SSD Modifications
Determination
Modification 1 Mortdale RRF Section 4.55(1A) Application (SSD 15_7421)
Georges River
Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Assessment
- Recommendation
- Determination
Changes to processing to only produce two main product sizes >60mm and <60mm. Changes to site layout including entry and exit and new loadout bay. Reduced storage bays and changes to the maximum amount of waste that can be stored in these bays.
Project Details
Application Number
SSD-7421-Mod-1
Main Project
SSD-7421
Assessment Type
SSD Modifications
Development Type
Waste collection, treatment and disposal
Local Government Areas
Georges River
Decision
Approved
Determination Date
Decider