Eastern Creek Data Centre - Mod 2 - Power consumption increase
Blacktown
Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Assessment
- Recommendation
- Determination
The modification seeks approval for an increase in the overall power consumption of the development (to 70.2 megawatts), along with corresponding plant and equipment changes (including additional back-up generators).