Skip to main content

State Significant Infrastructure

Determination

Hunter Transmission Project

Cessnock City

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Development of a new double circuit 500 kV overhead transmission line between the proposed substations at Bayswater and Olney State Forest, and connections from these lines to the existing 500 kV transmission network. This project is declared CSSI.

Attachments & Resources

Notice of Exhibition (1)

Application (12)

SEARs (21)

EIS (36)

Response to Submissions (2)

Agency Advice (40)

Amendments (20)

Additional Information (11)

Determination (3)

Approved Documents

There are no post approval documents available

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Note: Only enforcements undertaken by the Department from March 2020 will be shown above.

Submissions

Filters
Showing 161 - 171 of 171 submissions
Name Withheld
Object
Lancefield , Victoria
Message
Energy Co are pathological liars!
Energy Co’s ‘CONsultation’ process is a farce—predatory, intimidating, and fake.
They don’t listen because they never intended to.
Name Withheld
Object
LEETON , New South Wales
Message
These transmission lines exist to benefit billionaire investors, not everyday Australians. They destroy the public good to enrich private empires.
Save Our Surroundings Lancefield
Object
Lancefield , Victoria
Message
Predatory Energy Co is putting Australia’s productive base under siege with these Energy Poverty plans.

With power prices skyrocketing and grid stability vanishing, manufacturing, mining, farming—our backbone industries—are being methodically destroyed.
Name Withheld
Object
Springfield , Queensland
Message
This is a fake green, rip-off solution for a fake green, vested interest manufactured crisis.

Building more transmission lines for unreliable "renewables" that don’t deliver power on demand is scientifically illiterate and strategically suicidal.
Name Withheld
Object
Redbank Plains , Queensland
Message
This CCP CONtrolling project would embed strategic vulnerabilities into Australia’s grid—turning energy from a national asset into a sabotaging national liability.
Save Our Surroundings Redbank Plains
Object
Redbank Plains , Queensland
Message
This totally unnecessary plan is Unjustified, Unwanted, UnAustralian!
There is no proven need for these transmission lines. They serve no public good—only the private interests of transnational parasites.
Name Withheld
Object
HAY , New South Wales
Message
Parasitic Energy Co’s Fake Green plans have no Australian benefit - bringing invasive weeds, biosecurity breaches, permanent scarring of prime agricultural land—ecocide under the banner of decarbonisation and major misery for the public.
Save Our Surroundings Swan Hill
Object
Swan Hill , New South Wales
Message
Energy Co is Destroying What Keeps the Lights On.
Reliable coal and nuclear would secure Australia’s future, but instead we get a dangerous fantasy of intermittent energy and subsidised grid failure for CCP benefit.
Name Withheld
Object
LEETON , New South Wales
Message
This project demands an immediate halt, a full forensic audit, and a Royal Commission into collusion, corruption, and foreign influence.
Name Withheld
Object
LAKE ALBERT , New South Wales
Message
Dodgy, deceitful Energy Co are planning a blueprint for Grid collapse!
Built on ideological fantasies for the CCP, they ignore all engineering fundamentals and are a disgrace to every principle of responsible energy planning and energy security.
Cessnock City Council
Comment
Cessnock , New South Wales
Message
Attachments

Pagination

Project Details

Application Number
SSI-70610456
EPBC ID Number
2024/09874
Assessment Type
State Significant Infrastructure
Development Type
Electricity supply
Local Government Areas
Cessnock City
Decision
Approved
Determination Date
Decider
Minister

Contact Planner

Name
Kurtis Wathen