affordable housing, two care beds in a basement, and a precedent that will be used by developers across every low-density suburb in Sydney. That is not an outcome this Panel should endorse.
This application should be refused.
This proposal is not seniors housing. It is a luxury residential development - two eight-storey towers - constructed by stacking every available mechanism under the Seniors Housing SEPP to override the planning controls that would otherwise apply. The 'care' component that unlocks this entire edifice consists of two beds placed in a basement. That is not dignified ageing in place. It is the identification of the minimum regulatory input required to extract the maximum planning bonus.
The consequences are severe and permanent: 54 genuinely affordable one- and two-bedroom apartments demolished and replaced with 48 luxury three- and four-bedroom ILUs that fewer people can afford; a building exceeding local height controls by more than 50% in a suburb with no strategic basis for towers of this scale; 24 established trees removed in a neighbourhood already stripped of more than 3,000 trees by the motorway; and North Sydney Council bypassed entirely.
The project cost submitted to access the SSD pathway was $31 million — one million dollars above the threshold. The EIS now claims $68 million. That figure doubled without explanation. The Panel should not accept that the SSD pathway was validly engaged without requiring the applicant to justify this discrepancy with current, accurate cost information.
The community has been given 14 days to respond to a voluminous and complex EIS. That is not meaningful participation. It is procedural compliance dressed as consultation.
Technical navigation of SEPP bonus mechanisms does not establish public interest. The public interest requires this Panel to look at what is actually being delivered: fewer dwellings, no affordable housing, two care beds in a basement, and a precedent that will be used by developers across every low-density suburb in Sydney. That is not an outcome this Panel should endorse.
This application should be refused.
Attachments
The Plateau Precinct
Object
The Plateau Precinct
Object
CAMMERAY
,
New South Wales
Message
The Plateau Precinct is a Community based group supported and endorsed by North Sydney Council with other Precincts throughout the LGA to give local residents, workers and students a voice to raise concerns and meet in person to discuss their Community that surrounds their daily lived experience, we are neighbouring this site with our boundary of Miller St Cammeray, with Anzac Park Precinct Cammeray where this development application is located.
We have not found 1 person who supports this application, in fact people have responded with grave concerns due to the location, size, height exceeding local planning by 50% tree loss, current residents amenity - near and throughout Cammeray (that includes 'Seniors), loss of existing affordable housing, congestion issues for vehicles and pedestrians with close proximity to Primary schools (Anzac Park and Cammeray Public) as most children walk to school sometimes without an adult, with multiple long daycare facilities nearby which walking to is a preferred option due to a lack of street parking.
We also see significant errors in the submission, EIS pages 98 &99 refer to local shops such as Location 8 - Friendly Grocer (IGA) with the photo clearly showing a crane on the roof as this location is a construction site for a responsible development of shops - more than 1 (not the Friendly Grocer) and housing again more that 1 which is what was there prior, so we are not anti development bur it must be responsible, fit for the place and not be a Trojan Horse for something it is not!
Seniors housing should be dignified - two care beds in the basement that's not dignified care, zero 1 bedroom units is not catering to Seniors who are often 1 person households, seeking Harbour/ District views has an unmentioned downside of air pollution intake to air conditioning with close proximity to the busiest road in Australia - Warringah Fwy which will also have the currently under construction Western Harbour Tunnel with the Ventilation / unfiltered Pollution outlet in close proximity near Ernest st
Housing types that already exist in Cammeray offer a great number of options for Seniors, low cost housing (45 Amherst St where Plateau Precinct meets is social housing development with a Community meeting room/kitchen) we embrace the life cycle from birth to death in a respectful way with an inclusive attitude, not exclusively for the wealthy with an age restriction blocking any type of resident.
The location is also surrounded by many Community concerns, we have already lost significant numbers of mature trees from Cammeray Park due to the NSW Government WFU/WHT State Significant project which we have live thorough since 2017 on paper and 2021 - 28 in practice with severe trauma to our Community, endless noise, dust, project workers parking out our local streets, day work, night work, severe sleep deprivation road closures, unexpected design changes and ill conceived consultant driven assessments that don't capture our topography, under ground water, history as a Sandstone quarry - hence silca dust issues, the list goes on...
We represent the local community who have not been consulted with in an inclusive and respectful way, this development is not well planned with seeming to try to meet the SSD regardless of the facts to bypass local planning and destroy existing amenities, we are not a TOD area, they are nearby and many unit residences there are vacant, North Syd LGA has high density populations that meet all types of households, this should not be built in it's planned form, we (The Plateau Precinct) OBJECT to having our Community destroyed by such a non compliant housing 'project'.
We have not found 1 person who supports this application, in fact people have responded with grave concerns due to the location, size, height exceeding local planning by 50% tree loss, current residents amenity - near and throughout Cammeray (that includes 'Seniors), loss of existing affordable housing, congestion issues for vehicles and pedestrians with close proximity to Primary schools (Anzac Park and Cammeray Public) as most children walk to school sometimes without an adult, with multiple long daycare facilities nearby which walking to is a preferred option due to a lack of street parking.
We also see significant errors in the submission, EIS pages 98 &99 refer to local shops such as Location 8 - Friendly Grocer (IGA) with the photo clearly showing a crane on the roof as this location is a construction site for a responsible development of shops - more than 1 (not the Friendly Grocer) and housing again more that 1 which is what was there prior, so we are not anti development bur it must be responsible, fit for the place and not be a Trojan Horse for something it is not!
Seniors housing should be dignified - two care beds in the basement that's not dignified care, zero 1 bedroom units is not catering to Seniors who are often 1 person households, seeking Harbour/ District views has an unmentioned downside of air pollution intake to air conditioning with close proximity to the busiest road in Australia - Warringah Fwy which will also have the currently under construction Western Harbour Tunnel with the Ventilation / unfiltered Pollution outlet in close proximity near Ernest st
Housing types that already exist in Cammeray offer a great number of options for Seniors, low cost housing (45 Amherst St where Plateau Precinct meets is social housing development with a Community meeting room/kitchen) we embrace the life cycle from birth to death in a respectful way with an inclusive attitude, not exclusively for the wealthy with an age restriction blocking any type of resident.
The location is also surrounded by many Community concerns, we have already lost significant numbers of mature trees from Cammeray Park due to the NSW Government WFU/WHT State Significant project which we have live thorough since 2017 on paper and 2021 - 28 in practice with severe trauma to our Community, endless noise, dust, project workers parking out our local streets, day work, night work, severe sleep deprivation road closures, unexpected design changes and ill conceived consultant driven assessments that don't capture our topography, under ground water, history as a Sandstone quarry - hence silca dust issues, the list goes on...
We represent the local community who have not been consulted with in an inclusive and respectful way, this development is not well planned with seeming to try to meet the SSD regardless of the facts to bypass local planning and destroy existing amenities, we are not a TOD area, they are nearby and many unit residences there are vacant, North Syd LGA has high density populations that meet all types of households, this should not be built in it's planned form, we (The Plateau Precinct) OBJECT to having our Community destroyed by such a non compliant housing 'project'.