Skip to main content
Football NSW
Support
Glenwood , New South Wales
Message
Please view uploaded submission.
Attachments
Roger Hioward
Object
Kellyville , New South Wales
Message
I have read through the development proposal and I have two major concerns leading to my objection to the proposal. The traffic generation estimates are based on the Beaumont school travel mode surveys that is not like for like The current Hezlett Rd has major problems with traffic build up particularly since the opening of the North Kellyville shopping centre and is now a main thoroughfare to Samantha Riley Drive. It is of paramount importance that Hezlett Road be made a two lane road in both directions before any construction work commences. To this end Samantha Riley Drive widening should also be completed. before construction on the school commences. Why this aspect has not been given the necessary accelerated completion is just very bad planning to say the least.

Roger Howard
Joyce Ma
Object
Kellyville , New South Wales
Message
TREE REMOVAL there are less and less trees in Kellyville. Mostly cut down just for the purpose of new residential or public usage. We need to have a balance and to keep Kellyville a leafy suburb and protect the nature environment.Tree damage is too serious in this suburb!
Name Withheld
Object
KELLYVILLE , New South Wales
Message
I wish to express concern regarding the lack of proposed parking for North Kellyville Public School. At present, it would seem that there is allocation for only 12 on site car spaces. A school that is going to cater for up to 1000 students, will have approximately 70 teaching and SAS staff. If on site parking is not provided for staff then they will be forced to park in the surrounding streets which will already be congested with residents' and parents' vehicles. Whilst this is clearly a cost cutting measure on behalf of the Dept of Education, one would hope that the Dept of Planning and Environment would consider the safety of the students attending the school, as well as the effects on nearby residents of the school. It is also disappointing that a two story building has been proposed, rather than something along the lines of Ironbark Ridge Public School, which is a more appropriate layout given the residential surrounds of the school.
Calum Henderson
Comment
Kellyville , New South Wales
Message
As someone who is building in the area and looking forward to seeing my children attend this school, I am excited to see progress being made in its construction.

However, I am deeply concerned about the effects that the lack of on-site parking will have on the local streets. Given that there will be 1000 students, 40 teachers and numerous other staff, I am concerned that if the community car parks mentioned in the proposal are not used by teachers and other staff then they will park in local streets which will render local street parking unusable by local residents and their guests.

I hope that priority is given to ensuring that the community car parks are used by staff of the school.
Urbis
Object
Sydney , New South Wales
Message
Dear Rebecka,

Re: SSD 16_7683: NEW RESTAURANT AND MICRO-BREWERY, OVERSEAS PASSENGER TERMINAL (TENANCY 5)

We write on behalf of Tallawoladah Pty Limited to provide an objection to SSD 16_7683, which seeks consent for the use of Tenancy 5 of the Overseas Passenger Terminal (OPT) building as a new indoor and outdoor restaurant, bar and micro-brewery. The works proposed include external amendments to the OPT building, additional outdoor seating areas, new awning/sun shading structure to outdoor seating areas, new balconies and decks on Level 2, new awning above the Level 2 balcony, signage, new outdoor walk up bar, and a new micro-brewery within an external pod structure.

Tallawoladah Pty Ltd are the proponent for State Significant Development Application 7056 (SSD 7056). The application was lodged with the NSW Department of Planning and Environment (DPE) in October 2015 and seeks approval for the remediation, renewal, adaptive re-use and revitalisation of Campbell's Stores, The Rocks. The application is currently under assessment by the Key Sites Assessment team of DPE.

Tallawoladah Pty Ltd were made aware of the application to redevelop Tenancy 5 on 25 January 2017, despite the public exhibition commencing on 30 November 2016. Consequently, the project team have not had sufficient time to review the application in detail. This letter therefore provides a summary of our points of objection and is to be followed by a more comprehensive and detailed analysis of the issues raised and the implications on the existing and future operations of Campbell's Stores, The Rocks.

We thank-you for the opportunity to comment on the application.

Kind regards,
Samantha Wilson
Senior Consultant - Urbis
Fire and Rescue NSW
Comment
Greenacre , New South Wales
Message
See attached.
Attachments

Pagination

Subscribe to