State Significant Development
Hume Battery Energy Storage System
Albury City
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
A battery energy storage facility, with a maximum storage capacity of 20 MW / 40 MWh.
Attachments & Resources
Request for SEARs (1)
SEARs (1)
EIS (10)
Response to Submissions (5)
Additional Information (3)
Recommendation (1)
Determination (2)
Post-determination Notices (1)
Approved Documents
There are no post approval documents available
Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
There are no enforcements for this project.
Inspections
There are no inspections for this project.
Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.
Submissions
DPI Fisheries
Comment
DPI Fisheries
Message
ENVIRONMENT PROTECTION AUTHORITY
Comment
ENVIRONMENT PROTECTION AUTHORITY
Crown Lands
Comment
Crown Lands
Message
Although the proposal does not impact on Crown land directly, it is adjacent to two Crown Reserves. If the proposal is expected to encroach or impact on either of the adjacent Crown Reserves in any way; notification to, and authorisation of, the proposed activity, should be sought from Crown Lands, Local Land Services (for Travelling Stock Reserve 68940), as well as Albury Local Aboriginal Land Council (in respect of ALC 5608 or ALC 11797), prior to the commencement of any works – preferably in the planning stage.