I am writing to object to your proposed plans for Gundary Plains solar farm. I feel what you are planning to do is wrong and not considering the people this is going to affect. I have a daughter and her partner who live in Gundary where this work is going to happen, they left a busy lifestyle for a quiet life and in doing so, they are now enjoying the beauty of Gundary and its wildlife, which also will be affected by your proposed plans. I know the community there have put forward their objections but don’t appear to be being heard.
Why do big corporations feel they can use their power to override what the community of Gundary DONT WANT. These solar farms have been proven to not be reliable, they also can’t beat the force of Mother Nature, let’s not forget the cost, only to have it destroyed.
Let the people of Gundary enjoy the beauty that Gundary has to offer, there are some whose livelihoods will be affected by this proposed move. Far too many lives and animals lives have been destroyed by the destruction of this planet by large corporations. For once don’t let money and power be the driving force of this decision, let the community of Gundary enjoy what they have worked hard for, let them continue to look out their windows at the beautiful landscape, that I myself have enjoyed and not some monstrosity of a solar farm.
Please hear what the community wants in regards to the solar farm and their reasons behind NOT wanting it to go ahead.
Thank you
Charmaine Swaddle
47/1 Tilbury Rise
Upper Coomera 4209
Queensland
Jason Crisp
Object
GUNDARY , New South Wales
Message
To Whom it May Concern,
Please find my mothers and my submission attached. This project needs to be looked at closely as it will not create local jobs lets be honest all the crews come with the contractor and only the big local contractors will get a piece of the pie. It is a major fire threat and a down grade to local people who have lived in the beautiful area for many years.
Attachments
Cliff Fenner
Object
Gundary , New South Wales
Message
I Strongly Oppose the Development.
Please see attachment
I Can and will provide supporting documentation if required.
Attachments
Name Withheld
Object
LAKE ALBERT , New South Wales
Message
Continued ->
*The Full Life-Cycle Embedded Energy & all Emissions is required to be factually documented - from mining materials, processing, manufacturing, transportation, road works, construction, operation, recycling & waste disposal including all components used for all parts of the plan - Solar EG Works, BESS, Substation, Transmission Lines, etc.

Coal’s Importance For Solar Panel Manufacturing – Watts Up With That?
https://wattsupwiththat.com/2024/05/23/coals-importance-for-solar-panel-manufacturing/

*Accurately Document the Most Potent Greenhouse Gas of all - SF6 Emissions from the full life-cycle of Industrialised Solar, BESS, Switch Gear, Circuit Breakers, etc.
Climate change: Electrical industry's 'dirty secret' boosts warming - BBC News
https://www.bbc.com/news/science-environment-49567197

*Upfront Decommissioning/Remediation Bond & Clean-Up Bond is required to cover full costs (updated in real time)of independently calculated amount with full explanation & identification of where it will be securely held.
Engineer certified, full explanation of all practical actions required to guarantee immediate clean-up after Fires, Storm/Hail Damage, Degradation, etc. & return of the site to its uncontaminated, inherent, food producing capability, including identifying immediately present supplies of substances required to coat broken panels prior to removal, ready access to recycling & toxic waste capability & capacity - apart from local Council.

*Transparently confirm the plan to Indemnify Neighbours - due to inability of neighbours to acquire adequate Public Liability Insurance because of this Hazardous ‘Renewable’ Industry invading & burdening the rural food growing area.

*Confirm with evidence the Developer’s Adherence to the Commonwealth Modern Slavery Act so NO Components - including Solar Panels & Cobalt for BESS are sourced from cruelly tortured Slave Labour Supply Chains.

NEW MODERN SLAVERY CONDITION- requiring proof prior to construction that NO Slave Labour supply chain components be used in construction.
New Condition Inserted C4A - Dealing With Modern Slavery.
Commonwealth Modern Slavery Act 2018
*NSW Local Council Act 1993
428 Annual Report
438 ZE Duty to Ensure Goods & Services Are Not Procured From Modern Slavery.

*Prove Adherence to Paris Agreement - Taking over farmland to build facilities to produce intermittent energy is a violation of Article 2, Section 1(b) of the Paris Agreement (2015).
Article 2 1(b) of the 2015 Paris Agreement states:
“This Agreement... aims to strengthen the global response to the threat of climate change, in the context of sustainable development and efforts to eradicate poverty, including by:
“(b) Increasing the ability to adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse gas emissions development, in a manner that does not threaten food production”; See: https://unfccc.int/files/essential_background/convention/application/pdf/ english_paris_agreement.pdf .

*Factually Addressing & Assessing the Serious/Irreversible Health Risks & Impacts to Human Beings & Stock from Solar’s Numerous Heavy Metals including Lead + PFOS & BESS PFAS Contamination.
Including Emotional/Mental Health impacts for traumatised communities devastated by such destructive plans affecting their livelihoods.
Also, proper, independent analysis of the ongoing Noise Nuisance caused by BESS.

*Livestock Production Assurance Program Clarification is required for grazing Stock on Solar/Wind sites:-

The particular question is 2.8 of the "Food Safety on Your Property" section.

*”Do livestock have access to leaking electrical transformers, capacitors, hydraulic equipment, solar panels, wind turbines, coal seam gas structures or coal mine wastes?"*

- Yes
- No
- I am now aware and making plans to restrict access

https://www.facebook.com/groups/2147446775628698/posts/2222816628091712/ https://m.facebook.com/story.php?story_fbid=2222816628091712&id=2147446775628698

*Factually outline the Engineering Facts of how this plan meets all Aspects Equally of the National Electricity Law Objective:-
The objective of the National Electricity Law is to promote efficient investment in, & efficient operation and use of, electricity services for the long term interests of consumers with respect to:-
(a) price, quality, safety, reliability and security of supply of electricity;
and
(b) the reliability, safety and security of the national electricity system;
and
(c) the achievement of targets set by a participating jurisdiction
(i) for reducing Australia’s greenhouse gas emissions; or
(ii)that are likely to contribute to reducing Australia’s greenhouse gas emissions.

AEMO, and everyone in 'authority', place primacy on the emissions target rather than the other requirements of the NEL.
The emissions requirement was only added to the NEL in Sep 2023, with States tardy to legislate any targets, so on what basis did any Gov act prior to that to impose all this on us? Yet they all did, and still emphasise emissions over other objectives.
NEL is made in the SA Parliament, and in the 2nd reading, the minister there also reiterated that ALL OBJECTIVES ARE EQUAL.

As we have clearly seen proven at Broken Hill recently “Wind and Solar are worse than useless in a crisis like this, because it’s detrimental to having a consistent power supply,” Mayor Tom Kennedy said.
“I’d hate to see what happens in the capital cities in a similar crisis.”
https://joannenova.com.au/2024/10/650m-in-renewable-energy-didnt-save-broken-hill-from-days-of-blackouts-after-a-storm-islanded-it/

*Independent, expert clarification of the average Capacity Factor of Industrialised Solar & capability of the BESS is required in order to satisfy the Developer’s claim of supplying reliable energy to power the designated number of households stated.

*Provide a thorough, independent analysis of GENUINE SOCIAL LICENCE (including all Rural Australians) for entombing our limited, irreplaceable Prime Agricultural Land in Industrialised Solar
Community Impact Survey: April-May 2024 – Property Rights Australia
https://propertyrightsaustralia.org.au/community-impact-survey-april-may-2024/

*Abide by Australian and International Environmental Standards:-
AS/NZS ISO/IEC 17021.2:2013 [ISO/IEC TS 17021-2 :2012] Conformity assessment - Requirements for bodies providing audit and certification of management systems. Part 2: Competence requirements for auditing and certification of environmental management systems

AS/NZS ISO/IEC 17021.2:2013 Clause 6.7 regarding Use of Space/Physical Attributes (Clause 6.7)
Requires knowledge of:
a. the interactions of the physical attributes (size, shape and colour) of buildings, structures and equipment with the local environment (eg, man-made structures that detract from natural ambience, nature, flora and fauna, and natural settings of the environment in which they have been placed);
b. Operational controls and techniques to manage physical attributes, such as planning and design, landscaping, use of colour to reduce intrusive impact on the environment; and
c. the monitoring of spatial planning, building and equipment requirements as well as maintenance systems and landscaping.

*Biodiversity Offsets are a damaging environmental scam - becoming a trading market with no successful outcomes.
We need real transparency & demonstrative environmental benefits. The proponent can not be allowed to self-refer at any Government level.
https://www.crikey.com.au/2023/05/18/biodiversity-offsets-scheme-crisis/
Biodiversity offsets

*Address National Security Risks - including a Comprehensive Audit Determining Who is Subject to the CCP’s National Intelligence Law - regarding Foreign Ownership of Critical Energy Infrastructure
There are no secure measures currently in place to prevent malicious actors from using Solar Inverters to disrupt the Solar Electricity Grid.
https://www.senatorpaterson.com.au/news/chinas-spy-threat-to-energy-supplies

Communist China is setting us up for Solar Panel-Based Disaster: https://x.com/JunkScience/status/1824460766918926744

Beautifully Hackable - Irina Slav on Energy - 12/8/24
https://irinaslav.substack.com/p/beautifully-hackable?utm_campaign=email-post&utm_source=substack

In July, Transgrid struck a deal with China’s ZTT International for the delivery of more than 17,500 kilometres of high-voltage conductors to get ahead on HumeLink and VNI West." 4th Dec 2023
https://reneweconomy.com.au/transgrid-hands-out-multi-billion-dollar-contracts-for-controversial-humelink-build/m

*Include Accurate Independent Analysis & Truthful Comparison of all Sources of Power for Reliability, Security, Affordability, Emissions, Toxic Waste Reduction & Minimal Environmental Footprint.

Can We Trust the Energy Transition?
https://www.youtube.com/watch?v=T5j6FVAumlE

The 'Sunk Cost' Trickery That Makes Renewables Seem Cheaper Than They Are - 23rd July 2023.
https://www.fresheconomicthinking.com/p/the-sunk-cost-trickery-that-makes?utm_medium=web

Energy Transition Masquerade: The $360 Billion You Pay - YouTube
https://www.youtube.com/watch?v=x0NKDozvO58

Nuclear VS Renewables: What Will It Cost? | Zoe Hiltonhttps://www.youtube.com/watch?v=Mw_AX9WaJ08

*Include the Proponent’s & Consultant’s Commitment to Integrity & Ethical Behaviour & their Knowledge of the Legal Consequences for any lies or deceit - ie. “confection ….. made up evidence - so lacking in integrity that no weight can be placed on it.”
Name Withheld
Object
LAKE ALBERT , New South Wales
Message
Lightsourcebp’s hazardous, ECOCIDAL Gundary Solar Electricity Generating Works + BESS industrial plan is unsuitable to be proposed on 702 ha of Productive Agricultural Land on the iconic & precious Gundary Plains.

*Being a toxic contaminating plan with no upfront Decommissioning/Remediation Bond or an Operational Bond to ensure the complete Clean-Up from sudden Storm or Fire🔥events during its decades of existence is a Public Health & Safety disaster that would render this food producing site & surrounding land & water irreversibly contaminated forever & obviously completely inappropriate for grazing sheep.
Despite Lightsourcebp’s irresponsible claims, according to Livestock Production Accreditation requirements, livestock must be restricted from ‘leaking Solar Panels.’

Additionally, the recent Australian Drinking Water Guidelines Draft has highlighted PFOS as a toxic contaminant - PFOS (Perfluorooctane Sulfonate or Perfluorooctane Sulfonic Acid) is found in Solar Panels - 740,740 of them - rendering this a disastrous scenario for Sydney’s Drinking Water Catchment - which includes this site.

‘NHMRC has drafted an update of the PFAS Fact Sheet within the Guidelines that includes revised and newly established health-based guideline values. The draft PFAS fact sheet is supported by a NHMRC Statement on PFAS in drinking water, which provides a summary of the findings that informed the update.  
The PFAS reviewed as part of this update include perfluorooctanoic acid (PFOA); perfluorooctane sulfonic acid (PFOS); perfluorohexane sulfonic acid (PFHxS); perfluorobutane sulfonic acid (PFBS) and hexafluoropropylene oxide dimer acid and its ammonium salt (GenX chemicals).’
Further information on the NHMRC Review of PFAS in Australian drinking water is available on the NHMRC website.

The World Health Organization now lists two PFAS as carcinogens or possible carcinogens: perfluorooctanoic acid (PFOA) as a Group 1 carcinogen and perfluorooctanesulfonic acid (PFOS) as a Group 2B carcinogen.

A range of PFAS is also subject to the Stockholm Convention for the protection of human health and the environment from persistent organic pollutants (POPs) (ie, PFOS, PFHxS, PFOA and potentially all long chain perfluoroalkyl carboxylic acids). 

Some types have been found to be toxic to human health and the environment.
In its most definitive regulatory action taken to date, the Commonwealth has effectively banned the import, use and manufacture of some of the more prominent types of PFAS (PFOS, PFOA and PFHxS) from 1 July 2025. (21 Feb 2024)

Impact of PFAS on Human Health
https://insightplus.mja.com.au/2024/46/more-funding-needed-to-investigate-impact-of-pfas-on-human-health/

Lithium-ion Battery Energy Storage Systems are also a PFAS Contaminant.

’Forever chemicals’ used in lithium ion batteries threaten environment, research finds | Lithium-ion batteries | The Guardian 14/7/24
https://www.theguardian.com/technology/article/2024/jul/14/forever-chemicals-

*How will Lightsourcebp eliminate this inevitable & extensive Public Health & Safety Disaster?
Where is Lightsourcebp’s reputable, independent, peer reviewed research to prove the ‘Health & Safety’ of their infrastructure midst food production & water courses - the impacts for human beings, animals & biodiversity from the industrialised, Solar Electricity Generating Works’ components - including the Toxicity Ratings of their Solar panels, Inverters, Batteries & Galvanised posts, etc.

*Please provide a comprehensive list of all molecular compounds/chemical elements contained in the Gundary Solar panels (including all of the components which make up the panel,) so this can be reviewed & confirmed by independent scientists.
That is, the atoms and molecules involved in the electrical components, the film, the silicon cells, the frame, etc. of these PV Solar panels & all else that will be used, including BESS components.

*Inclusion of Engineering Facts, Scientific Rigour, Integrity & Ethics for Assessment & Determinations is required NOT just trusting the Developer & Ideologically Biased Approving Bureaucrats with Vested Interests.
It is ESSENTIAL to include all of the following to be determined by REPUTABLE, PEER REVIEWED INDEPENDENT EXPERT EVIDENCE NOT the DODGY DEVELOPER.

*Determination of all Public Health & Safety Risks to Human Beings/Ecology/Ecosystems including:-
Electrical Force & Electromagnetic Radiation,
Numerous Toxic Heavy Metals including Lead leaching from Solar Panels & PFOS as they degrade, if inferior, broken/damaged, fractured by hail or burnt & filthy, Fire hazardous BESS PFAS Contamination.
Include cumulative ‘renewable’ contamination impacts which will likely infiltrate the water table and local river systems, jeopardising both our quality of life and broader water infrastructure.

Leaching Via Weak Spots in Solar Panels
https://www.researchgate.net/publication/348883160_Leaching_via_Weak_Spots_in_Photovoltaic_Modules
“Our long-term experiments clearly demonstrate that it is possible to leach out all, or at least a large amount, of the (toxic) elements from the photovoltaic modules. It is therefore not sufficient to carry out experiments just over 24 h and to conclude on the stability and environmental impact of photovoltaic modules.”

Solar Realities - Physicist John Droz jr
https://election-integrity.info/Energy/Solar_Energy_Concerns.pdf
We know that these are some of the toxic (some carcinogenic) chemicals that have been identified as likely being in solar panels (click on the links to get an idea of what some of the adverse health consequences are):
Per- and Polyfluoroalkyl Substances (PFAs)
Perfluorooctane sulphonate (PFOS)
Polytetrafluoroethylene (PTFE)
Fluorinated Ethylene (FEP)
Cadmium Telluride
Copper Indium Selenide Cadmium Gallium diselenide Copper Indium Gallium diselenide Silicon Tetrachloride Hexafluoroethane
Polyvinyl Fluoride
Also, here is a basic explanation of the silicon manufacturing part of solar panels. The following are some additional toxic chemicals that have been identified as possibly being involved in the fabrication of solar panels, which might end up in the finished product:
Hydrogen chloride
Silicon tetrachloride
Hydrochloric acid
Sulfuric acid
Nitric acid
Sulfuric acid
Polycyclic aromatic hydrocarbons Formaldehyde
Arsine gas
Trichlorosilane gas
Silane gas
Sulfur dioxide
Sulfur hexafluoride
Sodium hydroxide
Potassium hydroxide
Lead

Contamination from Industrialised Solar’s Galvanised Steel Supports
https://www.facebook.com/share/p/srbXaCbKgVXocgsm/?mibextid=xfxF2i
James Falcsik White County Indiana Residents Against Solar
21 h

Unmasking the Toxic Truth - The Solar Panel Waste Story
https://youtu.be/_Ck2dHflJ3s?si=0WS5CYhuCb6hNvP0

*Factual Assessment of Increased🔥FIRE Risks is required, including evidence from the local Volunteer Fire Fighters, all landowners in the area, Rural Fire Fighting Pilots & Medical Experts.

Solar Inverter "Burst into Flames:" Fire Injures Worker at South Australia Solar Farm | RenewEconomy - 10th Jan 2024
https://reneweconomy.com.au/inverter-burst-into-flames-investigations-underway-into-fire-at-south-australia-solar-farm/

Safety of Grid Scale Lithium-ion Battery Energy Storage Systems
“The scale of Li-ion BESS energy storage envisioned at “mega scale” energy farms is unprecedented and requires urgent review. The explosion potential and the lack of engineering standards to prevent thermal runaway may put control of “battery fires” beyond the knowledge, experience and capabilities of local Fire and Rescue Services.
BESS present special hazards to fire-fighters….”
https://www.researchgate.net/publication/352158070_Safety_of_Grid_Scale_Lithium-ion_Battery_Energy_Storage_Systems

Grid Scale Batteries & Fire Risk
https://static1.squarespace.com/static/656f411497ae14084ad8d03a/t/66fd2383b56dbc6906390297/1727865736681/Fannon-Batteries.pdf

Bouldercombe Battery🔥Fire sparks warning for residents in regional Queensland - 26/09/23
https://www.9news.com.au/national/bouldercombe-battery-fire-sparks-warning-for-residents-in-regional-queensland/b4b3058a-cb0b-4209-a02d-6b12d80c63ac

Gateway Energy Storage System🔥Fire: Otay Mesa, CA - YouTube
https://www.youtube.com/watch?v=A7UY4ioP4VQ

Add yet another Lithium Battery🔥FIRE - this one in Scotland - Lithium Battery Recycling Centre.
https://youtu.be/d-hvsz2tyhc?si=S16_g1LWETu1pj70.

*Confirm the Developer’s Guarantee to Ensure Clean Drinking Water & No Environmental Contamination as “We have a human right to clean drinking water and an environment free of toxic load,” Dr Stops said. “Dr Orellana reminded us that Australia has ratified the Stockholm Convention on Persistent Organic Pollutants (POPs) in 2004

*Confirm the Developer's Adherence to Amended Condition C8.
Prior to Commencement of Any Works - Storm Water Management Plan.
On Site & Discharge From the Site.
Testing Points & Regular Water Samples, Suitably Qualified Person.
Written Response Procedures if CONTAMINATION is Found - required PRIOR to CONSTRUCTION.
Availability of Results.

Sediment Run-Off Contaminating Land/Water - Court Case -
“Created, Operated, and Maintained a Nuisance”
Solar farm runoff pollutes property, couple awarded $135 million - CFACT
https://www.cfact.org/2023/06/06/solar-farm-runoff-pollutes-property-couple-awarded-135-million/
By Bonner Cohen, Ph. D. |June 6th, 2023
25th Oct 2023 update …A federal judge has dramatically reduced a jury’s $135 million award to a Georgia couple (https://www.ajc.com/news/couple-awarded-135m-after-solar-project-turns-their-lake-to-mud-hole/BZ6BYXQREJCDROQV6ZASUW5WOI/

Continued ->
Ann Moore
Object
GUNDARY , New South Wales
Message
At 8.1.2 of the EIS (Suitability of the Site), LightSource BP (LSBP) states:

“In preliminary phases of the Project, Lightsource bp undertook a site constraints and opportunities analysis to identify the most appropriate site.”

That report cannot be located in the EIS which means that persons with an interest in the proposal have not had an opportunity to respond to it.

In the interests of full transparency, and to ensure LSBP’s compliance with the mandatory considerations in the SEPP, we believe that this report should be publicly available.

LSBP should be instructed to provide a copy of that document, or any documents forming part of the ‘analysis’, to the Dept. of Planning and the Environment and the impacted residents.

Should that document/s refer to matters that are commercial in confidence. the analysis could be provided with any redactions that are appropriate to protect the commercial interests of LSBP.

LSBP cannot rely on a document that the impacted residents and the Dept. of Planning and the Environment cannot access.

Ann Moore