State Significant Development
Daring Square - South West Plot Development
City of Sydney
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Archive
Application (2)
DGRs (1)
EIS (99)
Submissions (14)
Response to Submissions (45)
Recommendation (2)
Determination (5)
Approved Documents
There are no post approval documents available
Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
Fire Safety Order issued to 53 Tumbalong Boulevard, Haymarket (SSD 6011) Sydney LGA
On 27 January 2022, the Department issued a Fire Safety Order to the owners of 53 Tumbalong Boulevard, Haymarket, to remove identified external wall panels on the building consisting of Aluminium Composite Panels (ACP). ACP is combustible and poses a fire safety risk. The owners are required to replace the ACP with a non-combustible product and provide an inspection report issued by an accredited certifier, certifying that the replacement panels and method of installation comply with the Building Code of Australia. The owners are required to develop and implement fire safety measures to reduce the fire safety risks associated with the cladding until the rectification work is complete.
Inspections
There are no inspections for this project.
Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.