Eastern Creek Data Centre - Mod 2 - Power consumption increase

Blacktown

Current Status: Determination

Interact with the stages for their names

  1. Prepare Mod Report
  2. Assessment
  3. Recommendation
  4. Determination

The modification seeks approval for an increase in the overall power consumption of the development (to 70.2 megawatts), along with corresponding plant and equipment changes (including additional back-up generators).