State Significant Infrastructure

Response to Submissions

Mount Piper to Wallerawang Transmission

Lithgow City

Current Status: Response to Submissions

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

EIS (15)

SEARs (22)

Agency Advice (18)

Notice of Exhibition (1)

Application (1)

Response to Submissions (1)

Development of a new 330kV transmission line between the Mount Piper 330kV/ 500 kV substation and Wallerawang 330kV substation

EPBC

This project is a controlled action under the Environment Protection and Biodiversity Conservation Act 1999 and will be assessed under the bilateral agreement between the NSW and Commonwealth Governments, or an accredited assessment process. For more information, refer to the Australian Government's website.

Attachments & Resources

Notice of Exhibition (1)

Application (1)

SEARs (22)

EIS (15)

Response to Submissions (1)

Agency Advice (18)

Submissions

Filters
Showing 21 - 40 of 53 submissions
Name Withheld
Object
Moulamein , New South Wales
Message
I strongly object based on biodiversity and habitat fragmentation. The corridor cuts through remnant bushland, fragmenting habitat for endangered and threatened species. Tall transmission infrastructure may create barriers, edge effects, and increased predation and invasion of weeds. Particularly vulnerable are aerial species (raptors, woodland birds) whose flight routes may be severed or made deadly. If proponent documents claim negligible impact, can they provide up‑to‑date species surveys, flight path intersection risk studies, and commitment to removing or rerouting if mortality incidence exceeds threshold?
Name Withheld
Object
Hay , New South Wales
Message
This plan has NO Accountability, just Greed.
These unelected bodies and their private partners operate with zero oversight, zero transparency, and zero care for the communities they steamroll—pure parasitism.
Name Withheld
Object
COONABARABRAN , New South Wales
Message
I object to these unreliable projects and all related infrastructure.
Name Withheld
Object
COONABARABRAN , New South Wales
Message
I object to this.
Name Withheld
Object
Hay , New South Wales
Message
Using China’s Slave Labour Supply Chain components for this unnecessary and unethical plan is shamefully unethical and wrong.

TransGrid’s use of ELECNOR, with deeply unethical procurement rooted in exploitative foreign labour, makes every tower a symbol of human misery and corruption.
Name Withheld
Object
Mendooran , New South Wales
Message
Put this junk in the backyards of the confused woke city fools who voted for this garbage. NOT rural in communities
Name Withheld
Object
Mendooran , New South Wales
Message
All renewable energy infrastructure is absolute destruction on our communities.
Save Our Surroundings Hay
Object
Hay , New South Wales
Message
Bulldozing breeding grounds for endangered species and precious biodiversity for unnecessary CCP controlled infrastructure exposes the grotesque hypocrisy of these "green" carpetbaggers.
It’s eco-vandalism with a sabotaging agenda
Name Withheld
Object
MOLLYAN , New South Wales
Message
I object to this.
Name Withheld
Object
BALGOWLAH , New South Wales
Message
I hereby object to this project.
Name Withheld
Object
Springfield , New South Wales
Message
This Regulator enabling plan is rotten to the core!
AEMO’s ISP is an intellectually bankrupt swindle —debunked, compromised, and dangerous.
It’s not fit for purpose, and its blind adoption of unreliable renewables is policy malpractice.
Name Withheld
Object
MOLLYAN , New South Wales
Message
I object to this unreliable project.
Name Withheld
Object
GRIFFITH , New South Wales
Message
This plan is a National Security Nightmare!
By handing critical infrastructure control to foreign-controlled supply chains and collapsing energy independence, this project fulfills China's Energy dream and weakens and sabotages Australia as a vassal state.
Save Our Surroundings Murrumbidgee
Object
Griffith , New South Wales
Message
This totally unnecessary, ruinous plan is Economic Suicide by Design.
It doesn’t just fail to help the economy—it will destroy jobs, cripple industry, bankrupt households, and fuel energy poverty across regional and urban Australia.
Name Withheld
Object
Kepnock , Queensland
Message
This is CCP Engineered Collapse of our Electricity Grid!
With no engineering rigour, no scientific justification, and no functioning economic model, this is a planned collapse of grid stability and energy self-sufficiency.
Name Withheld
Object
Harefield , New South Wales
Message
No Consent, No Social Licence, No Legitimacy!
This is a predatory bully bulldozing through NSW with zero social licence, ignoring public outrage, expert opposition, and basic democratic process—authoritarian dictators working for the CCP & the demise of Australia’s electricity grid.
Name Withheld
Object
KOORINGAL , New South Wales
Message
Disgraceful Greenwashing by crooked, predatory TransGrid - promulgating false climate narrative, using "renewables" as a smokescreen for industrial-scale land theft, ecosystem destruction, and wealth transfer to the CCP.
Save Our Surroundings Riverina
Object
Lake Albert , New South Wales
Message
This transmission project is an unforgivable betrayal—driven by foreign-compromised profiteers, destroying landscapes, defiling precious biodiversity, wrecking Intergenerational Equity and eroding every pillar of national sovereignty.
Name Withheld
Object
Gannawarra , Victoria
Message
I object on hydrological and water quality grounds. The proposed route intersects numerous creeks, mountain streams, and drainage gullies. Construction will necessitate clearing, earthworks, excavations for tower footings and access roads—all of which increase erosion and sediment load downstream. These waters feed into larger catchments used by communities and ecosystems. In heavy rain, disturbed soils will wash into rivers, degrading habitat, smothering aquatic species and harming water quality. If the proponent claims they will fully mitigate such impacts, what enforceable guarantee and monitoring regime will they adopt (with third‑party oversight) to ensure no net harm to downstream water systems?
Name Withheld
Object
Barham , New South Wales
Message
I oppose this transmission line on fire‑safety grounds. The alignment rises upslope, exposing conductors and towers to higher wind, lightning and vegetation stress, increasing the risk of sparks or component failure. In a wildfire scenario, aerial suppression is critical—yet safety zones around lines may prevent aircraft from operating close to the fire front. Ground crews are disadvantaged in steep terrain. The potential for the line itself to initiate or worsen a fire is unacceptable. If declarations that risk is “low” are made, can the proponent supply worst‑case scenario modelling of line‑initiated fire in steep terrain including loss estimates for fauna, flora, property and human life?

Pagination

Project Details

Application Number
SSI-70279722
EPBC ID Number
2024/09855
Assessment Type
State Significant Infrastructure
Development Type
Electricity supply
Local Government Areas
Lithgow City

Contact Planner

Name
Erin Matarazzo