State Significant Development
200 Aldington Road Industrial Estate
Penrith
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Staged development including a Concept Proposal and Stage 1 Development Application comprising estate-wide earthworks, infrastructure and services, construction, fit-out and operation of Stage 1 warehouse building.
Consolidated Consent
Modifications
Archive
Notice of Exhibition (1)
Request for SEARs (4)
SEARs (3)
EIS (44)
Response to Submissions (23)
Agency Advice (34)
Additional Information (106)
Recommendation (2)
Determination (3)
Approved Documents
Management Plans and Strategies (30)
Reports (4)
Notifications (1)
Other Documents (10)
Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
Penalty Notice issued to Concrite Pty Ltd (SSD-10479) Penrith LGA
On 10 September 2024, NSW Planning issued a $15,000 Penalty Notice to Concrite Pty Ltd (Concrite) for failing to implement the approved Construction Traffic Management Plan (CTMP) at the 200 Aldington Road Industrial Estate development. Concrite failed to provide the CTMP (containing the approved traffic routes) to their subcontractor resulting in a heavy vehicle subcontracted by Concrite turning right from Abbotts Road onto Mamre Road in contravention of the approved traffic routes on 21 June 2024. The requirement for the left turn into and out of Abbotts Road was put in place for safety and local amenity reasons until the signalised Mamre/Abbbots Road intersection is constructed. NSW Planning will continue to monitor compliance with the approved traffic routes at the development.
Official Caution issued to CJ Doyle Contracting Services Pty Ltd (SSD-10479) Penrith LGA
On 20 November 2024, NSW Planning issued an Official Caution to CJ Doyle Contracting Services Pty Ltd (CJ Doyle) for failing to implement the approved Construction Traffic Management Plan (CTMP) at the 200 Aldington Road Industrial Estate development. A CJ Doyle truck was identified turning right from Abbotts Road onto Mamre Road in contravention of the approved traffic routes. NSW Planning will continue to monitor compliance with the approved traffic routes at the development.
Official Caution issued to Simmons Civil Contracting Pty Ltd (SSD-10479) Penrith LGA
On 21 November 2024, NSW Planning issued an Official Caution to Simmons Civil Contracting Pty Ltd (Simmons Civil) for failure to implement the approved Construction Environmental Management Plan (CEMP) at the 200 Aldington Rd Industrial Estate. While dewatering a dam, sediment laden water was discharged off site. Simmons Civil have since changed their dewatering procedure to ensure this type of incident does not occur.
Inspections
20/02/2024
8/05/2024
16/05/2024
23/08/2024
7/11/2024
23/01/2025
Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.
Submissions
Crown Lands
Comment
Crown Lands
Message
ENVIRONMENT PROTECTION AUTHORITY
Comment
ENVIRONMENT PROTECTION AUTHORITY
DPI Agriculture
Comment
DPI Agriculture
Message
Attachments
Galliano Callegari
Object
Galliano Callegari
Message
Attachments
WaterNSW
Comment
WaterNSW
Message
Attachments
Western Sydney Planning Partnership
Comment
Western Sydney Planning Partnership
Name Withheld
Object
Name Withheld
Message
The proposal is unclear to the origin of the materials for the infill of the numerous damns. To support the draft DCP for the precinct, they should be limited to using fill from developments within the precinct.
Goodman Property Services (Aust) Pty Ltd
Comment
Goodman Property Services (Aust) Pty Ltd
Endeavour Energy
Comment
Endeavour Energy
Message
Attachments
- SSD-10479 EIS 200 Aldington Road Industrial Estate
- SW08773 Work near underground assets
- SW Work near overhead power lines
- ENA EMF What We Know
- EE Safety Plumbing
- EE Safety on the job
- EE MDI0044 Easements and Property Tenure
- EE Guide for Padmount Substations
- EE General Restrictions OH Power Lines Apr 2020
- EE FPJ 6007 Technical Review Request Aug 2019
- EE FPJ 4603 Permission to Remove Service July 2007
- EE Drawing 86232 OH lines minimum clearances