SSD Modifications
Determination
Roberts Road DC MOD 3 - High-Voltage Plant Modification
Blacktown
Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Assessment
- Recommendation
- Determination
– Installation of a new switch room with 11 kV switchgear
– Installation of a new (fifth) Transformer
– Replacement of the existing Transformer 1 and 2.