SSD Modifications
Determination
MOD 2 - Amendment to Stormwater Treatment Device
Fairfield City
Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Assessment
- Recommendation
- Determination
Replace the 30, 000 L sediment basin and bioretention basin in the southwest corner of the site with an inground pit and sand filter located under the hardstand on the lower level of the site.