MOD 1 - Coal Transport

Wollongong City

Current Status: Response to Submissions

Interact with the stages for their names

  1. Prepare Mod Report
  2. Exhibition
  3. Collate Submissions
  4. Response to Submissions
  5. Assessment
  6. Recommendation
  7. Determination

Transport of coal between Port Kembla Coal Terminal and Dendrobium Coal Preparation Plant via private roads

Attachments & Resources

Notice of Exhibition (4)

Modification Application (2)

Response to Submissions (1)

Agency Advice (3)

Submissions

Filters
Showing 1 - 7 of 7 submissions
National Parks Association of NSW
Object
Campbelltown , New South Wales
Message
Attachments
Philip Laird
Comment
Wollongong , New South Wales
Message
Attachments
Name Withheld
Object
BULLI , New South Wales
Message
Firstly, I object to any expansion of Coal Mining & associated processing given that NSW and Australia has Greenhouse Gas Emission reduction plans that are completely contrary to any expansion enabling more Coal mining production.
Secondly, I note that the application document titled "RVC Coal Transport MOD - Modification Report_signed" in section 7 claims there will be "no change to the current processing capacity of the Dendrobium
CPP, current rate of coal wash production or coal wash transport routes." I note that the application to modify & allow new route of Coal Wash from Russel Vale colliery to follow pre-existing route of Coal Wash from other origins as per the Figure 3 in same document. This makes me think there will be an increase in Road Transporation above current levels of Coal Wash to West Cliff near Appin. I understand the volumes may be within pre-approved limits, but this modification focusses on the Coal Wash from Russel Vale Coal mine & should be assessed as having significant impact to Transport Volumes on these Public Roads. This would bring into question increases in quoted Scope 3 GHG emissions & increased risk of Road Safety issues en route to Appin & return. I could not find clear reference to these factors.

Lastly, I was disappointed in the letter email to me about this Notice of Exhibition has 3 links to the related applications. Two of the 3 links went to webpages "not found". This made it harder to view the application within the short exhibition time frame, also being a busy time of year in early December. I believe the links should be corrected before the exhibition period commences.
Illawarra Residents for Responsible Mining Inc
Comment
CORRIMAL , New South Wales
Message
Please see submission attached.
Attachments
Name Withheld
Object
THIRROUL , New South Wales
Message
At a time when we need to drastically reduce our coal use, no mine should have any of their operations expanded. This is in the interest of the whole community on health, safety, environmental and economic grounds.
Protect Our Water Alliance
Comment
WOLLONGONG , New South Wales
Message
Should the modification be approved, additional conditions should be made to improve the project.
Attachments
Wollongong City Council
Comment
,
Message
Attachments

Pagination

Project Details

Application Number
MP09_0013-Mod-1
Main Project
MP09_0013
Assessment Type
SSD Modifications
Development Type
Coal Mining
Local Government Areas
Wollongong City

Contact Planner

Name
Polina Golberg