Part3A Modifications
Withdrawn
Mod 1 - Extend Approval Lapsing Date
Upper Lachlan Shire
Current Status: Withdrawn
Want to stay updated on this project?
Submissions
Showing 101 - 120 of 437 submissions
Name Withheld
Object
Name Withheld
Object
West Ryde
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Name Withheld
Object
Name Withheld
Object
ashbury
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Michael Cahill
Object
Michael Cahill
Object
Summer Hill
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Peter Young
Object
Peter Young
Object
Narrabundah
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Philip Wright
Object
Philip Wright
Object
Pyrmont
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Molly Johnson
Object
Molly Johnson
Object
Young
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Name Withheld
Object
Name Withheld
Object
Surry Hills
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Paul Netherclift
Object
Paul Netherclift
Object
Warrawong
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Barbara McConchie
Object
Barbara McConchie
Object
AINSLIE
,
Australian Capital Territory
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton and I object to the loss and this destruction of their business.
Thank you
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton and I object to the loss and this destruction of their business.
Thank you
Name Withheld
Object
Name Withheld
Object
Turramurra
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Simon Venning
Object
Simon Venning
Object
Clovelly
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Simon Venning
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Simon Venning
Anna Maria Eoclidi
Object
Anna Maria Eoclidi
Object
Surry Hills
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Anna Maria Eoclidi
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Anna Maria Eoclidi
Laura Harding
Object
Laura Harding
Object
Darlinghurst
,
New South Wales
Message
I wish to lodge an objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW.
I have heard about this proposal as it will affect Vince & Janet Heffernan at "Moorlands" Dalton who supply friends lamb. I object to this loss and this destruction of their business.
I do not support the use of an environmental assessment from 7 years ago. A new proposal should have a new assessment.
I understand that the original approval was part of the controversial "Part IIIA" process introduced during the former labor government - subsequently overturned. I understand that the modification seeks to have the extension and modification dealt with under Part IIIA. This is entirely inappropriate.
The rate of development of battery and alternative generating technologies is such that these assets are likely to be unproductive in the longer term and come at great cost to the natural environment.
I request that the application be dealt with fairly - with a new assessment, under the current applicable codes.
I have heard about this proposal as it will affect Vince & Janet Heffernan at "Moorlands" Dalton who supply friends lamb. I object to this loss and this destruction of their business.
I do not support the use of an environmental assessment from 7 years ago. A new proposal should have a new assessment.
I understand that the original approval was part of the controversial "Part IIIA" process introduced during the former labor government - subsequently overturned. I understand that the modification seeks to have the extension and modification dealt with under Part IIIA. This is entirely inappropriate.
The rate of development of battery and alternative generating technologies is such that these assets are likely to be unproductive in the longer term and come at great cost to the natural environment.
I request that the application be dealt with fairly - with a new assessment, under the current applicable codes.
Name Withheld
Object
Name Withheld
Object
Gladesville
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Susan Hays
Object
Susan Hays
Object
Ainslie
,
Australian Capital Territory
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Name Withheld
Object
Name Withheld
Object
Katoomba
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Susan Hays
Object
Susan Hays
Object
Ainslie
,
Australian Capital Territory
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
David Hallam
Object
David Hallam
Object
QUEANBEYAN
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Name Withheld
Object
Name Withheld
Object
Narraweena
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Name Withheld
Object
Name Withheld
Object
Narraweena
,
New South Wales
Message
I wish to lodge my objection to AGL's proposed extension of time for the commencement of work on the proposed gas fired power plant project at Dalton (DPP), NSW. AGL have not provided sufficient cause for extension.
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
The community distrusts them. This has been acknowledged by the Department of Planning who noted AGL's appalling community consultation.
AGL have not supplied adequate time for an appropriate response.
AGL will rely on an Environmental Assessment that is 7 years old and does not include recent discoveries including the population of endangered Southern Pygmy Perch in Oolong Creek less than a few kilometres from the proposed construction.
This is a new proposal and needs a new assessment. AGL received its original approval under legislation repealed in 2011 after a corruption scandal that brought down the then NSW government. By repealing this legislation, the NSW Government acknowledged corrupt and unfair practices, such as undisclosed political donations made during the assessment of the original Dalton proposal and for which AGL have been convicted and fined. Hence it may be argued that the original assessment and approval were made under a defective head of authority which does not provide a legitimate basis for the project.
The rate of development of battery and alternative generating technologies is such that in two years' time a gas-fired generator may well be obsolete and, if built, a stranded asset.
AGL would appear to be pursuing a flawed and obsolescent if not obsolete business model. The whole-of-life cost of this project to the government and citizens of NSW may be an impediment to growth in this state. This proposed development is at odds with the electricity market now and in the future.
Finally the construction of this power plant will close down the business of Vince & Janet Heffernan at "Moorlands" Dalton who supply me and my family lamb. I object to this loss and this destruction of their business.
Thank you
Pagination
Project Details
Application Number
MP10_0035-Mod-1
Main Project
MP10_0035
Assessment Type
Part3A Modifications
Development Type
Electricity generation - Other
Local Government Areas
Upper Lachlan Shire
Contact Planner
Name
Anthony
Ko