Apsley BESS MOD 1 - Increase in BESS capacity

Dubbo Regional

Current Status: Assessment

Interact with the stages for their names

  1. Prepare Mod Report
  2. Exhibition
  3. Collate Submissions
  4. Response to Submissions
  5. Assessment
  6. Recommendation
  7. Determination

Increase in BESS capacity, increase in construction period including workers and water requirements, increase in vehicle movements including OSOM and amendments to the development footprint and site access.

Attachments & Resources

Modification Application (12)

Response to Submissions (4)

Agency Advice (13)

Submissions

Filters
Showing 1 - 4 of 4 submissions
Daniel Mendes
Support
Chatswood , New South Wales
Message
I support the project
Michael Burrough
Object
APSLEY , New South Wales
Message
Submission – Objection
Apsley Battery Energy Storage System – Modification 1
Attachments
Susan Brown
Object
APSLEY , New South Wales
Message
This runoff from this project will feed into 4 stock water dams on our property, which then flows into the Bell River. There is a potential for water contamination for livestock produced on ‘Peppertree’ property which is directly adjacent and lower typographically to the BESS. This threat is also existent for the Bell River.
This project is also located on the acquirer from which we source stock and domestic water during dry periods when our dams dry up. Any deep digging to establish foundations could disrupt this acquifier which has been supplying water since Cobb and Co coach days.
24/7 running of the project means constant noise associated with this project. This constant noise will affect an existing medical condition which could be life threatening.
The entrance to the project is located just over a blind crest in the road coming from a southerly direction which potentially could cause a road accident.
This BESS is located in a pristine agricultural part of Wellington which has no other solar or wind farm infrastructure, hence its negative aesthetic impact will be enhanced. It is also located more than 10 km from existing solar farms making it less effective.
This project is located in proximity to the Wellington Caves; the extent of which has not yet been established so could be over cave cavities.
The runoff water from the dam located in close proximity to the east of the project will impact the project during periods of heavy downpour. Any diversion works to protect the BESS would be diverted through our property, potentially causing severe erosion.
Photos attached show the extent of potential runoff water during a period of heavy rainfall.
Attachments
DUBBO REGIONAL COUNCIL
Comment
DUBBO , New South Wales
Message
Attachments

Pagination

Project Details

Application Number
SSD-35160796-Mod-1
Main Project
SSD-35160796
Assessment Type
SSD Modifications
Development Type
Electricity supply
Local Government Areas
Dubbo Regional

Contact Planner

Name
Kate Tierney