Skip to main content
Name Withheld
Comment
STRATHFIELD , New South Wales
Message
The 2 towers located on top of the podium appear to be modelled as solid, with no articulation or inclusion of corner or inset balconies as is shown on the architectural drawings. In accordance with the AWES QAM-1-2019 guideline the study model should be fabricated to within 2% accuracy of the architectural drawings, which clearly has not been undertaken in this instance. The lack of detail or inclusion of balconies may have a substantial impact on the measured wind tunnel results as presented in the report along the podium and ground planes. The report does not indicate if there will be any safety concerns especially for the corner balconies, which are generally the most susceptible to issues due to corner wind acceleration effects. Given the site receives no immediate shielding from neighbouring buildings this could in fact be a major issue for certain balcony areas, which would need to be mitigated.
The report indicates strong wind conditions (comfort and safety) for a majority of the area within the central podium section with Points 43 equal to the Safety Criteria (23m/s), P44 and 45 equal to 22m/s. Although these areas are deemed to satisfy the safety criteria is the inclusion of vegetation substantial enough to ensure comfort conditions are met for the majority of the year?
The point layout also does not meet the Recommended Assessment area as outlined in AWES which is to investigate up to a distance of half the building height away from the building boundary. This area should cover points further along Loftus Lane as well as across the rail line. I would advise that the towers are remodelled in accordance with architectural drawings and the test undertaken to ensure that the approved architectural design does not cause adverse wind impacts within and around the site.
Steven Broussos
Comment
GREENACRE , New South Wales
Message
This proposal is only good with direct access to Parramatta Road, otherwise, the roads would be too crowded
Bankstown Airport Limited
Comment
BANKSTOWN AERODROME , New South Wales
Message
The heights suggested for the development will not impact Bankstown Airport's Airspace, any cranes utilised to build will most likely intrude into airspace and developers will need to be made aware of the requirements to have cranes assessed.
CASA
Comment
Canberra , Australian Capital Territory
Message
Please refer to attachment
Attachments
Name Withheld
Comment
HOMEBUSH , New South Wales
Message
Dear Department of Planning, Housing and Infrastructure,

I am a resident living near the proposed development site at 17–24 Loftus Crescent, Homebush.

I understand the broader housing objectives and acknowledge that mixed-use development can provide long-term benefits if appropriately managed. However, I have serious concerns about the construction impacts and ongoing neighbourhood impacts given the size of the proposal (including two residential towers up to 27–35 storeys, demolition and basement works, and a concurrent rezoning request).

As a resident living on Level 3 with a balcony facing Loftus Crescent, I expect the most significant impacts to relate to noise, vibration, heavy vehicle movement and parking congestion. I request the Department apply strict conditions to minimise impacts on existing residents and ensure the project can proceed without unacceptable disruption.

1) Construction noise, vibration and disruption (major concern)

The proposal involves demolition, excavation and major construction over a multi-year period. Noise and vibration impacts will be particularly significant for nearby residents on lower levels (including my dwelling).

I request conditions requiring:

strict limits on construction hours including:

clear controls on early morning starts

limits on weekend work

strong restrictions on any out-of-hours works (and clear approval process if needed)

a comprehensive Construction Environmental Management Plan (CEMP) including:

noise monitoring at sensitive residential receivers

vibration monitoring (especially during excavation, piling and concrete works)

clear triggers for action if noise/vibration exceed thresholds

advanced notification to residents for high-impact works (e.g. demolition days, concrete pours, major truck movements)

complaint handling requirements with:

a single point of contact

response time commitments

reporting transparency and corrective actions

2) Dust, air quality and general liveability impacts

Dust and airborne particles from demolition/excavation will significantly affect surrounding residents and balconies, particularly for nearby apartments at lower levels.

I request conditions requiring:

strong dust suppression measures and active monitoring

restrictions during high wind days

ongoing cleaning of surrounding footpaths/roads affected by construction activity

management of airborne emissions during demolition and spoil handling

3) Construction traffic + truck routes (access and safety)

Given the scale of the project, heavy vehicle movements will materially impact local streets and residents’ access.

I request:

a detailed Construction Traffic and Transport Management Plan including:

nominated heavy vehicle routes designed to minimise impacts to residential streets

strict controls to prevent truck queuing, idling, and blocking roads

clear pedestrian safety controls (including around crossings and driveways)

strict timing controls to avoid peak congestion periods where possible

4) Parking congestion and impacts to local residents

This proposal will increase local density significantly and will likely worsen parking pressures both during construction and following occupation.

I request conditions requiring:

a construction workforce parking plan that prevents workers from using local residential street parking

active enforcement measures and signage during the construction period

ongoing traffic/parking assessment for operational impacts, with mitigation requirements if spillover parking impacts become excessive

5) Road capacity, congestion and appropriateness of density increase

The proposed development scale (including the concurrent rezoning for increased building height and floor space ratio) appears excessive given the existing local road network and congestion levels in and around Homebush.

I am concerned the current road and surrounding infrastructure does not appear suitable to accommodate the additional traffic, servicing vehicles, visitors, deliveries and rideshare activity generated by an additional 318 dwellings and associated retail uses.

I request the Department require:

a robust and transparent traffic assessment that reflects realistic peak demand and cumulative impacts

measures to prevent significant worsening of congestion and local access conditions

appropriate mitigation works where impacts are identified

6) Overshadowing and loss of solar access to surrounding buildings

Given the proposed tower heights (up to 27–35 storeys), I am concerned about the potential for unacceptable overshadowing and loss of solar access to surrounding residential buildings and public areas.

I request the Department ensure:

detailed shadow diagrams are provided for key times of year (especially winter)

the design is amended where overshadowing impacts are excessive or unreasonable

building setbacks and massing are adjusted to minimise solar access impacts to existing residents

7) Neighbourhood amenity and street safety

A development of this scale should not reduce the safety or usability of the surrounding public domain during construction.

I request:

safe and clearly separated pedestrian paths during the works

appropriate lighting and safety controls in areas affected by construction hoarding or reduced footpath access

strong management of retail/activation outcomes to ensure amenity is improved without causing nuisance impacts

Closing

In summary, my primary concerns relate to construction noise/vibration, dust, heavy vehicle impacts, parking congestion, and the broader issue of whether the proposed scale is appropriate given existing road capacity and congestion.

I request the Department impose strict, enforceable conditions and (where required) design changes to minimise impacts on neighbouring residents and protect local amenity.

Thank you for considering my submission.
Lilli Barto
Object
HOMEBUSH , New South Wales
Message
I object to the project in it's current form, because I do not think it includes a sufficient amount of affordable housing given the context of the housing crisis. I am one of the tenants that would be displaced for my home to be demolished and developed into flats. I am not against turning these 5 or so houses into apartments, but it is insulting and inadequate that only 12 of 318 residences are to be designated affordable housing. If we are to address the housing crisis, we need to build housing for people not profit. I am sure the developer would still make a worthwhile amount of money from the project even if it were 100% affordable housing, rather than the measly less than 4% that is currently proposed.

If the following two measures were introduced to the plan, I would support the project
1. Minimum 50% of the dwellings to be affordable housing
2. Priority access to that affordable housing given to my neighbors, the people who will be displaced to make way for this development.
Daniel Mendes
Support
Chatswood , New South Wales
Message
I support the project
Name Withheld
Object
HOMEBUSH , New South Wales
Message
1. Overdevelopment and congestion in this part of Strathfield LGA.
As you're aware from Homebush onwards and towards the west, there are many unit vacancies available. Do a search on RealEstate.com.au and you'll see currently there are 33 2-bedroom units below $750K unsold in the suburb of Homebush. We're now adding more units even though existing units fail to sell. The reason they fail to sell is because of over congestion, traffic and no malls etc. We already have another 214 apartments nearby at 21 Parramatta Rd, Homebush which will add to this congestion.

2. The widening of Loftus Lane doesn't help
The widening of Loftus Lane only supports access in inner roads surrounding the project. It doesn't help traffic for nearby residents as there will be a hold up to enter Loftus Lane and Subway Lane from Parramatta Rd, since it's only 2 lanes going in 1 direction and both Loftus Lane (where the project is), and Subway Lane is a one way street.

3. The proposed shop lots will be empty.
Like many of the others shops along Parramatta Road, with lack of street/public free parking, retails outlets will not thrive in this environment. Look at all the retail shop lots along Parramatta road. If they're already not successful, why build more when there won't be any business and will therefore only end up with empty lots or unattractive businesses?

4. Strathfield LGA not doing their part.
Have a look at the inner road condition at Loftus Lane (the whole stretch) and observe the portholes. Look at the uneven road entrances (terrible strip of road condition) to Crane St from Parramatta Rd. The council is not doing anything to address the safety of vehicles. Many blind spots when entering Crane St from Loftus Lane, cars parking on both sides causing only 1 car lane on Crane St when it's supposed to be 2 lanes. This is my only entry from and exit to Parramatta Road. Adding another few hundred units to this part of Homebush doesn't help as the widening of road (not just at Loftus Lane) and parking issues have to be addressed.

5. Use other parts of Strathfield LGA.
Strathfield LGA is big, and there are many big houses occupying lands where nearby there are no apartments. More buyers will be attracted to these areas since they get no traffic congestion and perfect unblocked views from above. We have to spread out the density. There's now like the poor side of Strathfield LGA (huge density like in Homebush) and the rich side nearer to Strathfield station where hardly any units available for sale because of....Strathfield Plaza and it's a major station. Why not have a Homebush Plaza occupying 17-24 Loftus Cr, or even the unused 11-16 Loftus Cr? If the upcoming Metro is at Homebush I have no objection as many will use public transport...but the thing is it's at North Strathfield so you'll need more apartments there, not here. Homebush unlike Strathfield doesn't have that Express train that makes 2-3 stops to Central even though our population is increasing due to oversupply of units in this suburb.

I know targets need to be met to build more homes, but trust me, if this project goes ahead it will be a failed project with many avoidable issues, unless we first start with building a Homebush Plaza (with Coles or Woolies) with multilevel parking. Then whatever apartment you propose/approve to build will be welcomed by residents as it will be a win-win for all. Eg. when undercover parking provided, street parking not required making way for 2 way traffic etc.
Name Withheld
Object
Homebush , New South Wales
Message
35 storeys is a lot of height and will overshadow the surrounding area.
There is a lot of traffic already in the area and getting in and out of Homebush is often difficult. Adding 352 more cars will create havoc and huge traffic problems.
Where are these families going to send their kids to school. The little local school is already full. Homebush station is already crowded adding so many extra people will make getting train almost impossible. I do not object to a smaller block of units being built but there has to be a considered assessment of the problems that any new development will cause.