Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Assessment
- Recommendation
- Determination
The modification seeks to:
• Increase the AC capacity from 43MWAC to 65MWAC;
• Increase DC capacity from ~52MWDC to ~75MWDC;
• Reduce the spacing between solar panel rows by 55cm from 5.50m to 4.95m