SSD Modifications
Determination
MOD 4 - Stage 1 building design changes
Penrith
Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Assessment
- Recommendation
- Determination
Modification of the detailed design of the Stage 1 building (Lot F) to meet the needs on an incoming tenant. Includes increase in floor area, addition of an 18.5m high-bay storage area and a double storey car park.