Mod 1 - Extend Approval Lapsing Date

Upper Lachlan Shire

Current Status: Withdrawn

Attachments & Resources

Application (3)

Submissions

Filters
Showing 181 - 200 of 437 submissions
Pamela Bleakley
Object
Chifley , Australian Capital Territory
Message
I wish to lodge my objection to AGL's proposed extension of time for
the commencement of work on the proposed gas fired power plant project
at Dalton (DPP), NSW. AGL have not provided sufficient cause for
extension.

The community distrusts them. This has been acknowledged by the
Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and
does not include recent discoveries including the population of
endangered Southern Pygmy Perch in Oolong Creek less than a few
kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its
original approval under legislation repealed in 2011 after a
corruption scandal that brought down the then NSW government. By
repealing this legislation, the NSW Government acknowledged corrupt
and unfair practices, such as undisclosed political donations made
during the assessment of the original Dalton proposal and for which
AGL have been convicted and fined. Hence it may be argued that the
original assessment and approval were made under a defective head of
authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating
technologies is such that in two years' time a gas-fired generator may
well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not
obsolete business model. The whole-of-life cost of this project to
the government and citizens of NSW may be an impediment to growth in
this state. This proposed development is at odds with the electricity
market now and in the future.

Finally the construction of this power plant will close down the
business of Vince & Janet Heffernan at "Moorlands" Dalton who supply
me and my family lamb. I object to this loss and this destruction of
their business.

Thank you
Catriona Caw
Object
Wombarra , New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Name Withheld
Object
Wahroonga , New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.

Thank you
Sylvia Hrovatin
Object
Bronte , New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family with meat from their lambs. I object to this loss and this destruction of their business.
Thank you
Suzanne Kirk
Object
Chisholm , Australian Capital Territory
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Alos the construction of this power plant will provide in the future a fallout of emisions over my home.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Name Withheld
Object
Jamison Centre , Australian Capital Territory
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW.

AGL has not provided sufficient cause for extension.

AGL has not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.

Thank you
Name Withheld
Object
Chisholm , Australian Capital Territory
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.

The emissions will pass or fall over my home. There is no real explanation of the dangers of these or the actions AGL or their associates will take to prevent this.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Marina Farid
Object
Minto , New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.

Thank you
Ricky Berghofer
Object
Wallsend , New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.

Thank you

Name Withheld
Object
Charlestown , New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.

Thank you

sher canny
Object
Cremorne , New South Wales
Message
Don't jepodise farm land or water.
Not the smart options we can do better than this.
Name Withheld
Object
Belmore , New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.

Thank you
Sam Johnson
Object
Young , New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.

Thank you
Sam Johnson
Name Withheld
Object
Thirroul , New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.

Thank you
Name Withheld
Object
Riverview , New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.

Thank you
Name Withheld
Object
Ainslie , Australian Capital Territory
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.

Thank you
Name Withheld
Object
HALL , Australian Capital Territory
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.

The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.

AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.

Thank you
Nicole Hopkins
Object
Parrerra , Queensland
Message
I object to this
Narelle Hillsdon
Object
jamberoo , New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.

AGL have not supplied adequate time for an appropriate response.

AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.

Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton . I object to this loss and this destruction of their business.

Thank you
Name Withheld
Object
Wedderburn , New South Wales
Message
I object to Dalton Power Project MOD 1. The pollution this project will cause to Dalton and the surrounds is unethical to say the least.

Pagination

Project Details

Application Number
MP10_0035-Mod-1
Main Project
MP10_0035
Assessment Type
Part3A Modifications
Development Type
Electricity generation - Other
Local Government Areas
Upper Lachlan Shire

Contact Planner

Name
Anthony Ko