SSD Modifications
Determination
Modification 4 Solar Farm Grid Connection
Carrathool Shire
Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Assessment
- Recommendation
- Determination
The modification seeks to enable excess power generated by the on-site solar farm to be exported to the grid and the removal of the proposed subdivision.