The existing culvert (single cell 600mm) will be replaced with a triple-cell 1050mm culvert, maintaining the current invert level (the pipes will be placed at the same elevation as the existing setup). Included in the attachment is the shop drawing for the triple-cell 1050mm headwall. Each row will consist of 5 x 1050mm pipes. It is estimated that the works will impact an area measuring approximately 15m x 7.5m, centred on the road/culvert.

Review of Environmental Factors (REF) (1)

The approved project is described in the REF, as modified by any associated decision statement (see supporting documents).
Review of Environmental Factors
QPC018 Jerrabattgulla Cr Replacement REF_ESCP_V1_P5-2025-402 SIGNED
Date : Tue, 23/12/2025 - 10:57

Activity Details

Reference number
P5-2025-402
Proponent(s)
Queanbeyan-Palerang Regional Council
Address
961 Jerrabattgulla Road Jerrabattgulla 2622
Legislation
TISEPP (State Environmental Planning Policy (Transport & Infrastructure) 2021)
Activity Type
Roads and road infrastructure facilities
Decision
Approved
Determination date