SSD Modifications
Determination
Culcairn Solar Farm MOD 2: BESS size increase
Greater Hume Shire
Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Assessment
- Recommendation
- Determination
Increase capacity of the approved battery energy storage system to 350 MW / 800 MWh.