Name Withheld
Object
Name Withheld
Object
Waterloo
,
New South Wales
Message
Context
This proposal to the NSW Government from DASCO (SSD-95997711)
I am writing to object the proposal to build a 38 storeys building in my neighborhood.
It will have such a significant impact on the infrastructure, much worse traffic, shortage of amnesties, and it will look so overbearing and ugly for a building that tall to be dumped into our neighborhood. Even Ovo building in Greensquare which is properly planned and in alignment with the architecture design there stands at 28 storeys.
This clearly will impact the quality of life for the residents here.
We are already under strain from increased population here.
This should be planned and thought properly in terms of the short and long term impacts. Not just commercial values.
It would be a bad decision and unwise to simply dump around 8000 people in such a short space of time in our neighborhood without proper infrastructure planning.
I hope my input is taken consideration.
This proposal to the NSW Government from DASCO (SSD-95997711)
I am writing to object the proposal to build a 38 storeys building in my neighborhood.
It will have such a significant impact on the infrastructure, much worse traffic, shortage of amnesties, and it will look so overbearing and ugly for a building that tall to be dumped into our neighborhood. Even Ovo building in Greensquare which is properly planned and in alignment with the architecture design there stands at 28 storeys.
This clearly will impact the quality of life for the residents here.
We are already under strain from increased population here.
This should be planned and thought properly in terms of the short and long term impacts. Not just commercial values.
It would be a bad decision and unwise to simply dump around 8000 people in such a short space of time in our neighborhood without proper infrastructure planning.
I hope my input is taken consideration.
Peter van Gastel
Object
Peter van Gastel
Object
Waterloo
,
New South Wales
Message
The reason for my objection to this DA specifically is on the basis of process. There appears to be two parallel processes running simultaneously, neither of which are referring to each other. The chaotic approach to consultations around this site, particularly for a development which has already gone through community consultation, is making it incredibly difficult for residents in the area to understand what exactly is being proposed or to provide their responses in time. I feel that this is a deliberate tactic.
For your reference, I have attached the objection I wrote to Sarah George Consulting for the SSD community consultation to this email, which focuses on the social impact of the proposed changes to this development. Sarah George and the developers organised an information webinar on the 25th of February which was essentially a marketing exercise that lectured locals on why the proposed changes would be a good thing and failed to address every single one of the substantive concerns raised in residents' letters prior to, and in the Teams chat during, the call.
You should be aware that off the back of this, residents in the area are organising and we will do everything we can to keep the Council and the State Government accountable on this development in particular, and on the shambolic SSD pathway being pushed by the HDA/State Government more widely. The media are beginning to pick up on this and our elected officials would do well to remember that there are people living in the areas this is being done to whose genuine concerns about their quality of life are being routinely ignored.
For your reference, I have attached the objection I wrote to Sarah George Consulting for the SSD community consultation to this email, which focuses on the social impact of the proposed changes to this development. Sarah George and the developers organised an information webinar on the 25th of February which was essentially a marketing exercise that lectured locals on why the proposed changes would be a good thing and failed to address every single one of the substantive concerns raised in residents' letters prior to, and in the Teams chat during, the call.
You should be aware that off the back of this, residents in the area are organising and we will do everything we can to keep the Council and the State Government accountable on this development in particular, and on the shambolic SSD pathway being pushed by the HDA/State Government more widely. The media are beginning to pick up on this and our elected officials would do well to remember that there are people living in the areas this is being done to whose genuine concerns about their quality of life are being routinely ignored.
Attachments
Soeren Baker
Object
Soeren Baker
Object
Waterloo
,
New South Wales
Message
I strongly object to this DASCO proposal for the gross overdevelopment at 903-921 Bourke Street, Waterloo, living very close by at 850 Bourke Street as an owner occupier.
This proposal shamelessly rips up the City of Sydney-approved plans, jacking Bourke Street North from 12 to 31 storeys and Young Street from 21 to 38 storeys while cramming in another 233 apartments for a total of 580. It adds just 20 pathetic parking spaces.
Combined with the adjacent 38-storey Coronation tower (SSD-80441462) and the avalanche of other approvals, this dumps the equivalent of a small country town—4,000 extra apartments and up to 8,000 new residents—into an already choking Waterloo-Zetland area.
Local roads, parking and public transport are already at breaking point: the 304 bus routinely skips stops and Green Square trains are standing-room only. Amenities cannot cope—our library is already impossible to use. The twin towers will loom overbearing and completely out of character, casting massive cumulative winter-solstice shadows across homes and open space, while creating dangerous wind-tunnel effects at street level that endanger pedestrians.
This is reckless, unacceptable over-development.
This proposal shamelessly rips up the City of Sydney-approved plans, jacking Bourke Street North from 12 to 31 storeys and Young Street from 21 to 38 storeys while cramming in another 233 apartments for a total of 580. It adds just 20 pathetic parking spaces.
Combined with the adjacent 38-storey Coronation tower (SSD-80441462) and the avalanche of other approvals, this dumps the equivalent of a small country town—4,000 extra apartments and up to 8,000 new residents—into an already choking Waterloo-Zetland area.
Local roads, parking and public transport are already at breaking point: the 304 bus routinely skips stops and Green Square trains are standing-room only. Amenities cannot cope—our library is already impossible to use. The twin towers will loom overbearing and completely out of character, casting massive cumulative winter-solstice shadows across homes and open space, while creating dangerous wind-tunnel effects at street level that endanger pedestrians.
This is reckless, unacceptable over-development.
Name Withheld
Object
Name Withheld
Object
Waterloo
,
New South Wales
Message
This proposed development present a psychosocial and environmental hazard to the health of the current rand future residents in waterloo and on the proposed site. The apartment blocks are hostile towers squashing too many people into too little space. In addition with a rise in global temperatures predicted for sydney (which is already experiencing a significant trend towards hotter and longer summers, with research suggesting that summers have lengthened by roughly 50 days since 1990)! The area needs larger greener spaces to cool it down in summer and provide social space for mental well being and developing community connections.
This site represents a trend towards 'burning infernos' people stacked on top of one another by greedy developers with no thought given to the mental health of the population therein creating urban ghettos. Judging by the plans it is an extremely depersonalised aesthetically deficient proposal. The local libraries are already jammed for space and there is very little green cooling space on this side of Bourke street for such an intense population burden. Look at the trends of larger cities in the world and take note.Think about it and do NOT impose this on existing and proposed residents.
This site represents a trend towards 'burning infernos' people stacked on top of one another by greedy developers with no thought given to the mental health of the population therein creating urban ghettos. Judging by the plans it is an extremely depersonalised aesthetically deficient proposal. The local libraries are already jammed for space and there is very little green cooling space on this side of Bourke street for such an intense population burden. Look at the trends of larger cities in the world and take note.Think about it and do NOT impose this on existing and proposed residents.
Name Withheld
Object
Name Withheld
Object
ZETLAND
,
New South Wales
Message
Dear Decision Makers,
As a Zetland resident for many years, living with my husband and one remaining adult child at home, I’m deeply concerned about the proposed height and density increases at 903-921 Bourke Street.
At 62, I’ve recently received my Gold Opal Senior’s Card. I’ve started to use more public transport - buses and early trains - and I've noticed they’re already crowded, just with existing residents.
Our library, GP medical practice and other local amenities are under strain. This development would worsen that.
We’d also lose much of our beautiful skyline view. While we know we don’t own it, it has been a cherished part of our life, from our rooftop garden space on our apartment lot title.
Additionally, overshadowing and wind tunnels from oversized towers will dominate the neighborhood, dwarfing everything.
I urge you to reject or scale back these changes to preserve our community’s livability and character.
Sincerely,
Ange Ryan
813 17 Joynton Ave
Zetland
As a Zetland resident for many years, living with my husband and one remaining adult child at home, I’m deeply concerned about the proposed height and density increases at 903-921 Bourke Street.
At 62, I’ve recently received my Gold Opal Senior’s Card. I’ve started to use more public transport - buses and early trains - and I've noticed they’re already crowded, just with existing residents.
Our library, GP medical practice and other local amenities are under strain. This development would worsen that.
We’d also lose much of our beautiful skyline view. While we know we don’t own it, it has been a cherished part of our life, from our rooftop garden space on our apartment lot title.
Additionally, overshadowing and wind tunnels from oversized towers will dominate the neighborhood, dwarfing everything.
I urge you to reject or scale back these changes to preserve our community’s livability and character.
Sincerely,
Ange Ryan
813 17 Joynton Ave
Zetland
Ewa Kapera
Object
Ewa Kapera
Object
Waterloo
,
New South Wales
Message
I OBJECT the proposed increase of height of Young st tower from 21 to 38 levels, the increase of height in Bourke st North tower from 12 to 31 levels and the increase of height of the Bourke st South from 7 to 11 levels.
The doubling of the tower heights will create wind tunnel as the "towers in GreenSquare" have created a wind tunnel and will impact my and the neighbourhood enjoyment of the area.
The doubling of the tower heights will create wind tunnel as the "towers in GreenSquare" have created a wind tunnel and will impact my and the neighbourhood enjoyment of the area.
Philip Smith
Object
Philip Smith
Object
WATERLOO
,
New South Wales
Message
I am against the modifications to the development application for 903-921 Bourke Street, Waterloo (SSD-95997711) My three main reasons: infrastructure; excessive height and community misalignment.
I have lived locally for 12 years and seen massive change in the area over that time. I expect change and know that change will happen in the area as it moves from industrial to residential. However, overall past development has been balanced, as well as providing the community with many benefits.
Originally as planned this development was approved with height and density creating a socially responsible balance. It was a dense masterplan development with greenspace and infrastructure support. It no long is.
Infrastructure
This is crucial for the success of any development. It is essential that people can get in and out of a location. Good infrastructure brings visitors into an area to help sustain local businesses. For this development infrastructure is poor.
Transport Networks: The heavy rail network, Green Square and Redfern, are each a good 20-minute walk away. The metro at Waterloo is also a 20-minute walk as is the light rail in another direction. Though, these are all positive a 20-minute walk for most people is too long and therefore not practical for daily commutes and even visitors.
The area, therefore, is only directly served by busses. These are already very well patronised – stretched in peak times. Injecting an additional 580 apartments is going to put additional pressures on this service. Buses will need to be increased to cope with the demand.
Even if busses are significantly increased many people, both residents and visitors will still be dependent on motor vehicles. This should not be the outcome of any development. The area will not cope well more vehicles. It will put additional pressure on street parking, causing inconvenience as well traffic blockage. It is already in high demand. Parking spaces for residents in the proposed buildings have not increased.
Walking will not increase; in fact, it will probably decrease given the increased traffic.
In addition, there are no on street electric vehicle charging hubs, though there are some charging facilities in shopping centre car parks.
The two best local retail precincts in the area East Village Shopping Centre and Surry Hills Shopping Village both offer adequate parking to supplement the local population by drawing visitors from other parts of Sydney. New developments can’t survive without adequate parking. Surry Hills Shopping Village with the strong restaurant mix supports/highlighting this fact.
Retail Infrastructure: This will change over time, but it is challenging especially now. For example Dank Street has morphed, after struggling since COVID, from cafes and restaurants to a design fit out/renovation street dominated by Winnings, plumbing/bathroom suppliers, flooring and garden furniture. Foot traffic has declined dramatically. Food outlets have opened but mostly closed. There are now only 2 food outlets at its peak there were 7 maybe 8!
A walk around the area will see many vacant shops many under large apartment buildings. Dining habits have radically changed over the last few years with a noticeable decline across the area – check out Green Square, so sad!
The height!
Two buildings are to have the height increased which will create massive towers overshadowing areas the east - in the afternoon, west - in the morning and south – just about all day. The historical water pumping station will see very little natural light as it will be wedged in by buildings on all sides, except south where there is no sun.
Bourke Street North is proposed to go from a ‘typical in the area’ height of 12 storeys to almost triple - 31 storeys. There is only one building in the area that high – Green Square where transport infrastructure is maximised. Ovo acts like a sun dial casting broad slash shadows over the surrounding roads.
Young Street Tower – which was originally approved to be 21 storeys, currently the high side of the local area in terms of building height, this will increase to a massive 38 storeys, dominating the landscape and casting shadows over the local district.
The original design for the site, was high in density. It is now proposed to increase dramatically by an additional 233 dwellings. It will also create a much wider shadow effect on buildings outside the development site as well as visual dominance given its block/square design.
Community
The Waterloo/Zetland precinct has grown significantly over the last 10 years. This has put massive pressure on the local community and resources. It is under pressure now.
Outdoor Space: A park is planned in the development. Disappointingly though this proposal seeks to increase dwellings by 233 – but there is no increase in the public outdoor space within the precinct.
Further, the park is going to be in shadow for a large part of the day. Therefore, other local parks will be utilised by residents where they can obtain sunlight, putting additional pressure on these communities.
Pressure on existing services: Increased population will put additional pressure on local libraries, schools, childcare and medical services. The bus only transport system will also be put under pressure with residents having to wait for extended periods as busses drive past full.
New demographics: The new student accommodation adjacent to the development on McEvoy Street is also going to add to a change in the area with increased pressure on community services and infrastructure.
The new development seeks to offer accommodation for essential workers. This is a positive however, these people also work erratic and long hours and this in turn will change the dynamic of the local community, potentially having both positive and negative impacts.
Currently I walk my dog most afternoons. Daily I pass this site either down Bourke Street, up Dank Street or along Young. I will in the future walk in shadow as well a dodge cars and bikes (especially as there is no dedicated bike path). In addition, I’m sure there will many more dogs and children looking to enjoy the limited outdoor space.
Conclusion
In conclusion I am against the change to this development. The earlier balanced masterplan, that was approved and should be maintained.
The changes are excessive in height, will disadvantage existing as well new residents, put considerable pressure on infrastructure and radically change the community. I urge that the development application be rejected.
Best regards
Philip Smith 3 Hunter Street Waterloo 2017
I have lived locally for 12 years and seen massive change in the area over that time. I expect change and know that change will happen in the area as it moves from industrial to residential. However, overall past development has been balanced, as well as providing the community with many benefits.
Originally as planned this development was approved with height and density creating a socially responsible balance. It was a dense masterplan development with greenspace and infrastructure support. It no long is.
Infrastructure
This is crucial for the success of any development. It is essential that people can get in and out of a location. Good infrastructure brings visitors into an area to help sustain local businesses. For this development infrastructure is poor.
Transport Networks: The heavy rail network, Green Square and Redfern, are each a good 20-minute walk away. The metro at Waterloo is also a 20-minute walk as is the light rail in another direction. Though, these are all positive a 20-minute walk for most people is too long and therefore not practical for daily commutes and even visitors.
The area, therefore, is only directly served by busses. These are already very well patronised – stretched in peak times. Injecting an additional 580 apartments is going to put additional pressures on this service. Buses will need to be increased to cope with the demand.
Even if busses are significantly increased many people, both residents and visitors will still be dependent on motor vehicles. This should not be the outcome of any development. The area will not cope well more vehicles. It will put additional pressure on street parking, causing inconvenience as well traffic blockage. It is already in high demand. Parking spaces for residents in the proposed buildings have not increased.
Walking will not increase; in fact, it will probably decrease given the increased traffic.
In addition, there are no on street electric vehicle charging hubs, though there are some charging facilities in shopping centre car parks.
The two best local retail precincts in the area East Village Shopping Centre and Surry Hills Shopping Village both offer adequate parking to supplement the local population by drawing visitors from other parts of Sydney. New developments can’t survive without adequate parking. Surry Hills Shopping Village with the strong restaurant mix supports/highlighting this fact.
Retail Infrastructure: This will change over time, but it is challenging especially now. For example Dank Street has morphed, after struggling since COVID, from cafes and restaurants to a design fit out/renovation street dominated by Winnings, plumbing/bathroom suppliers, flooring and garden furniture. Foot traffic has declined dramatically. Food outlets have opened but mostly closed. There are now only 2 food outlets at its peak there were 7 maybe 8!
A walk around the area will see many vacant shops many under large apartment buildings. Dining habits have radically changed over the last few years with a noticeable decline across the area – check out Green Square, so sad!
The height!
Two buildings are to have the height increased which will create massive towers overshadowing areas the east - in the afternoon, west - in the morning and south – just about all day. The historical water pumping station will see very little natural light as it will be wedged in by buildings on all sides, except south where there is no sun.
Bourke Street North is proposed to go from a ‘typical in the area’ height of 12 storeys to almost triple - 31 storeys. There is only one building in the area that high – Green Square where transport infrastructure is maximised. Ovo acts like a sun dial casting broad slash shadows over the surrounding roads.
Young Street Tower – which was originally approved to be 21 storeys, currently the high side of the local area in terms of building height, this will increase to a massive 38 storeys, dominating the landscape and casting shadows over the local district.
The original design for the site, was high in density. It is now proposed to increase dramatically by an additional 233 dwellings. It will also create a much wider shadow effect on buildings outside the development site as well as visual dominance given its block/square design.
Community
The Waterloo/Zetland precinct has grown significantly over the last 10 years. This has put massive pressure on the local community and resources. It is under pressure now.
Outdoor Space: A park is planned in the development. Disappointingly though this proposal seeks to increase dwellings by 233 – but there is no increase in the public outdoor space within the precinct.
Further, the park is going to be in shadow for a large part of the day. Therefore, other local parks will be utilised by residents where they can obtain sunlight, putting additional pressure on these communities.
Pressure on existing services: Increased population will put additional pressure on local libraries, schools, childcare and medical services. The bus only transport system will also be put under pressure with residents having to wait for extended periods as busses drive past full.
New demographics: The new student accommodation adjacent to the development on McEvoy Street is also going to add to a change in the area with increased pressure on community services and infrastructure.
The new development seeks to offer accommodation for essential workers. This is a positive however, these people also work erratic and long hours and this in turn will change the dynamic of the local community, potentially having both positive and negative impacts.
Currently I walk my dog most afternoons. Daily I pass this site either down Bourke Street, up Dank Street or along Young. I will in the future walk in shadow as well a dodge cars and bikes (especially as there is no dedicated bike path). In addition, I’m sure there will many more dogs and children looking to enjoy the limited outdoor space.
Conclusion
In conclusion I am against the change to this development. The earlier balanced masterplan, that was approved and should be maintained.
The changes are excessive in height, will disadvantage existing as well new residents, put considerable pressure on infrastructure and radically change the community. I urge that the development application be rejected.
Best regards
Philip Smith 3 Hunter Street Waterloo 2017
meng hua
Object
meng hua
Object
WATERLOO
,
New South Wales
Message
The impacts of this development will include:
1. Infrastructure strain — the extra residents would place unacceptable pressure on local
roads, parking and public transport, all of which are already stretched. Services such as
the 304 bus and peak-hour trains from Green Square are already at or near capacity, and
buses often pass by because they’re full.
2. Shortage of amenities - Public amenities are already under pressure and are unlikely to
keep pace with the additional residents. Even now it can be difficult to find a place to
sit and work at the library. This development would add further strain and make an
already crowded situation worse.
3. Visually overbearing development - The proposed height is far too large for its
surroundings and is out of character with the existing neighbourhood. Its scale would
dominate the local streetscape and create a serious visual impact, undermining the
current character of the area.
4. Overshadowing impacts - The two oversized towers proposed at 903-921 Bourke Street,
together with the tower proposed at 881-885 Bourke Street, would create significant
cumulative overshadowing during the winter solstice, affecting a large area of nearby
homes and public open space.
1. Infrastructure strain — the extra residents would place unacceptable pressure on local
roads, parking and public transport, all of which are already stretched. Services such as
the 304 bus and peak-hour trains from Green Square are already at or near capacity, and
buses often pass by because they’re full.
2. Shortage of amenities - Public amenities are already under pressure and are unlikely to
keep pace with the additional residents. Even now it can be difficult to find a place to
sit and work at the library. This development would add further strain and make an
already crowded situation worse.
3. Visually overbearing development - The proposed height is far too large for its
surroundings and is out of character with the existing neighbourhood. Its scale would
dominate the local streetscape and create a serious visual impact, undermining the
current character of the area.
4. Overshadowing impacts - The two oversized towers proposed at 903-921 Bourke Street,
together with the tower proposed at 881-885 Bourke Street, would create significant
cumulative overshadowing during the winter solstice, affecting a large area of nearby
homes and public open space.
Name Withheld
Object
Name Withheld
Object
WATERLOO
,
New South Wales
Message
To the Department of Planning, Housing and Infrastructure,
I write to object to the proposed development at 903–921 Bourke Street, Waterloo, specifically on the grounds of excessive density and overdevelopment.
Overdevelopment and Excessive Density
The proposal to increase the development to 580 apartments (an additional 204 dwellings) represents a significant and unjustified intensification of the site.
This level of density is inappropriate for the location and raises serious concerns:
1. Overcrowding and Liveability
A development of this scale will lead to, increased population concentration beyond what the site and surrounding area can comfortably support, we also have Danks Street District coming up with many apartments as well.
High-density outcomes of this nature often result in diminished quality of living, particularly when not matched with proportional increases in amenity.
2. Floor Space Ratio (FSR) Increase is Excessive
The proposed increase in FSR from 1.5:1 to 3.2:1 is more than double the existing control.
This represents:
- A substantial overdevelopment of the site
- A clear departure from the intended planning framework
- An outcome driven by maximising yield rather than appropriate urban design
Such a large uplift is not consistent with balanced and sustainable development principles.
3. Pressure on Local Infrastructure
The increase in dwelling numbers will place additional demand on already stretched infrastructure, including:
- Roads and traffic networks
- Public transport services
- Local amenities and community facilities
There is insufficient justification that the surrounding infrastructure can support this level of additional density.
4. Inadequate Justification for Increased Yield
The scale of the proposed increase appears to prioritise development intensity over community outcomes.
There is limited evidence that:
- The increase delivers meaningful public benefit
- The design sufficiently mitigates the impacts of such density
- The proposal aligns with long-term planning objectives for the area
Conclusion
The proposed increase in density is excessive, poorly justified, and inconsistent with the principles of sustainable urban development.
I respectfully request that the Department reject the proposed increase in dwelling numbers and Floor Space Ratio, or require a substantial reduction to align with existing planning controls and community expectations.
Yours sincerely,
I write to object to the proposed development at 903–921 Bourke Street, Waterloo, specifically on the grounds of excessive density and overdevelopment.
Overdevelopment and Excessive Density
The proposal to increase the development to 580 apartments (an additional 204 dwellings) represents a significant and unjustified intensification of the site.
This level of density is inappropriate for the location and raises serious concerns:
1. Overcrowding and Liveability
A development of this scale will lead to, increased population concentration beyond what the site and surrounding area can comfortably support, we also have Danks Street District coming up with many apartments as well.
High-density outcomes of this nature often result in diminished quality of living, particularly when not matched with proportional increases in amenity.
2. Floor Space Ratio (FSR) Increase is Excessive
The proposed increase in FSR from 1.5:1 to 3.2:1 is more than double the existing control.
This represents:
- A substantial overdevelopment of the site
- A clear departure from the intended planning framework
- An outcome driven by maximising yield rather than appropriate urban design
Such a large uplift is not consistent with balanced and sustainable development principles.
3. Pressure on Local Infrastructure
The increase in dwelling numbers will place additional demand on already stretched infrastructure, including:
- Roads and traffic networks
- Public transport services
- Local amenities and community facilities
There is insufficient justification that the surrounding infrastructure can support this level of additional density.
4. Inadequate Justification for Increased Yield
The scale of the proposed increase appears to prioritise development intensity over community outcomes.
There is limited evidence that:
- The increase delivers meaningful public benefit
- The design sufficiently mitigates the impacts of such density
- The proposal aligns with long-term planning objectives for the area
Conclusion
The proposed increase in density is excessive, poorly justified, and inconsistent with the principles of sustainable urban development.
I respectfully request that the Department reject the proposed increase in dwelling numbers and Floor Space Ratio, or require a substantial reduction to align with existing planning controls and community expectations.
Yours sincerely,