Skip to main content
Natural Resources Access Regulator
Comment
Wollongong , New South Wales
Message
This is a pre-approval major project referral which must be sent to the Landuse Enquiries team at [email protected] for a coordinated response with DPIE Water rather than direct to NRAR.
Crown Lands
Comment
,
Message
Crown Lands provides the following comments and requests:
1) Please provide a copy of the following plans to the Department for review and comments when available:-
 Construction Environmental Management Plan
 Biodiversity Management Sub-Plan
 Biosecurity Management Sub-Plan
 Erosion & Sediment Control Plan
 Flora & Fauna Sub-Plan
 Reinstatement & Rehabilitation Plan
 Rehabilitation & Landscaping Management Sub-Plan
 Soil Management Sub-Plan
 Stormwater Management Sub-Plan
2) The proponent should note a proposal outlining the details and future maintenance of level crossing has not been forwarded to the Department for assessment and consent. Please forward a copy.
3) Where the proposed rail alignment has the potential to impact on existing Travelling Stock Reserves (TSRs), the proponent should also consult and reference the Department to identify potential solutions for treatment of rail and TSR interfaces.
4) Consultation should be made with Local Land Services (LLS) and the Department should the proposed rail maintenance access roads are required through Crown land, including TSRs. A licence will be required for any earthworks involved prior to works commencing.
5) It is noted that some of the proposed laydown areas and proposed sewage treatment plant are located on Crown land, including TSRs. A detailed proposal should be forwarded to the Department and LLS for consultation and comments. A licence will be required through the Department for such the site occupation, storage and access, prior to works commencing.
6) Works on waterways may require a licence through the Department, in particular for the new proposed 11 bridges and the viaduct. A detailed proposal including designs and location of fencing and signage should be forwarded to the Department for consultation and comments.
7) The proponent should first consult with LLS on any propose acquisition over TSRs under the Land Acquisition (Just Terms Compensation) Act 1991. An acquisition application is to be lodged with the Department who is responsible for the making of the final decision as the landowner.
8) Where there is intended earthwork and site rehabilitation is required, the proponent should consult with the Department and LLS prior to commencement of works. Rehabilitation plan should be agreed to by all parties prior to works commencement.
9) Details on fauna passage and fauna fencing, including designs, should be forwarded to the Department for comments should the location comprise of Crown land (including TSRs).
10) Detailed design on aquatic fauna should be forwarded to the Department for comments when available.
11) Where disturbed soil is to be re-used for filling, the proponent should take all necessary measures including spraying to minimise the potential spread and/or introduction of weeds at site.
12) The proponent to notify the Department as soon as practicable should any heritage site/item be identified on Crown land (including TSR).
13) The Department notes ongoing access may be required via Crown land for the below proposed borrow pits in which the proponent is required to confirm with the Department if this would be the case forward. The proponent should note the use of the below Crown roads and TSRs are permitted and consistent with the public’s right of passage and “right of access” under Section 75 of the Local Land Services Act 2013 respectively. The Crown roads and TSRs shall not be used in ways that are inconsistent with the purpose otherwise. The proponent will be liable for any damage brought to the access tracks including but not limited to the repair of access track’s surface and maintenance work as required. However, any forms of work should be consulted and obtain prior written approval from the Department and LLS.
• “Site 5” may require ongoing access via TSR Lot 16 DP 756015 managed by LLS,
• “Site 7” and “Site 9” may require ongoing access via Crown roads under the Department’s management and subject to current Enclosure Permits,
• “Site 13” may require ongoing access via TSR Lot 7304 DP 1158724 and Lot 7003 DP 1059798 managed by LLS and the Department respectively.
Simon Doolin
Support
NORTH STAR , New South Wales
Message
Please see my submission for my quarry for the inland rail,
thank you, can you please notify me when you recieve it please,
cheers Simon
Attachments
Western Sydney Planning Partnership
Comment
Parramatta , New South Wales
Message
Attachments
Biodiversity and Conservation Division
Comment
,
Message
EES requested an extension by email on 2 October . A copy of the EES response (dated 15 October ) is attached
Attachments
Name Withheld
Support
WOLLSTONECRAFT , New South Wales
Message
I submit the Wollstonecraft Precinct submission, as attached.
Denis Moore
Object
WOLLSTONECRAFT , New South Wales
Message
I totally and utterly object to this development.
Attachments

Pagination

Subscribe to