DA Exhibitions
Under Consideration
Rosedale Residential Subdivision Concept Plan - Modification 2 (MP05_0199 MOD 2)
Eurobodalla
- Exclude “Stage 1” (already developed) from the site and scope of modified Concept Plan)
- Change in property title format from Community Title to Torrens Title for the remainder of the Concept Plan residential estate
- Redesign of the proposed subdivision layout to:
- Reduce the developable area from 128.59Ha to 109.46Ha
- Reduce extent of civil works, and delete lots backing on the western fringe of the modified Concept site boundary
- Reduce the road hierarchy from 17 road classifications (plus lanes) to 5 road typologies
- Increase the number of vehicle access points to George Bass Drive to the estate from 2 to 3
- Connect the Estate to Saltwood Drive and Stage 1
- Reduce “land use zones” from 6 to 5
- Relocate the mixed-use/commercial precinct to the eastern portion of Stage 3 (and will be subject to further design detail to be lodged in a later DA)
- Reduce the minimum dwelling density to 1 dwelling/100m2 in the Centre Zone
- Increase number of lots and size of The Commercial/aka Centre Zone
- Increase the maximum lot size but decrease the number of lots of The General/Suburban Zone
- Increase the maximum lot size and increase the number of lots of The Suburban Zone
- Increase the lot size but decrease the number of lots of The Park Edge Zone
- Increase the number of lots and size of lots in The Outlook Zone
- Propose Park Edge Zone to northern part of the site (eastern and southern perimeters, and northeastern pocket)
- Replace Ecological Protection lots with open space and retained managed land
- Remove (and offset) an existing first order stream (Stream 1B) in the northern precinct
- Replace the 1st order stream (Stream 1D) with a detention basin adjoining Stage 1
- Delete the proposed “community buildings”, situated close to the Bevian Wetland
- Delete the Statement of Commitments
The original Concept Plan and past modification can be viewed here .
Application documents
Application documents
- Modification Report Part One MP05_0199_MOD_2
- APPENDIX R-2 - Details and Levels Survey
- APPENDIX S - Geotech Report
- APPENDIX T - Flood Impact Report
- APPENDIX U - Proponent’s responses to ESC Issues 27 May 2024
- APPENDIX V - Heritage Impact Addendum Report (May 24)
- APPENDIX W-1 - Acid Sulfate Soils Review
- APPENDIX W-2 -Soil & Contamination Report
- APPENDIX X - Civil Engineering and Water Cycle Management Plan
- APPENDIX Y - Water and WasteWater Servicing Report
- APPENDIX Z - Riparian and Aquatic Assessment
- APPENDIX R-1 - Arborists Report
- APPENDIX L - Integrated Water Management Plan
- APPENDIX M - Aboriginal Cultural Heritage Assessment Report
- APPENDIX N - Infrastructure Delivery & Staging Plan Report
- APPENDIX O - Traffic Impact Assessment
- APPENDIX P - Civil Design Plans
- APPENDIX Q - Landscape Design Report Part 1 of 4
- APPENDIX Q - Landscape Design Report Part 2 of 4
- APPENDIX Q - Landscape Design Report Part 3 of 4
- APPENDIX Q - Landscape Design Report Part 4 of 4
- APPENDIX A - Instrument of Approval - 2008 Concept Plan
- APPENDIX B - Approved Plans
- APPENDIX C - SEARS
- APPENDIX D - Compliance with EPIs
- APPENDIX E - Compliance with SEARs
- APPENDIX F - EDC Report_Rosedale
- APPENDIX G - Modified Instrument
- APPENDIX H - Bushfire Assessment Report
- APPENDIX I - BDAR & Credit Summary
- APPENDIX J - Modified Plans
- APPENDIX K - Detailed Site Investigation
- APPENDIX AA - Noise & Vibration Impact Assessment
- 75W Application Form_Redacted
Exhibition notice
Exhibition notice
Agency advice and submissions
Agency advice and submissions
- MP 05_0199 MOD 2 Public Submissions - Combined
- Eurobodalla Shire Council Submission
- Crown Lands Advice
- DCCEEW Water Group Advice
- DPI Agriculture Advice
- DPI Fisheries Advice
- EPA Advice
- NPWS - No comment
- NSW Health - No comment
- RFS Advice
- School Infrastructure NSW - No comment
- TfNSW Advice
- Heritage NSW Advice
- Heritage NSW ACH Advice
- BCS Advice
Response to Submissions
Response to Submissions
- Response to Submissions Report
- Appendix 1 - Open Space Analysis
- Appendix 2 - Response to Issues Matrix
- Appendix 3 - Appendix F - Biodiversity Credit Report
- Appendix 3 - BAM Credit Summary Reports
- Appendix 3 - Biodiversity Credit Report
- Appendix 3 - Credit Summary Report
- Appendix 3 - Revised Biodiversity Development Assessment Report
- Appendix 4 - Revised Flood Impact and Risk Assessment
- Appendix 5 - Concept Subdivision Plan
- Appendix 5 - Constraints Map
- Appendix 5 - Constraints Map 2
- Appendix 5 - Developable Area Diagram
- Appendix 5 - Landscape Masterplan
- Appendix 5 - Modified Site Base Plan
- Appendix 5 - Road Hierarchy Plan
- Appendix 5 - Staging Plan
- Appendix 6 - Integrated Water Management
- Appendix 7 - Updated Bushfire Report
- Appendix 8 - Revised Civil Design Plans Part 1of 2
- Appendix 8 - Revised Civil Design Plans Part 2 of 2
- Appendix 8 - Revised Civil Design Report Part 1 of 2
- Appendix 8 - Revised Civil Design Report Part 2 of 2
- Appendix 9 - Revised Traffic Impact Assessment
- Appendix 10 - Revised Aboriginal Cultural Heritage Assessment Report
- Appendix 11 - Riparian and Aquatic Assessment
Project Details
Portal reference number
MP05_0199-Mod-2
Property Address
George Bass Drive
Type of application
Modification Application
Type of development
Part 3A Mod
Exhibition start - end date
-
Determining authority
Consent Authority
Consent authority name
Minister for Planning and Public Spaces