"I object to the the T4 proposal. I find it a retrograde action that is cowardly and lazy - one that perpetuates old fashioned methods of producing energy both her and overseas when new sustainable methods are available. Reducing our and other nations dependence on coal is critical for us as Australians - by starting on this path we only than start to become a truly a modern nation.

Continued burning of coal to produce energy will contributes to global warming - Australia needs to say no!

A coal terminal in the Hunter will affect the Hunter Estuary and with it wipe out essential habitat for migratory birds who will have nowhere else to go.

Using public conservation land to build any project especially such an obnoxious one is highly objectionable. Public conservation land is held in trust by the government and just because it is populated by trees and other species does not make it available for destruction.

I am sure that it will be argued that the project will benefit the local community - the figures seem to contradict this. And it will only be short term if it does benefit at all. I would propose that the investment that is being made to build this terminal be redirected into developing sustainable growth models.

Be modern - think outside the square"
George Carrard
Object
Oatley , New South Wales
Message
"Australia should convert to fossil-fuel-free economy as a matter of urgency.

Failure to do so is being an accessory to the murder of our grandchildren.

There is overwhelming evidence that emissions from the burning of fossil fuels including coal over the last 200 years have triggered an irreversible global warming process.

Stopping coal mining will help mitigate to some extent the plight of our children and grandchildren.

Even if coal mining and burning is stopped there may still be a need for climate engineering. But the root cause of the global warming must be addressed."
Dimitri Harakidas
Object
. , New South Wales
Message
Climate change is happening right in front of our eyes and no short term profits can ever replace our lost natural wealth. Such projects shouldn't even been considered as a concept let alone them being close to be signed off.
Megan Robinson
Object
. , New South Wales
Message
"I object to this project and believe that the community health, environmental and socioeconomic impacts will have far outweigh any short term benefits it is claimed it will deliver. These include:
1.Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2.The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3.Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4.Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5.Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6.Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7.Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8.Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9.Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10.Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS."
Jessie Winters
Object
. , New South Wales
Message
"I totally object to this project and believe that the community health, environmental and socioeconomic impacts will far outweigh any short-term benefits it is claimed the project will deliver.
These include:
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.

Yours sincerely,

Ms Jessie Winters"
Brendan Back
Object
Coogee , New South Wales
Message
"I totally object to this project and believe that the community health, environmental and socioeconomic impacts will far outweigh any short-term benefits it is claimed it will deliver.
These include:

1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.

2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).

3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.

4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.

5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.

6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.

7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.

8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.

9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.

10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.

Yours faithfully,

Mr Brendan Back"
Sam Fortey
Object
. , New South Wales
Message
"I object to this project and believe that the community health, environmental and socioeconomic impacts will far outweigh any short-term benefits it is claimed it will deliver.

These include:

1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.

2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).

3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.

4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.

5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.

6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.

7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.

8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.

9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.

10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.

Yours sincerely,

Mr S. Fortey"
Annalise FIeld
Object
. , New South Wales
Message
"I object to this project and believe that the community health, environmental and socioeconomic impacts will far outweigh any short-term benefits it is claimed it will deliver.

These include:

1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.

2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).

3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.

4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.

5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.

6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.

7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.

8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.

9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.

10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.

Yours sincerely,

Ms Annalise Field"
Margaret Foy
Object
, New South Wales
Message
"There is no need for another Coal Mine at all, particularly in this area.

The pollution caused by these mines is not acceptable in this day and age, and we need to be concentrating on Renewable Energy..

The Mining Cos have the expertise and finance to develop more renewable energy sources and so why don't they commence doing something good for the world and this country.
Jobs, profits, less pollution to clean up, and less production costs all add to Companies making as much money as they would like.




STOP COAL MINING NOW."
Vanessa Back
Object
Randwick , New South Wales
Message
"I object to this project and believe that the community health, environmental and socioeconomic impacts will far outweigh any short-term benefits it is claimed it will deliver. These include:

1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.

Yours sincerely,

Ms V. Back"