Dimitri Harakidas
Object
Dimitri Harakidas
Object
.
,
New South Wales
Message
Climate change is happening right in front of our eyes and no short term profits can ever replace our lost natural wealth. Such projects shouldn't even been considered as a concept let alone them being close to be signed off.
Megan Robinson
Object
Megan Robinson
Object
.
,
New South Wales
Message
"I object to this project and believe that the community health, environmental and socioeconomic impacts will have far outweigh any short term benefits it is claimed it will deliver. These include:
1.Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2.The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3.Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4.Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5.Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6.Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7.Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8.Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9.Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10.Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS."
1.Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2.The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3.Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4.Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5.Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6.Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7.Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8.Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9.Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10.Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS."
Jessie Winters
Object
Jessie Winters
Object
.
,
New South Wales
Message
"I totally object to this project and believe that the community health, environmental and socioeconomic impacts will far outweigh any short-term benefits it is claimed the project will deliver.
These include:
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
Yours sincerely,
Ms Jessie Winters"
These include:
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
Yours sincerely,
Ms Jessie Winters"
Brendan Back
Object
Brendan Back
Object
Coogee
,
New South Wales
Message
"I totally object to this project and believe that the community health, environmental and socioeconomic impacts will far outweigh any short-term benefits it is claimed it will deliver.
These include:
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
Yours faithfully,
Mr Brendan Back"
These include:
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
Yours faithfully,
Mr Brendan Back"
Sam Fortey
Object
Sam Fortey
Object
.
,
New South Wales
Message
"I object to this project and believe that the community health, environmental and socioeconomic impacts will far outweigh any short-term benefits it is claimed it will deliver.
These include:
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
Yours sincerely,
Mr S. Fortey"
These include:
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
Yours sincerely,
Mr S. Fortey"
Annalise FIeld
Object
Annalise FIeld
Object
.
,
New South Wales
Message
"I object to this project and believe that the community health, environmental and socioeconomic impacts will far outweigh any short-term benefits it is claimed it will deliver.
These include:
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
Yours sincerely,
Ms Annalise Field"
These include:
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
Yours sincerely,
Ms Annalise Field"
Margaret Foy
Object
Margaret Foy
Object
,
New South Wales
Message
"There is no need for another Coal Mine at all, particularly in this area.
The pollution caused by these mines is not acceptable in this day and age, and we need to be concentrating on Renewable Energy..
The Mining Cos have the expertise and finance to develop more renewable energy sources and so why don't they commence doing something good for the world and this country.
Jobs, profits, less pollution to clean up, and less production costs all add to Companies making as much money as they would like.
STOP COAL MINING NOW."
The pollution caused by these mines is not acceptable in this day and age, and we need to be concentrating on Renewable Energy..
The Mining Cos have the expertise and finance to develop more renewable energy sources and so why don't they commence doing something good for the world and this country.
Jobs, profits, less pollution to clean up, and less production costs all add to Companies making as much money as they would like.
STOP COAL MINING NOW."
Vanessa Back
Object
Vanessa Back
Object
Randwick
,
New South Wales
Message
"I object to this project and believe that the community health, environmental and socioeconomic impacts will far outweigh any short-term benefits it is claimed it will deliver. These include:
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
Yours sincerely,
Ms V. Back"
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
Yours sincerely,
Ms V. Back"
Roslyn Woodard
Object
Roslyn Woodard
Object
.
,
New South Wales
Message
"Thankyou for the opportunity to comment on the above proposal.
Firstly Australia must take steps to stop Global warming - Recent weather events must show you that what scientists have been predicting for years is true. We need to drastically cut the carbon emissions now - not keep planning for more output.
The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual Green House Gas emissions.
The proposed site is a total misuse of public conservation lands. Swan Pond is public land, owned and managed by the National Parks Service. Volunteers have worked for years to restore this wetland. I object to the government taking public land especially when it is for such an unsustainable project.
The full economics of such a project need to be considered. PWCS's claimed economic benefits to the region are based on a type of economic modeling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects.
The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably.
For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. A lot more coal dust will ensure future health risks to Newcastle residents - a significant cost on society in the future. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
There are many other aspects but enough is enough - time to pull back and access the human destruction of our planet.
Regards Ros Woodward
Wooloweyah NSW 2464"
Firstly Australia must take steps to stop Global warming - Recent weather events must show you that what scientists have been predicting for years is true. We need to drastically cut the carbon emissions now - not keep planning for more output.
The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual Green House Gas emissions.
The proposed site is a total misuse of public conservation lands. Swan Pond is public land, owned and managed by the National Parks Service. Volunteers have worked for years to restore this wetland. I object to the government taking public land especially when it is for such an unsustainable project.
The full economics of such a project need to be considered. PWCS's claimed economic benefits to the region are based on a type of economic modeling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects.
The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably.
For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. A lot more coal dust will ensure future health risks to Newcastle residents - a significant cost on society in the future. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
There are many other aspects but enough is enough - time to pull back and access the human destruction of our planet.
Regards Ros Woodward
Wooloweyah NSW 2464"
Noel Winters
Object
Noel Winters
Object
.
,
New South Wales
Message
"I object to this project and believe that the community health, environmental and socioeconomic impacts will far outweigh any short-term benefits it is claimed it will deliver.
These include:
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
Yours faithfully,
Noel Winters"
These include:
1. Global warming: The burning of an additional 70Mt of coal a year will add 174.2Mt of carbon dioxide to the atmosphere. This is equal to 30% of Australia's total annual GHG emissions. The International Energy Agency predicts that to limit global warming to under 2 degrees Celsius, global coal demand must peak in 2016, at least a year before PWCS indicates T4's will begin operation.
2. The Hunter Estuary supports 112 species of waterbirds and nationally and internationally listed threatened species, including the Australasian bittern (Botaurus poiciloptilus), listed as endangered under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
3. Deep and Swan Ponds: The Project will wipe out 80% of Deep Pond, which supports at least 11 species of migratory recorded and above the threshold of 0.1 per cent of the Australian flyway population for three migratory shorebird species, and will develop part of Swan Pond which supports three species in numbers that exceed the threshold of 0.1 per cent of the Australian flyway population.
4. Misuse of public conservation lands: Swan Pond is public land, owned and managed by the National Parks Service under Part 11 of the NSW National Parks and Wildlife Act. It is part of a highly successful long-term restoration project, the Kooragang Wetland Rehabilitation Project (KWRP) and has been the site of significant hours of volunteer labour by the local bird watching club.
5. Air quality: Newcastle and the Hunter Valley communities are impacted by dust from the mining, transport and stockpiling of coal. An additional 70Mt of coal exported will mean about an additional 7000 trips of 80 wagon trains between the Hunter mines and the port and back again per year, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley.
6. Air quality modelling flaws: PWCS's air quality modelling continues to use 2010 as a base year. NSW Health has suggested that PWCS should have included "a justification for assuming the PM10 levels in 2010 would be a realistic baseline for modelling future particulate levels or alternatively use, as a baseline, average levels over a longer period of time". This recommendation is ignored in the PPR.
7. Particle pollution from rail transport: The PPR does not address air quality issues from rail transport returning to the Upper Hunter Valley. PWCS continues to focus on air quality impacts within 20m of the rail corridor, but there are almost 30,000 people living within 500m of the rail corridor and 23,000 students attend 16 schools in that vicinity. The submission to the EA by NSW Health noted that the contribution of coal dust from coal trains beyond 20m from the rail corridor needs to be carefully considered, but this recommendation is ignored.
8. Justification for the project: There is no justification for the project. PWCS does not commit to building T4 and only suggests an indicative build date of 2015 with operation maybe in 2017. During a major downturn in global coal demand, Newcastle's approved coal export port capacity of 211Mt seems optimistic. Last year only 141Mt of coal was exported meaning 60Mt or 42 per cent of capacity was uninstalled.
9. Employment: The 120 Mt facility proposed in the EA identified no additional employment would result from its operation. The revised T4 project of 70Mt million of the RT/PPR is identified as employing 80 additional people. How is this possible? This dubious additional employment is not explained.
10. Economics: PWCS's claimed economic benefits to the region are based on a type of economic modelling the Australian Bureau of Statistics calls "biased" and the Productivity Commission says is regularly "abused", usually to overstate the economic importance of specific projects. The original economic assessment of the T4 project suggests its annual operating costs will only be between $45-50 million a year. Since that assessment was made, the size of the project has "almost halved", so the amount of money it will "inject" into the economy has presumably declined considerably. For the terminal to achieve its economic potential, a lot more coal has to be dug up and exported. This means that a lot more bush and agricultural land needs to be turned into coal mines. A lot more coal trains need to pass through Newcastle's suburbs. At the site of the proposal, a significant wetland would have to be destroyed. And, of course, the extra coal being burned would contribute to climate change. None of these costs are considered in the economic assessment commissioned by PWCS.
Yours faithfully,
Noel Winters"