Part3A Modifications
Determination
Ardmore Park Quarry Modification 3
Goulburn Mulwaree
Current Status: Determination
Attachments & Resources
Application (2)
Request for DGRS (2)
EA (9)
Submissions (10)
Response to Submissions (42)
Recommendation (3)
Determination (3)
Submissions
Showing 41 - 60 of 114 submissions
Anne Wiggan
Object
Anne Wiggan
Object
Bungonia
,
New South Wales
Message
My submission is as an attachment
Name Withheld
Object
Name Withheld
Object
Bungonia
,
New South Wales
Message
We live in a rural residential area. My kids go to sleep at 8:30 to go to
school. It will be very hard on them to sleep with trucks still going
up and down the street till 10:30 and starting again at 5:30. There is
not enough water supply long term in the area for farmers like
ourselves let along to run a quarry. The extra production they want
there is no longevity with water supply or the roads. We live in a
rural eviromentally protected area not a industrial area or the city.
school. It will be very hard on them to sleep with trucks still going
up and down the street till 10:30 and starting again at 5:30. There is
not enough water supply long term in the area for farmers like
ourselves let along to run a quarry. The extra production they want
there is no longevity with water supply or the roads. We live in a
rural eviromentally protected area not a industrial area or the city.
Skye Ward
Object
Skye Ward
Object
Bungonia
,
New South Wales
Message
As a young family living on Jerrara Road we strongly oppose the proposed
modification to PA 07_0155. In particular, we object the proposal to
increase the annual production limit from 400,000tpa to 580,000tpa
(and the associated increase in tuck loads to 50.3t per load) as well
as, the increase in hours of operation for product loading and
transportation (from 5am to 10pm on Monday to Friday and 5am to 5pm on
Saturday). As residents with driveway access onto Jerrara Road and
regular users of Jerrara Road, we are already very concerned by the
number of trucks that travel along Jerrara Road(currently 88 truck
movements per day) as well as the times during the day when the trucks
travel along Jerrara Road (with 56 `approved quarry heavy' trucks
currently travelling along Jerrara Road during school bus hours).
These concerns, as well as the condition of Jerrara Road (which
remains substandard despite the ongoing roadworks to widen the road)
deterred us from enrolling our school age child at Marulan Public
School (our closest school and the school we are zoned to) as we
didn't want our children travelling on Jerrara Road twice a day. Now
that there are the proposed modifications to increase the truck
movements to 124 per day, increase the vehicle size to 25.3 metres and
increase the hours of operation - makes us extremely worried for the
safety of our family on Jerrara Road and we already avoid using
Jerrara Road as much as possible - preferring to travel a longer
distance (via Mountain Ash Road to Goulburn) to avoid sharing the road
with such a number of large trucks. Based on these concerns for the
safety of our family on Jerrara Road, we strongly oppose the proposed
modification to PA 07_0155 particularly until the road is widened and
meets council regulations. Given the current state of Jerrara Road and
stipulations that the road be completed by March 2018, Jerrara Road is
simply not up to standard to support an increase in the number of
truck movements, an increase in the size of the trucks and to have
trucks travelling in the dark from 5am to 10pm. We are extremely
concerned local residents and hope the concerns for the safety of our
family travelling on Jerrara Road - and those of other drivers on the
road - are taken seriously into consideration.
modification to PA 07_0155. In particular, we object the proposal to
increase the annual production limit from 400,000tpa to 580,000tpa
(and the associated increase in tuck loads to 50.3t per load) as well
as, the increase in hours of operation for product loading and
transportation (from 5am to 10pm on Monday to Friday and 5am to 5pm on
Saturday). As residents with driveway access onto Jerrara Road and
regular users of Jerrara Road, we are already very concerned by the
number of trucks that travel along Jerrara Road(currently 88 truck
movements per day) as well as the times during the day when the trucks
travel along Jerrara Road (with 56 `approved quarry heavy' trucks
currently travelling along Jerrara Road during school bus hours).
These concerns, as well as the condition of Jerrara Road (which
remains substandard despite the ongoing roadworks to widen the road)
deterred us from enrolling our school age child at Marulan Public
School (our closest school and the school we are zoned to) as we
didn't want our children travelling on Jerrara Road twice a day. Now
that there are the proposed modifications to increase the truck
movements to 124 per day, increase the vehicle size to 25.3 metres and
increase the hours of operation - makes us extremely worried for the
safety of our family on Jerrara Road and we already avoid using
Jerrara Road as much as possible - preferring to travel a longer
distance (via Mountain Ash Road to Goulburn) to avoid sharing the road
with such a number of large trucks. Based on these concerns for the
safety of our family on Jerrara Road, we strongly oppose the proposed
modification to PA 07_0155 particularly until the road is widened and
meets council regulations. Given the current state of Jerrara Road and
stipulations that the road be completed by March 2018, Jerrara Road is
simply not up to standard to support an increase in the number of
truck movements, an increase in the size of the trucks and to have
trucks travelling in the dark from 5am to 10pm. We are extremely
concerned local residents and hope the concerns for the safety of our
family travelling on Jerrara Road - and those of other drivers on the
road - are taken seriously into consideration.
Phillip & Diane Broadhead
Object
Phillip & Diane Broadhead
Object
Bungonia
,
New South Wales
Message
uploaded 5 attachments
Name Withheld
Object
Name Withheld
Object
Bungonia
,
New South Wales
Message
Submission attached.
Name Withheld
Object
Name Withheld
Object
BUNGONIA
,
New South Wales
Message
I have just returned after several weeks away, and therefore have not had
a chance to thoroughly go into this whole Modification Request Ardmore
Park Quarry. Application No. MP 07_0155 MOD 3, so therefore will be
only able to respond to the obvious parts that immediately hit me as
potential problems. (1) Obviously, the water table under the ground
that all surrounding properties rely on for their stock and their own
crop growing. The massive amount of this water being used by the
quarry, specially if increased loads rise another 1/3rd more than
current rate. (2) The longer hours of operation - 17 hrs (5am to 10pm)
M-F and 5am to 5 pm sat. ... all sound is magnified in quiet rural
areas, specially in early morning hours and after 7pm. The increased
volume of Traffic from Sydney, etc, going to the coast, and weekend
visitors who come through Bungonia any time from around 3pm to
midnight will not be expecting large dog and trailer trucks at 5am,
nor after 8pm at night on unlit country roads. (3) The increased
volume of trucks, from 88 movements per day to 124 movements. Equates
to more than 7 each hour and carrying 50 tonnes instead of original 30
Tonnes. They will be coming back fully laden with backfill and stock
piled (3) The quarry wants to mine another 180,000 Tonnes, over the
current allowance, and also extend the life of the quarry over another
8 yrs. (4) A big issue will also be the haul route on Jerrara Road.
The new widening, and resurfacing, is breaking down already, as is
evident in several placees. The thin layer of Ashphalt is going to be
worthless in a couple of months. That road needs strong , thick
bitumen edge to edge, to support larger trucks. The surfacing being
done right now, definitety is not going to last.
a chance to thoroughly go into this whole Modification Request Ardmore
Park Quarry. Application No. MP 07_0155 MOD 3, so therefore will be
only able to respond to the obvious parts that immediately hit me as
potential problems. (1) Obviously, the water table under the ground
that all surrounding properties rely on for their stock and their own
crop growing. The massive amount of this water being used by the
quarry, specially if increased loads rise another 1/3rd more than
current rate. (2) The longer hours of operation - 17 hrs (5am to 10pm)
M-F and 5am to 5 pm sat. ... all sound is magnified in quiet rural
areas, specially in early morning hours and after 7pm. The increased
volume of Traffic from Sydney, etc, going to the coast, and weekend
visitors who come through Bungonia any time from around 3pm to
midnight will not be expecting large dog and trailer trucks at 5am,
nor after 8pm at night on unlit country roads. (3) The increased
volume of trucks, from 88 movements per day to 124 movements. Equates
to more than 7 each hour and carrying 50 tonnes instead of original 30
Tonnes. They will be coming back fully laden with backfill and stock
piled (3) The quarry wants to mine another 180,000 Tonnes, over the
current allowance, and also extend the life of the quarry over another
8 yrs. (4) A big issue will also be the haul route on Jerrara Road.
The new widening, and resurfacing, is breaking down already, as is
evident in several placees. The thin layer of Ashphalt is going to be
worthless in a couple of months. That road needs strong , thick
bitumen edge to edge, to support larger trucks. The surfacing being
done right now, definitety is not going to last.
Goulburn Mulwaree Council
Comment
Goulburn Mulwaree Council
Comment
Goulburn
,
New South Wales
Message
Please refer to the attached document
Dean Mireylees
Object
Dean Mireylees
Object
Bungonia
,
New South Wales
Message
We, Dean & Anne MIreylees appose the modified application as follows *
The extension to transport hours, we do not want to hear trucks going
past our farm at 0500hrs every day of the week or so late at night
till 2200hrs. In a normal town setting no lawn mowers are to start
till 0800 and everything to stop at 2000hrs. We are very concerned
about the proposed 0500hrs on the Saturday due to the increased
traffic of our area without trucks being added to the equation. we
chose to live here in Bungonia on our little farm for the quiet life,
we moved away from the urban dwelling for that reason. * we have a
concern regarding the larger trucks have the current upgrade of the
roads accomodated these larger size( width) and increase in capacity
(weight) *we feel that the addition of a bitumen pre-coating plant at
the quarry doesn't support the locals who already have this business
up and running in Goulburn. they should be supporting local business
and those who have jobs there. we are sure that this addition to the
quarry would mean more truck movements that don't come under any
proposal. * we don't want an increase in the number of truck movements
per day. this is a substantial increase from 88 up[ to 124 movements
per day. it is our understanding that these bigger better more
improved trucks carry a larger load than the previously proposed
trucks. these new trucks carry 53tonne as apposed to the previous
trucks capacity of 33tonnes . therefore we don't understand why he
needs to increase the hours or the truck movements( my wife had a
visit from Mick Rogers the company liaison coincidently after making
comments on facebook about the quarry - talking with locals. in the
middle of the day he found out who we were and where we lived invading
our privacy to tell us if we have an issues about the quarry to call
him. he informed my wife that there wouldn't be 124 truck movements
every day only 88 if the weather was fine but if there was some rainy
days then they would have to make up their loses on the subsequent
days.- so if we have say a week of rain then the next week they will
have 124 truck movements every day thereafter till they reach their
quota ?? So that could mean a whole week or more of 124 truck
movements everyday. * also we don't understand what the 'amending the
wording of several administrative conditions ' means or how it will
affect us on our farm. in closing we moved onto our farm for the quiet
life of living off the land to raise our children amongst farm animals
and the beautiful wildlife of the Bungonia area. we didn't buy our
farm so that we could listen toe 124 trucks going past our property
daily. lifestyle farm not truck haul route.
The extension to transport hours, we do not want to hear trucks going
past our farm at 0500hrs every day of the week or so late at night
till 2200hrs. In a normal town setting no lawn mowers are to start
till 0800 and everything to stop at 2000hrs. We are very concerned
about the proposed 0500hrs on the Saturday due to the increased
traffic of our area without trucks being added to the equation. we
chose to live here in Bungonia on our little farm for the quiet life,
we moved away from the urban dwelling for that reason. * we have a
concern regarding the larger trucks have the current upgrade of the
roads accomodated these larger size( width) and increase in capacity
(weight) *we feel that the addition of a bitumen pre-coating plant at
the quarry doesn't support the locals who already have this business
up and running in Goulburn. they should be supporting local business
and those who have jobs there. we are sure that this addition to the
quarry would mean more truck movements that don't come under any
proposal. * we don't want an increase in the number of truck movements
per day. this is a substantial increase from 88 up[ to 124 movements
per day. it is our understanding that these bigger better more
improved trucks carry a larger load than the previously proposed
trucks. these new trucks carry 53tonne as apposed to the previous
trucks capacity of 33tonnes . therefore we don't understand why he
needs to increase the hours or the truck movements( my wife had a
visit from Mick Rogers the company liaison coincidently after making
comments on facebook about the quarry - talking with locals. in the
middle of the day he found out who we were and where we lived invading
our privacy to tell us if we have an issues about the quarry to call
him. he informed my wife that there wouldn't be 124 truck movements
every day only 88 if the weather was fine but if there was some rainy
days then they would have to make up their loses on the subsequent
days.- so if we have say a week of rain then the next week they will
have 124 truck movements every day thereafter till they reach their
quota ?? So that could mean a whole week or more of 124 truck
movements everyday. * also we don't understand what the 'amending the
wording of several administrative conditions ' means or how it will
affect us on our farm. in closing we moved onto our farm for the quiet
life of living off the land to raise our children amongst farm animals
and the beautiful wildlife of the Bungonia area. we didn't buy our
farm so that we could listen toe 124 trucks going past our property
daily. lifestyle farm not truck haul route.
Ros and Ian Beveridge
Object
Ros and Ian Beveridge
Object
Bundonia
,
New South Wales
Message
See attached
Name Withheld
Object
Name Withheld
Object
Bungonia
,
New South Wales
Message
My brothers and I have been training racehorse at Randwick for the past
50 years with the intention of breeding horses and spelling our horse
there so if you allow the quarry to go ahead my farm would be useless
knowing that there would be truck flying up and down jerrara road all
day as our horses would be in the price of $100.000 dollars plus ..
the road is that narrow that there has been roughly about 7 Deaths on
jerrara road secondly what about health issues with people like myself
that suffer from asthma little alone the elderly people that have
health issues Having 40 ton truck flying up and down jerrara road will
only cause my death as these truck drivers don't care To allow this
Quarry to run its trucks up and down jerrara road would be a bad
mistake clearly 1 being the health of every person that lives in
jerrara road 2 the road is not wide enough it will be very dangerous
for residents leaving there home and returning home knowing there will
be trucks speeding up to 80k hour little alone the wild life that will
be killed because of these trucks do you really believe a truck driver
would stop and help the injured wild life No 3 is the Quarry going to
help pay for the cleaning of owners houses because of all the Dust
little alone the dust which will land in the dams which we rely on for
our horses to drink from plus the water from the dams we use to wash
ourselves and our clothing 4 This Quarry must not be approved for
health reasons to residents life’s also our wildlife these are the
Questions that need to be answered is the Quarry willing to pay land
owners companstion for lost of value to there land I also believe
speed cameras should be in stored at the Quarry expense so when one of
the land owners are killed the Quarry can be held responsible And I
believe you Mr Herbert should be asking the NSW police for there
advice and the health minister advice about health issues to the land
owners And the roads authorities to investigate weather the road would
be safe enough for the residents of jerrara road
50 years with the intention of breeding horses and spelling our horse
there so if you allow the quarry to go ahead my farm would be useless
knowing that there would be truck flying up and down jerrara road all
day as our horses would be in the price of $100.000 dollars plus ..
the road is that narrow that there has been roughly about 7 Deaths on
jerrara road secondly what about health issues with people like myself
that suffer from asthma little alone the elderly people that have
health issues Having 40 ton truck flying up and down jerrara road will
only cause my death as these truck drivers don't care To allow this
Quarry to run its trucks up and down jerrara road would be a bad
mistake clearly 1 being the health of every person that lives in
jerrara road 2 the road is not wide enough it will be very dangerous
for residents leaving there home and returning home knowing there will
be trucks speeding up to 80k hour little alone the wild life that will
be killed because of these trucks do you really believe a truck driver
would stop and help the injured wild life No 3 is the Quarry going to
help pay for the cleaning of owners houses because of all the Dust
little alone the dust which will land in the dams which we rely on for
our horses to drink from plus the water from the dams we use to wash
ourselves and our clothing 4 This Quarry must not be approved for
health reasons to residents life’s also our wildlife these are the
Questions that need to be answered is the Quarry willing to pay land
owners companstion for lost of value to there land I also believe
speed cameras should be in stored at the Quarry expense so when one of
the land owners are killed the Quarry can be held responsible And I
believe you Mr Herbert should be asking the NSW police for there
advice and the health minister advice about health issues to the land
owners And the roads authorities to investigate weather the road would
be safe enough for the residents of jerrara road
Department of Industry - Lands and Water
Comment
Department of Industry - Lands and Water
Comment
Sydney
,
New South Wales
Message
See attached
Name Withheld
Object
Name Withheld
Object
Windellama
,
New South Wales
Message
Ardmore Park Quarry Modification MP 07_Mod 3 PA 07_0155 Proposes
We only received this letter of Notification a few days ago and note
dated 21st February 2018
And wish to express concern about the lack of time to respond to the
above modification.
We have 2 properties on 4018 Oallen Ford Road, and 3814 Oallen Ford
Road Windellama 2580 and also commute on a regular basis to Wollongong
and have been doing so over the past 15 years.
Safety
Jerrara Rd, even with its planned improvements, is still only a basic
connecting country road, not designed for excessive truck movements,
with increased movements and weight limits the road condition will
deteriorate rapidly, who will be responsible for its upkeep? The
shoulders will still be rough and broken, accidents will happen.
The roadworks being undertaken on Jerrara Road has been spasmodic all
along the Road between Marulan and Bungonia, without little or no
notification of the stages of future works that are to be undertaken
in sections. The illuminated signs are inconsistent to the length of
road work being undertaken.
Major Road Works Signs about the stages of proposed works at both end
of Jerrara Road are non-existent.
Most major roads works projects have permanent signage to inform the
general public of the stages of works and the persons who has endorsed
/directed / funded and time frame for the major works conducted.
Is NSW Government subsidising the Multiquip Company? If so this should
also be disclosed.
Who is the engineering company contracted for the road works and where
is their name displayed professionally?
The people working on the site are often clearly not seen with the
colour clothing they wear. We express concerns for their own safety.
Extraction and further mining.
The company has not provided current sufficient information to the
general public, about the environmental impact.
An up to date drone aerial photo view would at least outline the
precise boundaries of the site’s progression, and display ongoing
impingement to the environment should at least be provided to
neighbouring properties and provide open disclosure to the general
public.
Ground water issues are still a major concern as flows on some
adjoining properties have significantly reduced over recent years.
These properties have operated for over a hundred years relying on
ground water flows and may become unviable if these flows reduce
further, where does this leave the property owners?
Noise and environmental pollution from product and transportation
should be further addressed. The owner does not appear to live
onsite, which means only those living on neighbouring properties will
be greatly affected.
Increased truck movements
Due to increased production will rip up the road, compromising safety
to the general public leaving continual road works to be undertaken.
Who benefits from unsafe roads?
Operational Bitumen pre- coating Plant on the Quarry Site
There is insufficient information provided about how this will be
undertaken. Again where is the professional requirement and conditions
to the amenity of the land and environment?
Is Ardmore Park proposing a factory site for bitumen production?
Risks Hazzard Pollution, Toxins and Fire.
Extending the life of the Quarry
This mean more traffic movements. Safety is compromised to the
general public and community..
What does the term Excavated Natural Mineral as back fill material
mean ? Insufficient information given professionally to the general
public and community. Does this also involve excess truck movements on
the public road?
Extending the life of the Quarry by 8 years
Extended road safety concerns.
What does the term Performance Based Scheme Trucks mean?
No information provided. More truck movements?.....
We object to the proposal of Ardmore Park Quarry Modification MP
07_Mod 3 PA 07_0155 Proposes.
We only received this letter of Notification a few days ago and note
dated 21st February 2018
And wish to express concern about the lack of time to respond to the
above modification.
We have 2 properties on 4018 Oallen Ford Road, and 3814 Oallen Ford
Road Windellama 2580 and also commute on a regular basis to Wollongong
and have been doing so over the past 15 years.
Safety
Jerrara Rd, even with its planned improvements, is still only a basic
connecting country road, not designed for excessive truck movements,
with increased movements and weight limits the road condition will
deteriorate rapidly, who will be responsible for its upkeep? The
shoulders will still be rough and broken, accidents will happen.
The roadworks being undertaken on Jerrara Road has been spasmodic all
along the Road between Marulan and Bungonia, without little or no
notification of the stages of future works that are to be undertaken
in sections. The illuminated signs are inconsistent to the length of
road work being undertaken.
Major Road Works Signs about the stages of proposed works at both end
of Jerrara Road are non-existent.
Most major roads works projects have permanent signage to inform the
general public of the stages of works and the persons who has endorsed
/directed / funded and time frame for the major works conducted.
Is NSW Government subsidising the Multiquip Company? If so this should
also be disclosed.
Who is the engineering company contracted for the road works and where
is their name displayed professionally?
The people working on the site are often clearly not seen with the
colour clothing they wear. We express concerns for their own safety.
Extraction and further mining.
The company has not provided current sufficient information to the
general public, about the environmental impact.
An up to date drone aerial photo view would at least outline the
precise boundaries of the site’s progression, and display ongoing
impingement to the environment should at least be provided to
neighbouring properties and provide open disclosure to the general
public.
Ground water issues are still a major concern as flows on some
adjoining properties have significantly reduced over recent years.
These properties have operated for over a hundred years relying on
ground water flows and may become unviable if these flows reduce
further, where does this leave the property owners?
Noise and environmental pollution from product and transportation
should be further addressed. The owner does not appear to live
onsite, which means only those living on neighbouring properties will
be greatly affected.
Increased truck movements
Due to increased production will rip up the road, compromising safety
to the general public leaving continual road works to be undertaken.
Who benefits from unsafe roads?
Operational Bitumen pre- coating Plant on the Quarry Site
There is insufficient information provided about how this will be
undertaken. Again where is the professional requirement and conditions
to the amenity of the land and environment?
Is Ardmore Park proposing a factory site for bitumen production?
Risks Hazzard Pollution, Toxins and Fire.
Extending the life of the Quarry
This mean more traffic movements. Safety is compromised to the
general public and community..
What does the term Excavated Natural Mineral as back fill material
mean ? Insufficient information given professionally to the general
public and community. Does this also involve excess truck movements on
the public road?
Extending the life of the Quarry by 8 years
Extended road safety concerns.
What does the term Performance Based Scheme Trucks mean?
No information provided. More truck movements?.....
We object to the proposal of Ardmore Park Quarry Modification MP
07_Mod 3 PA 07_0155 Proposes.
Environment Protection Authority
Comment
Environment Protection Authority
Comment
Queanbeyan
,
New South Wales
Message
See attached
Roads and Maritime Services - Southern
Comment
Roads and Maritime Services - Southern
Comment
Wollongong
,
New South Wales
Message
See attached
Division of Resources and Geoscience
Comment
Division of Resources and Geoscience
Comment
Maitland
,
New South Wales
Message
See attached
Ross Goddard
Object
Ross Goddard
Object
Marulan
,
New South Wales
Message
See attached
NSW Department of Education - School Infrastructure
Comment
NSW Department of Education - School Infrastructure
Comment
Sydney
,
New South Wales
Message
See attached
Paul Madse
Object
Paul Madse
Object
Marulan
,
New South Wales
Message
I disagree with the increase in hours of transport along Jerrara road. As
a local resident this will have major impacts on our quality of life
as the extended hours will increase noise levels passing directly by
my residence. I also believe the impact on wildlife will be increased
and I have already stopped on many occasions to euthanise injured
wildlife as truck drivers rarely stop. The new trucks proposed by
multiquip are just as noisy as any other passing truck when going up
the road pass my house and as all the vegetation has been removed,
noise levels have increased drastically.
a local resident this will have major impacts on our quality of life
as the extended hours will increase noise levels passing directly by
my residence. I also believe the impact on wildlife will be increased
and I have already stopped on many occasions to euthanise injured
wildlife as truck drivers rarely stop. The new trucks proposed by
multiquip are just as noisy as any other passing truck when going up
the road pass my house and as all the vegetation has been removed,
noise levels have increased drastically.
micheal Still
Object
micheal Still
Object
WINDELLAMA
,
New South Wales
Message
My objection is to the performance based scheme and increased hours of
operation. By increasing product limits it would seem that more trucks
or bigger truck (ie) b-doubles would be used to transport the extra
materials out of the quarry area. This raises the ever increasing
concerns of trucks being on country style roads for which the roads
where never built for. Widening roads and spray tar with sprinkles of
rock does not make the roads better. It chips and cracks more
windscreens than ever before, the trucks often cross the double white
lines and more cars are found to over take trucks in more dangerous
situations. My wife for one was pushed off the road because a truck on
a left hand corner was over the double white lines, how she escaped an
horrific accident is beyond words. we have now installed dash cams at
a cost we never thought we would have to bear. This is why I object to
the development, due to more trucks, low police presence, increase
dangerous car drivers, damage to windscreens and paint work and poor
roads not build for tonnage of trucks.
operation. By increasing product limits it would seem that more trucks
or bigger truck (ie) b-doubles would be used to transport the extra
materials out of the quarry area. This raises the ever increasing
concerns of trucks being on country style roads for which the roads
where never built for. Widening roads and spray tar with sprinkles of
rock does not make the roads better. It chips and cracks more
windscreens than ever before, the trucks often cross the double white
lines and more cars are found to over take trucks in more dangerous
situations. My wife for one was pushed off the road because a truck on
a left hand corner was over the double white lines, how she escaped an
horrific accident is beyond words. we have now installed dash cams at
a cost we never thought we would have to bear. This is why I object to
the development, due to more trucks, low police presence, increase
dangerous car drivers, damage to windscreens and paint work and poor
roads not build for tonnage of trucks.
TRACEY keenan
Object
TRACEY keenan
Object
WINDELLAMA
,
New South Wales
Message
My objection is to the performance based scheme and increased hours of
operation. By increasing product limits it would seem that more trucks
or bigger truck (ie) b-doubles would be used to transport the extra
materials out of the quarry area. This raises the ever increasing
concerns of trucks being on country style roads for which the roads
where never built for. Widening roads and spray tar with sprinkles of
rock does not make the roads better. It chips and cracks more
windscreens than ever before, the trucks often cross the double white
lines and more cars are found to over take trucks in more dangerous
situations. I personally for one was pushed off the road because a
truck on a left hand corner was over the double white lines, how I
escaped an horrific accident is beyond words. We have now installed
dash cams at a cost we never thought we would have to bear. This is
why I object to the development, due to more trucks, low police
presence, increase dangerous car drivers, damage to windscreens and
paint work and poor roads not build for tonnage of trucks.
operation. By increasing product limits it would seem that more trucks
or bigger truck (ie) b-doubles would be used to transport the extra
materials out of the quarry area. This raises the ever increasing
concerns of trucks being on country style roads for which the roads
where never built for. Widening roads and spray tar with sprinkles of
rock does not make the roads better. It chips and cracks more
windscreens than ever before, the trucks often cross the double white
lines and more cars are found to over take trucks in more dangerous
situations. I personally for one was pushed off the road because a
truck on a left hand corner was over the double white lines, how I
escaped an horrific accident is beyond words. We have now installed
dash cams at a cost we never thought we would have to bear. This is
why I object to the development, due to more trucks, low police
presence, increase dangerous car drivers, damage to windscreens and
paint work and poor roads not build for tonnage of trucks.
Pagination
Project Details
Application Number
MP07_0155-Mod-3
Main Project
MP07_0155
Assessment Type
Part3A Modifications
Development Type
Extractive industries
Local Government Areas
Goulburn Mulwaree
Decision
Approved
Determination Date
Decider
ED
Contact Planner
Name
May
Patterson
Related Projects
MP07_0155-Mod-1
Determination
Part3A Modifications
Mod 1 - Site Access
Po Box 4 Austral New South Wales Australia 2179
MP07_0155-Mod-2
Determination
Part3A Modifications
Mod 2 - Local Product Delivery
Po Box 4 Austral New South Wales Australia 2179
MP07_0155-Mod-3
Determination
Part3A Modifications
Ardmore Park Quarry Modification 3
Po Box 4 Austral New South Wales Australia 2179