SSD Modifications
Determination
MOD 5 - Increase easement corridor
Blayney Shire
Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Assessment
- Recommendation
- Determination
Increase the maximum width of a section of the cleared easement corridor from 45m to 70m and minor realignment of the 132kV power line route.