State Significant Development
Burroway Solar Farm
Narromine Shire
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Development of a 100MW solar farm with energy storage and associated infrastructure
Attachments & Resources
Early Consultation (2)
Request for SEARs (1)
SEARs (1)
EIS (14)
Exhibition (1)
Response to Submissions (8)
Agency Advice (58)
Amendments (2)
Additional Information (9)
Recommendation (3)
Determination (2)
Approved Documents
There are no post approval documents available
Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
There are no enforcements for this project.
Note: Only enforcements undertaken by the Department from March 2020 will be shown above.
Submissions
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Over 400Ha that is a lot of radiant heat. What investigation have been done?
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
John Moore
Object
John Moore
Message
1. The Burroway Solar Farm and BESS is a parasitic Solar Farm and BESS complex that is only able, (because of a shortage of weather fuel, sunshine) to operate for a maximum of eight hours a day (33%) and because of clouds and rain, some days produces very little or nothing at all. If it was not subsidised, investors would never consider it as a worthwhile investment.
This statement alone clearly sets out. That by its intermittent and unreliable nature of electricity production, (because of an unreliable supply of ‘weather’ fuel). The Burroway Solar Farm and BESS should never, ever be considered as an economic or dependable electricity generator for supplying baseload electricity to a modern electricity grid.
2. The Burroway Solar Farm and BESS will permanently pollute the farmland it is on, and the agricultural production will be lost each year for the next 100 years or more. Note: At present the Burroway Solar Farm and BESS land is producing each year, a good amount of agricultural produce, that economically benefits the farmer, surrounding towns, cities and eventually Australia with economic stimulation and jobs. As previously stated this will be a very large negative against the SSPH forever.
3. Adding a BESS to the Burroway Solar Farm and BESS, is completely unnecessary and worthless. To add a BESS to the mix, does not produce one MWh of power and actually loses 16% of the power, having to convert it from AC to DC current going into the BESS. And again converting the current via Inverters from DC to AC current when transferring out of the BESS. This loss via conversion only increases the price to the end electricity user. Extremely high prices do as much damage to economies as shortages of supply.
4. The Burroway Solar Farm and BESS does nothing to reduce the World’s emissions. This is because all the Federal and State Net Zero emission goals, Emission Reduction goals and Carbon emission limits on big polluters, are all a waste of money, effort, and will not reduce Global emissions by one iota. The reason is that while Australia’s emissions of Co2 are approximately 1.3% of the World’s emissions at the same time China emits 30% of the World’s emissions and is still growing. Any reduction in Australia’s emissions will be quickly replaced by China’s emissions.
5. The Burroway Solar Farm and BESS is totally reliant on Climate Change subsidies and mandated energy retailer policies, without which it would never be built. Or if the subsidies, etc are removed this Burroway Solar Farm and BESS will be abandoned. Further if the Burroway Solar Farm and BESS cannot afford the cost of building the HV Transmission necessary to connect to the Grid. It is ridiculous for electricity consumers and taxpayers to have to pay for the connecting HV Transmission Lines.
6. Importantly this Burroway Solar Farm and BESS has not made adequate provision for the outbreak of a wildfire from the Solar Farm. Firebreaks are grossly inadequate and fixed water tanks are next to useless. In Victoria CFA fire fighters are refusing to enter Renewable Factories (the NSW RFS is likely to do the same). The risk to surrounding rural residents is frightening.
5. As well the Burroway Solar Farm and BESS has made no financial provision for the dismantling and restoration of the site. Or the cost of the disposal of the toxic, batteries and associated toxic junk.
This is why the Burroway Solar Farm and BESS is not a net contributor to the electricity generation Grid or a viable economic proposition and should never be built.
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
-Land poisoning by toxic chemicals: Look at the attached screenshot of this Livestock Producer Assurance accreditation application. They recognise and acknowledge that land WILL BE POISONED by solar panels and BESS.
- Destruction of agricultural land to host unreliable and intermittent energy. Land in Narromine is precious and used for the agricultural industry.
- Visual impact. Solar panels are an eyesore and ruin the reasons why we live in this rural town.
- Increased fire risk due to solar panels
- Increased fire risk due to BESS (battery energy storage system)
- Environmental destruction
- Negative community impact
- Mental health impacts on the Narromine rural community
- Negative impact on small local businesses & economy
- Traffic safety issues: increased heavy loads on rural roads. Does the council intend to fix the damage caused to the roads as a result of this project?
-reduced safe places for plane emergencies. Narromine is known for it's aviation facilities. This includes gliding, agricultural work and flight training. Using land for solar panels increases risks in aviation and reduces safe places for aircraft in emergencies.
Name Withheld
Object
Name Withheld
Message
*Factually Addressing & Assessing the Serious/Irreversible Health Risks & Impacts to Human Beings & Stock from Solar’s Numerous Heavy Metals including Lead & PFAS BESS Contamination.
Including Emotional/Mental Health impacts for traumatised communities devastated by such destructive plans affecting their livelihoods.
Also, proper, independent analysis of the ongoing Noise Nuisance caused by BESS.
*Livestock Production Assurance Program Clarification is required for grazing Stock on Solar sites:-
The particular question is 2.8 of the "Food Safety on Your Property" section.
*”Do livestock have access to leaking electrical transformers, capacitors, hydraulic equipment, solar panels, wind turbines, coal seam gas structures or coal mine wastes?"*
- Yes
- No
- I am now aware and making plans to restrict access
https://www.facebook.com/groups/2147446775628698/posts/2222816628091712/ https://m.facebook.com/story.php?story_fbid=2222816628091712&id=2147446775628698
*Factually outline the Engineering Facts of how this plan meets all Aspects Equally of the National Electricity Law Objective:-
The objective of the National Electricity Law is to promote efficient investment in, & efficient operation and use of, electricity services for the long term interests of consumers with respect to:-
(a) price, quality, safety, reliability and security of supply of electricity;
and
(b) the reliability, safety and security of the national electricity system;
and
(c) the achievement of targets set by a participating jurisdiction
(i) for reducing Australia’s greenhouse gas emissions; or
(ii)that are likely to contribute to reducing Australia’s greenhouse gas emissions.
AEMO, and everyone in 'authority', place primacy on the emissions target rather than the other requirements of the NEL.
The emissions requirement was only added to the NEL in Sep 2023, with States tardy to legislate any targets, so on what basis did any Gov act prior to that to impose all this on us? Yet they all did, and still emphasise emissions over other objectives.
NEL is made in the SA Parliament, and in the 2nd reading, the minister there also reiterated that ALL OBJECTIVES ARE EQUAL.
As we have clearly seen proven at Broken Hill recently “Wind and Solar are worse than useless in a crisis like this, because it’s detrimental to having a consistent power supply,” Mayor Tom Kennedy said.
“I’d hate to see what happens in the capital cities in a similar crisis.”
https://joannenova.com.au/2024/10/650m-in-renewable-energy-didnt-save-broken-hill-from-days-of-blackouts-after-a-storm-islanded-it/
*Independent, expert clarification of the average Capacity Factor of Industrialised Solar & capability of the BESS is required in order to satisfy the Developer’s claim of supplying reliable energy to power the designated number of households stated.
*Provide a thorough, independent analysis of GENUINE SOCIAL LICENCE (including all Rural Australians) for entombing our limited, irreplaceable Prime Agricultural Land in Industrialised Solar
Community Impact Survey: April-May 2024 – Property Rights Australia
https://propertyrightsaustralia.org.au/community-impact-survey-april-may-2024/
*Abide by Australian and International Environmental Standards:-
AS/NZS ISO/IEC 17021.2:2013 [ISO/IEC TS 17021-2 :2012] Conformity assessment - Requirements for bodies providing audit and certification of management systems. Part 2: Competence requirements for auditing and certification of environmental management systems
AS/NZS ISO/IEC 17021.2:2013 Clause 6.7 regarding Use of Space/Physical Attributes (Clause 6.7)
Requires knowledge of:
a. the interactions of the physical attributes (size, shape and colour) of buildings, structures and equipment with the local environment (eg, man-made structures that detract from natural ambience, nature, flora and fauna, and natural settings of the environment in which they have been placed);
b. Operational controls and techniques to manage physical attributes, such as planning and design, landscaping, use of colour to reduce intrusive impact on the environment; and
c. the monitoring of spatial planning, building and equipment requirements as well as maintenance systems and landscaping.
*Biodiversity Offsets are a damaging environmental scam - becoming a trading market with no successful outcomes.
We need real transparency & demonstrative environmental benefits. The proponent can not be allowed to self-refer at any Government level.
https://www.crikey.com.au/2023/05/18/biodiversity-offsets-scheme-crisis/
Biodiversity offsets
*Address National Security Risks - Foreign Ownership of Critical Energy Infrastructure
There are no secure measures currently in place to prevent malicious actors from using Solar Inverters to disrupt the Solar Electricity Grid.
https://www.senatorpaterson.com.au/news/chinas-spy-threat-to-energy-supplies
Communist China is setting us up for Solar Panel-Based Disaster: https://x.com/JunkScience/status/1824460766918926744
Beautifully Hackable - Irina Slav on Energy - 12/8/24
https://irinaslav.substack.com/p/beautifully-hackable?utm_campaign=email-post&utm_source=substack
In July, Transgrid struck a deal with China’s ZTT International for the delivery of more than 17,500 kilometres of high-voltage conductors to get ahead on HumeLink and VNI West." 4th Dec 2023
https://reneweconomy.com.au/transgrid-hands-out-multi-billion-dollar-contracts-for-controversial-humelink-build/m
*Include Accurate Independent Analysis & Truthful Comparison of all Sources of Power for Reliability, Security, Affordability, Emissions, Toxic Waste Reduction & Minimal Environmental Footprint.
Can We Trust the Energy Transition?
https://www.youtube.com/watch?v=T5j6FVAumlE
The 'Sunk Cost' Trickery That Makes Renewables Seem Cheaper Than They Are - 23rd July 2023.
https://www.fresheconomicthinking.com/p/the-sunk-cost-trickery-that-makes?utm_medium=web
Energy Transition Masquerade: The $360 Billion You Pay - YouTube
https://www.youtube.com/watch?v=x0NKDozvO58
Nuclear VS Renewables: What Will It Cost? | Zoe Hiltonhttps://www.youtube.com/watch?v=Mw_AX9WaJ08
*Include the Proponent’s & Consultant’s Commitment to Integrity & Ethical Behaviour & their Knowledge of the Legal Consequences for any lies or deceit - ie. “confection ….. made up evidence - so lacking in integrity that no weight can be placed on it.”
Name Withheld
Object
Name Withheld
Message
Being a toxic contaminating plan with no upfront Decommissioning/Remediation Bond or an Operational Bond to ensure the complete Clean-Up from sudden Storm or Fire🔥events during its decades of existence is a Public Health & Safety disaster that would render this food producing site & surrounding land & water irreversibly contaminated forever & obviously completely inappropriate for grazing sheep.
Despite Edify’s irresponsible claims, according to Livestock Production Accreditation requirements, livestock must be restricted from ‘leaking Solar Panels.’
Inclusion of Engineering Facts, Scientific Rigour, Integrity & Ethics for Assessment & Determinations is required NOT just trusting the Developer & Ideologically Biased Approving Bureaucrats with Vested Interests.
It is ESSENTIAL to include all of the following to be determined by REPUTABLE, PEER REVIEWED INDEPENDENT EXPERT EVIDENCE NOT the DODGY DEVELOPER EDIFY.
*Determination of all Public Health & Safety Risks to Human Beings/Ecology/Ecosystems including:-
Electrical Force & Electromagnetic Radiation,
Numerous Toxic Heavy Metals including Lead leaching from Solar Panels as they degrade, if inferior, broken/damaged, fractured by hail or burnt & filthy, Fire hazardous BESS PFAS Contamination.
Include cumulative ‘renewable’ contamination impacts which will likely infiltrate the water table and local river systems, jeopardising both our quality of life and broader water infrastructure.
Leaching Via Weak Spots in Solar Panels
https://www.researchgate.net/publication/348883160_Leaching_via_Weak_Spots_in_Photovoltaic_Modules
“Our long-term experiments clearly demonstrate that it is possible to leach out all, or at least a large amount, of the (toxic) elements from the photovoltaic modules. It is therefore not sufficient to carry out experiments just over 24 h and to conclude on the stability and environmental impact of photovoltaic modules.”
Solar Realities - Physicist John Droz jr
https://election-integrity.info/Energy/Solar_Energy_Concerns.pdf
We know that these are some of the toxic (some carcinogenic) chemicals that have been identified as likely being in solar panels (click on the links to get an idea of what some of the adverse health consequences are):
Per- and Polyfluoroalkyl Substances (PFAs)
Perfluorooctane sulphonate (PFOS)
Polytetrafluoroethylene (PTFE)
Fluorinated Ethylene (FEP)
Cadmium Telluride
Copper Indium Selenide Cadmium Gallium diselenide Copper Indium Gallium diselenide Silicon Tetrachloride Hexafluoroethane
Polyvinyl Fluoride
Also, here is a basic explanation of the silicon manufacturing part of solar panels. The following are some additional toxic chemicals that have been identified as possibly being involved in the fabrication of solar panels, which might end up in the finished product:
Hydrogen chloride
Silicon tetrachloride
Hydrochloric acid
Sulfuric acid
Nitric acid
Sulfuric acid
Polycyclic aromatic hydrocarbons Formaldehyde
Arsine gas
Trichlorosilane gas
Silane gas
Sulfur dioxide
Sulfur hexafluoride
Sodium hydroxide
Potassium hydroxide
Lead
Contamination from Industrialised Solar’s Galvanised Steel Supports
https://www.facebook.com/share/p/srbXaCbKgVXocgsm/?mibextid=xfxF2i
James Falcsik White County Indiana Residents Against Solar
21 h
Unmasking the Toxic Truth - The Solar Panel Waste Story
https://youtu.be/_Ck2dHflJ3s?si=0WS5CYhuCb6hNvP0
’Forever chemicals’ used in lithium ion batteries threaten environment, research finds | Lithium-ion batteries | The Guardian 14/7/24
https://www.theguardian.com/technology/article/2024/jul/14/forever-chemicals-
*Factual Assessment of Increased🔥FIRE Risks, including evidence from the local Volunteer Fire Fighters, all landowners in the area, Rural Fire Fighting Pilots & Medical Experts.
Solar Inverter "Burst into Flames:" Fire Injures Worker at South Australia Solar Farm | RenewEconomy - 10th Jan 2024
https://reneweconomy.com.au/inverter-burst-into-flames-investigations-underway-into-fire-at-south-australia-solar-farm/
https://www.researchgate.net/publication/352158070_Safety_of_Grid_Scale_Lithium-ion_Battery_Energy_Storage_Systems
https://static1.squarespace.com/static/656f411497ae14084ad8d03a/t/66fd2383b56dbc6906390297/1727865736681/Fannon-Batteries.pdf
Bouldercombe Battery🔥Fire sparks warning for residents in regional Queensland - 26/09/23
https://www.9news.com.au/national/bouldercombe-battery-fire-sparks-warning-for-residents-in-regional-queensland/b4b3058a-cb0b-4209-a02d-6b12d80c63ac
Gateway Energy Storage System🔥Fire: Otay Mesa, CA - YouTube
https://www.youtube.com/watch?v=A7UY4ioP4VQ
Add yet another Lithium Battery🔥FIRE - this one in Scotland - Lithium Battery Recycling Centre.
https://youtu.be/d-hvsz2tyhc?si=S16_g1LWETu1pj70.
*Confirm the Developer's Adherence to Amended Condition C8.
Prior to Commencement of Any Works - Storm Water Management Plan.
On Site & Discharge From the Site.
Testing Points & Regular Water Samples, Suitably Qualified Person.
Written Response Procedures if CONTAMINATION is Found - required PRIOR to CONSTRUCTION.
Availability of Results.
*Confirm the Developer’s Guarantee to Ensure Clean Drinking Water & No Environmental Contamination as “We have a human right to clean drinking water and an environment free of toxic load,” Dr Stops said. “Dr Orellana reminded us that Australia has ratified the Stockholm Convention on Persistent Organic Pollutants (POPs) in 2004
Sediment Run-Off Contaminating Land/Water - Court Case -
“Created, Operated, and Maintained a Nuisance”
Solar farm runoff pollutes property, couple awarded $135 million - CFACT
https://www.cfact.org/2023/06/06/solar-farm-runoff-pollutes-property-couple-awarded-135-million/
By Bonner Cohen, Ph. D. |June 6th, 2023
25th Oct 2023 update …A federal judge has dramatically reduced a jury’s $135 million award to a Georgia couple (https://www.ajc.com/news/couple-awarded-135m-after-solar-project-turns-their-lake-to-mud-hole/BZ6BYXQREJCDROQV6ZASUW5WOI/
*The Full Life-Cycle Embedded Energy & all Emissions is required to be factually documented - from mining materials, processing, manufacturing, transportation, road works, construction, operation, recycling & waste disposal including all components used for all parts of the plan - Solar EG Works, BESS, Substation, Transmission Lines, etc.
Coal’s Importance For Solar Panel Manufacturing – Watts Up With That?
https://wattsupwiththat.com/2024/05/23/coals-importance-for-solar-panel-manufacturing/
*Accurately Document the Most Potent Greenhouse Gas of all - SF6 Emissions from the full life-cycle of Industrialised Solar, BESS, Switch Gear, Circuit Breakers, etc.
Climate change: Electrical industry's 'dirty secret' boosts warming - BBC News
https://www.bbc.com/news/science-environment-49567197
*Upfront Decommissioning/Remediation Bond & Clean-Up Bond is required to cover full costs (updated in real time)of independently calculated amount with full explanation & identification of where it will be securely held.
Engineer certified, full explanation of all practical actions required to guarantee immediate clean-up after Fires, Storm/Hail Damage, Degradation, etc. & return of the site to its uncontaminated, inherent, food producing capability, including identifying immediately present supplies of substances required to coat broken panels prior to removal, ready access to recycling & toxic waste capability & capacity apart from local Council.
*Transparently confirm the plan to Indemnify Neighbours - due to inability of neighbours to acquire adequate Public Liability Insurance because of Hazardous ‘Renewable’ Industry
*Confirm the Developer’s Adherence to the Commonwealth Modern Slavery Act so NO Components - including Solar Panels & Cobalt for BESS are sourced from cruelly tortured Slave Labour Supply Chains.
NEW MODERN SLAVERY CONDITION- requiring proof prior to construction that NO Slave Labour supply chain components be used in construction.
New Condition Inserted C4A - Dealing With Modern Slavery.
Commonwealth Modern Slavery Act 2018
*NSW Local Council Act 1993
428 Annual Report
438 ZE Duty to Ensure Goods & Services Are Not Procured From Modern Slavery.
*Adherence to Paris Agreement - Taking over farmland to build facilities to produce intermittent energy is a violation of Article 2, Section 1(b) of the Paris Agreement (2015).
Article 2 1(b) of the 2015 Paris Agreement states:
“This Agreement... aims to strengthen the global response to the threat of climate change, in the context of sustainable development and efforts to eradicate poverty, including by:
“(b) Increasing the ability to adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse gas emissions development, in a manner that does not threaten food production”; See: https://unfccc.int/files/essential_background/convention/application/pdf/ english_paris_agreement.pdf .
(continued ->)
Name Withheld
Object
Name Withheld
Message
Solar and wind farms are environmentally destructive, requiring vast amounts of land and disrupting ecosystems, while also posing a significant threat to wildlife like birds. Additionally, their intermittency and high infrastructure costs make them inefficient and unreliable, relying on subsidies that distort the market and burden taxpayers.
Peter Williams
Object
Peter Williams
Message
96% of the Earth’s total carbon dioxide emissions comes from Nature. 4% of the Earth’s carbon dioxide emissions from the actions of ALL HUMANS ON EARTH. Of that 4%, humans in Australia are responsible for around 1.3% of that, which equates to approximately 0.00052% of the World’s total carbon dioxide emissions (1.3% of 4% = 0.0052%).
If Australians presently produce approximately 0.00052% of the World’s carbon dioxide emissions why aren’t we counterbalancing that extremely low level by looking after our oceans, seas, waterways, forests, national parks, farmlands, backyard gardens etc., and increasing our irrigation schemes to grow more crops and vegetation because plants in our oceans and on our landscapes are the PERFECT CARBON CAPTURING MACHINES that are true renewables. Not only are they organic, but they produce LIFE SUPPORTING OXYGEN. Most of the Earth’s oxygen is produced in our seas and oceans, so why would you put floating wind turbines in them which can leak toxic hydraulic fluids into them, and will probably be painted with toxic anti fouling paint that can leach into the nearby marine environment?
By using our high quality coal, gas and uranium, (that we seem happy to sell to other countries for them to have cheap reliable power), to generate power using the old transmission lines, instead of building a very expensive new transmission grid, we can have cheap reliable power. By greening more of Australia we can counteract our already low carbon dioxide emissions. CO2 is a natural occurring gas that plants need to grow and produce oxygen.
We need more practical sense in the power debate, in my opinion.