Current Status: More Information Required
Interact with the stages for their names
- Prepare Mod Report
- Assessment
- Recommendation
- Determination
Want to stay updated on this project?
The modification seeks approval for an increase in the overall power consumption of the development (to 70.2 megawatts), along with corresponding plant and equipment changes (including additional back-up generators).